Project overview

25 South - Central Tower is a MahaRERA Registered Project bearing MahaRERA Registration Number P51900025184. 25 South - Central Tower is located at F.P. No.1211 Of Tps Iv. This is a New being developed by Twenty Five South Realty Limited.

25 South - Central Tower has 4 BHK & 5 BHK & more Apartments with carpet areas ranging from 4321 to 7359 Sq.ft. Carpet. The Project has total 28 of which 28 are currently available for sale.

25 South - Central Tower is being developed on a total land area of 4575 Sq.ft. 25 South - Central Tower has 1 Wings / Towers 25 South - Central Tower

ProjectDeveloperLocationPossession
Project Details
  • Project:
    25 South - Central Tower
  • Location:
  • F.P. No.1211 Of Tps Iv
  • Const. Stage:
    New
  • Possession:
    30 Dec 2028
Developer Details

  • Developer:
    Twenty Five South Realty Limited
  • Phone:
  • Address:
  • Kashinath Dhuri Marg
Project RERA Details
MAHA REARA No: P51900025184
Project Type Residential / Group Housing
RERA Project Status New
Architect Architect Hafeez Contractor
Funding Bank BANK OF BARODA
Proposed Possession 30 Dec 2028
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 23 Mar 2020
Last Retrived 26 Jul 2025
25 South - Central Tower QR Code
25 South - Central Tower
MahaRERA - P51900025184
Apartment Details & Configuration
TypeArea
4 BHK401.39 Sq.mts. ( 4321 Sq.ft. )
5 BHK & more683.63 Sq.mts. ( 7359 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of 25 South - Central Towerlast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Layout
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Substation/Transform
Energy management
Mseb Transformer
Fire Protection And Fire Safety Requirements
As Per Cfo Noc
Landscaping & Tree Planting
On Ground &Amp; Podium
Open Parking
Layout
Sewerage (Chamber, Lines, Septic Tank , STP)
Septic Tank
Solid Waste Management And Disposal
Na
Storm Water Drains
As Per Swd Remarks
Street Lighting
Layout
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Rain Water Harvesting
Water Supply
Connection After Oc
Buildings / Wings in 25 South - Central Tower
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of 25 South - Central Tower by Twenty Five South Realty Limitedlast updated on 26 Jul 2025 as per information obtained from MARA RERA.

4575 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

28 apartments in total
Total
28
Booked
0
Available
28

Saleable Area Statistics (Sq. ft.)

136166 Total
Total
136166
Booked
0
Available
136166
Total 28 apartments in project. 0 apartments booked. 0% apartments booked.
Total 136166 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.

25 South - Central Tower

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
25 South - Central TowerDec 20275610110177
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
4 BHK401.39 Sq.mts. ( 4321 Sq.ft. )23
None Booked0% Booked
0% Booked
5 BHK & more683.63 Sq.mts. ( 7359 Sq.ft. )5
None Booked0% Booked
0% Booked
28 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building 25 South - Central TowerCompletion
Basement (if any)
Excavation
work-in-progress20% done
20% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Twenty Five South Realty Limited
for Project
25 South - Central Tower
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation