Project overview

25HOURLIFE - Tower C1 is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700048278. 25HOURLIFE - Tower C1 is located at 2/2 (Part) & 2/5 (Part). This is a New being developed by RUNWAL DEVELOPERS PRIVATE LIMITED.

25HOURLIFE - Tower C1 has 2 BHK & 3 BHK Apartments with carpet areas ranging from 631 to 921 Sq.ft. Carpet. The Project has total 320 of which 234 are currently available for sale.

25HOURLIFE - Tower C1 is being developed on a total land area of 18030 Sq.ft. out of which 54670 Sq.ft. i.e 303% is reserved for recreational purposes. 25HOURLIFE - Tower C1 has 1 Wings / Towers Tower C1 Building No 2

ProjectDeveloperLocationPossession
Project Details
  • Project:
    25HOURLIFE - Tower C1
  • Location:
  • 2/2 (Part) & 2/5 (Part)
  • Const. Stage:
    New
  • Possession:
    31 Dec 2029
Developer Details

  • Developer:
    RUNWAL DEVELOPERS PRIVATE LIMITED
  • Phone:
  • Address:
  • Runwal And Omkar Esquare
Project RERA Details
MAHA REARA No: P51700048278
Project Type Residential / Group Housing
RERA Project Status New
Architect Ninad
Funding Bank ICICI BANK LIMITED
Proposed Possession 31 Dec 2029
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 29 Mar 2024
Last Retrived 13 Feb 2026
25HOURLIFE - Tower C1 QR Code
25HOURLIFE - Tower C1
MahaRERA - P51700048278
Apartment Details & Configuration
TypeArea
2 BHK58.6 Sq.mts. ( 631 Sq.ft. )
3 BHK85.52 Sq.mts. ( 921 Sq.ft. )
3 BHK85.53 Sq.mts. ( 921 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of 25HOURLIFE - Tower C1last updated on 13 Feb 2026 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Yet To Start
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Yet To Start
Energy management
Yet To Start
Fire Protection And Fire Safety Requirements
Yet To Start
Landscaping & Tree Planting
Yet To Start
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Yet To Start
Solid Waste Management And Disposal
Yet To Start
Storm Water Drains
Yet To Start
Street Lighting
Yet To Start
Treatment And Disposal Of Sewage And Sullage Water
Yet To Start
Water Conservation, Rain water Harvesting
Yet To Start
Water Supply
Yet To Start
Buildings / Wings in 25HOURLIFE - Tower C1
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of 25HOURLIFE - Tower C1 by RUNWAL DEVELOPERS PRIVATE LIMITEDlast updated on 13 Feb 2026 as per information obtained from MARA RERA.

18030 Sq. ft.

Project Area

54670 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

320 apartments in total
Total
320
Booked
86
Available
234

Saleable Area Statistics (Sq. ft.)

262708 Total
Total
262708
Booked
62940
Available
199768
Total 320 apartments in project. 86 apartments booked. 26% apartments booked.
Total 262708 Sq.ft. saleable area. 62940 saleable area booked.
24% area booked.

Tower C1 Building No 2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Tower C1 Building No 2Dec 20295513140260
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK58.6 Sq.mts. ( 631 Sq.ft. )110
56 Booked50% Booked
50% Booked
3 BHK85.52 Sq.mts. ( 921 Sq.ft. )110
23 Booked20% Booked
20% Booked
3 BHK85.53 Sq.mts. ( 921 Sq.ft. )100
320 total apartments / 86 apartments booked. 26% apartments booked.
Work Description in Building Tower C1 Building No 2Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress35% done
35% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress25% done
25% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
RUNWAL DEVELOPERS PRIVATE LIMITED
for Project
25HOURLIFE - Tower C1
last updated on 13 Feb 2026 as per information obtained from MARA RERA.
Name Company Location Mobile Designation