Project overview

81 Aureate is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800010171. 81 Aureate is located at Cts No. 791 Pt. This is a Ongoing being developed by Pyramid Developers.

81 Aureate has 4 BHK Apartments with carpet areas ranging from 2209 to 2226 Sq.ft. Carpet. The Project has total 81 of which 41 are currently available for sale.

81 Aureate is being developed on a total land area of 195282 Sq.ft. out of which 14421 Sq.ft. i.e 7% is reserved for recreational purposes. 81 Aureate has 1 Wings / Towers Le-88

ProjectDeveloperLocationPossession
Project Details
  • Project:
    81 Aureate
  • Location:
  • Cts No. 791 Pt
  • Const. Stage:
    Ongoing
  • Possession:
    31 Dec 2018
Developer Details

  • Developer:
    Pyramid Developers
  • Phone:
  • Address:
  • Dheeraj Heritage
Project RERA Details
MAHA REARA No: P51800010171
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Vivek J Bhole
Funding Bank AXIS BANK
Proposed Possession 31 Dec 2018
Revised Possession 31 Dec 2018
Extended Possession 31 Dec 2019
Litigations No Litigations
Last Modified 25 Aug 2019
Last Retrived 26 Jul 2025
81 Aureate QR Code
81 Aureate
MahaRERA - P51800010171
Apartment Details & Configuration
TypeArea
4 BHK205.2 Sq.mts. ( 2209 Sq.ft. )
4 BHK206.78 Sq.mts. ( 2226 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of 81 Aureatelast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
0
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station75% completed
75% Complete
Substation As Required By Service Provider
Energy management35% completed
35% Complete
Energy Efficient Electrical Fittings And Equipment
Fire Protection And Fire Safety Requirements100% completed
95% Complete
As Per Cfo Noc
Landscaping & Tree Planting5% completed
5% Complete
Will Be Completed In Due Course
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)70% completed
70% Complete
Stp In Progress
Solid Waste Management And Disposal30% completed
30% Complete
Will Be Provided As Per Requirement
Storm Water Drains40% completed
40% Complete
As Per Swd Remarks
Street Lighting
Na
SWIMMING POOL50% completed
50% Complete
Rcc Structure Completed
Treatment And Disposal Of Sewage And Sullage Water95% completed
95% Complete
Stp
Water Conservation, Rain water Harvesting70% completed
70% Complete
0
Water Supply
Will Be Connected By Bmc After Oc
Buildings / Wings in 81 Aureate
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of 81 Aureate by Pyramid Developerslast updated on 26 Jul 2025 as per information obtained from MARA RERA.

195282 Sq. ft.

Project Area

14421 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

81 apartments in total
Total
81
Booked
40
Available
41

Saleable Area Statistics (Sq. ft.)

179285 Total
Total
179285
Booked
88572
Available
90713
Total 81 apartments in project. 40 apartments booked. 49% apartments booked.
Total 179285 Sq.ft. saleable area. 88572 saleable area booked.
49% area booked.

Le-88

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Le-88Dec 20182211140250
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
4 BHK205.2 Sq.mts. ( 2209 Sq.ft. )59
27 Booked45% Booked
45% Booked
4 BHK206.78 Sq.mts. ( 2226 Sq.ft. )22
13 Booked59% Booked
59% Booked
81 total apartments / 40 apartments booked. 49% apartments booked.
Work Description in Building Le-88Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress97% done
97% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress93% done
93% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress93% done
93% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress98% done
98% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress98% done
98% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress96% done
96% Booked
Sanitary Fittings within the flats / premises
work-in-progress96% done
96% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress94% done
94% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress94% done
94% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress97% done
97% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Pyramid Developers
for Project
81 Aureate
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation