Project overview

7 Water Front is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800020487. 7 Water Front is located at 1064. This is a New being developed by Radius Infra Holdings Private Limited.

7 Water Front has Type A 4BHK, Type B 3BHK, Type C Home Office & Type D Penthouse Apartments with carpet areas ranging from 1343 to 4276 Sq.ft. Carpet. The Project has total 39 of which 39 are currently available for sale.

7 Water Front is being developed on a total land area of 17298 Sq.ft. out of which 5367 Sq.ft. i.e 31% is reserved for recreational purposes. 7 Water Front has 1 Wings / Towers 7 Water Front

ProjectDeveloperLocationPossession
Project Details
  • Project:
    7 Water Front
  • Location:
  • 1064
  • Const. Stage:
    New
  • Possession:
    30 Dec 2025
Developer Details

  • Developer:
    Radius Infra Holdings Private Limited
  • Phone:
  • Address:
  • One Bkc
Project RERA Details
MAHA REARA No: P51800020487
Project Type Residential / Group Housing
RERA Project Status New
Architect J.T. Vatnani
Funding Bank HDFC BANK
Proposed Possession 30 Dec 2025
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 15 Apr 2019
Last Retrived 26 Jul 2025
7 Water Front QR Code
7 Water Front
MahaRERA - P51800020487
Apartment Details & Configuration
TypeArea
Type A 4BHK215.46 Sq.mts. ( 2319 Sq.ft. )
Type B 3BHK124.75 Sq.mts. ( 1343 Sq.ft. )
Type C Home Office23.8 Sq.mts. ( 256 Sq.ft. )
Type D Penthouse397.25 Sq.mts. ( 4276 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of 7 Water Frontlast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
0
Energy management
Na
Fire Protection And Fire Safety Requirements
0.0
Landscaping & Tree Planting
0
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Na
Solid Waste Management And Disposal
Na
Storm Water Drains
0
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Na
Water Supply
0
Buildings / Wings in 7 Water Front
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of 7 Water Front by Radius Infra Holdings Private Limitedlast updated on 26 Jul 2025 as per information obtained from MARA RERA.

17298 Sq. ft.

Project Area

5367 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

39 apartments in total
Total
39
Booked
0
Available
39

Saleable Area Statistics (Sq. ft.)

69618 Total
Total
69618
Booked
0
Available
69618
Total 39 apartments in project. 0 apartments booked. 0% apartments booked.
Total 69618 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.

7 Water Front

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
7 Water FrontDec 20242110170105
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Type A 4BHK215.46 Sq.mts. ( 2319 Sq.ft. )18
None Booked0% Booked
0% Booked
Type B 3BHK124.75 Sq.mts. ( 1343 Sq.ft. )17
None Booked0% Booked
0% Booked
Type C Home Office23.8 Sq.mts. ( 256 Sq.ft. )3
None Booked0% Booked
0% Booked
Type D Penthouse397.25 Sq.mts. ( 4276 Sq.ft. )1
None Booked0% Booked
0% Booked
39 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building 7 Water FrontCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Radius Infra Holdings Private Limited
for Project
7 Water Front
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation