Project overview

25 South Tower A Upto 10Th Floor is a MahaRERA Registered Project bearing MahaRERA Registration Number P51900006860. 25 South Tower A Upto 10Th Floor is located at F P No 1211 Of T P S Iv. This is a Ongoing being developed by Twenty Five South Realty Limited.

25 South Tower A Upto 10Th Floor has 3 BHK & 4 BHK Apartments with carpet areas ranging from 1464 to 2928 Sq.ft. Carpet. The Project has total 36 of which 0 are currently available for sale.

25 South Tower A Upto 10Th Floor is being developed on a total land area of 11862 Sq.ft. 25 South Tower A Upto 10Th Floor has 1 Wings / Towers 25 South Upto 10Th Floor

ProjectDeveloperLocationPossession
Project Details
  • Project:
    25 South Tower A Upto 10Th Floor
  • Location:
  • F P No 1211 Of T P S Iv
  • Const. Stage:
    Ongoing
  • Possession:
    30 Dec 2026
Developer Details

  • Developer:
    Twenty Five South Realty Limited
  • Phone:
  • Address:
  • Kashinath Dhuri Marg
Project RERA Details
MAHA REARA No: P51900006860
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Spaceage Consultant
Funding Bank HDFC BANK
Proposed Possession 30 Dec 2026
Revised Possession 30 Dec 2026
Extended Possession
Litigations No Litigations
Last Modified 05 Dec 2020
Last Retrived 26 Jul 2025
25 South Tower A Upto 10Th Floor QR Code
25 South Tower A Upto 10Th Floor
MahaRERA - P51900006860
Apartment Details & Configuration
TypeArea
3 BHK272.06 Sq.mts. ( 2928 Sq.ft. )
3 BHK136.03 Sq.mts. ( 1464 Sq.ft. )
4 BHK184.05 Sq.mts. ( 1981 Sq.ft. )
4 BHK217.09 Sq.mts. ( 2337 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of 25 South Tower A Upto 10Th Floorlast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
-
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Substation/Transform
Energy management
Mseb Transformer
Fire Protection And Fire Safety Requirements100% completed
95% Complete
As Per Cfo Noc
Fitness Centre
Gymnasium
Landscaping & Tree Planting90% completed
90% Complete
On Ground &Amp; Podium
Open Parking
-
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Septic Tank
Society Office
For Society/Manager
Solid Waste Management And Disposal100% completed
95% Complete
-
Storm Water Drains100% completed
95% Complete
As Per Swd Remarks
Street Lighting90% completed
90% Complete
-
Swimming Pool
-
Treatment And Disposal Of Sewage And Sullage Water100% completed
95% Complete
-
Water Conservation, Rain water Harvesting100% completed
95% Complete
Rain Water Harvesting
Water Supply100% completed
95% Complete
Connection After Oc
Buildings / Wings in 25 South Tower A Upto 10Th Floor
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of 25 South Tower A Upto 10Th Floor by Twenty Five South Realty Limitedlast updated on 26 Jul 2025 as per information obtained from MARA RERA.

11862 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

36 apartments in total
Total
36
Booked
36
Available
0

Saleable Area Statistics (Sq. ft.)

66326 Total
Total
66326
Booked
66326
Available
0
Total 36 apartments in project. 36 apartments booked. 100% apartments booked.
Total 66326 Sq.ft. saleable area. 66326 saleable area booked.
100% area booked.

25 South Upto 10Th Floor

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
25 South Upto 10Th FloorDec 2025211317095
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
3 BHK272.06 Sq.mts. ( 2928 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK136.03 Sq.mts. ( 1464 Sq.ft. )17
17 Booked100% Booked
100% Booked
4 BHK184.05 Sq.mts. ( 1981 Sq.ft. )10
10 Booked100% Booked
100% Booked
4 BHK217.09 Sq.mts. ( 2337 Sq.ft. )8
8 Booked100% Booked
100% Booked
36 total apartments / 36 apartments booked. 100% apartments booked.
Work Description in Building 25 South Upto 10Th FloorCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Twenty Five South Realty Limited
for Project
25 South Tower A Upto 10Th Floor
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation