Project overview
25 South - Central Tower is a MahaRERA Registered Project bearing MahaRERA Registration Number P51900025184. 25 South - Central Tower is located at F.P. No.1211 Of Tps Iv. This is a New being developed by Twenty Five South Realty Limited.
25 South - Central Tower has 4 BHK & 5 BHK & more Apartments with carpet areas ranging from 4321 to 7359 Sq.ft. Carpet. The Project has total 28 of which 28 are currently available for sale.
25 South - Central Tower is being developed on a total land area of 4575 Sq.ft. 25 South - Central Tower has 1 Wings / Towers 25 South - Central Tower
| Project | Developer | Location | Possession |
-
Project:
25 South - Central Tower
-
Location:
-
F.P. No.1211 Of Tps Iv
-
Const. Stage:
New
-
Possession:
30 Dec 2028
| MAHA REARA No: |
P51900025184 |
| Project Type |
Residential / Group Housing |
| RERA Project Status |
New |
| Architect |
Architect Hafeez Contractor |
| Funding Bank |
BANK OF BARODA |
| Proposed Possession |
30 Dec 2028 |
| Revised Possession |
|
| Extended Possession |
|
| Litigations |
No Litigations |
| Last Modified |
23 Mar 2020 |
| Last Retrived |
26 Jul 2025 |
25 South - Central Tower QR Code
25 South - Central Tower
MahaRERA - P51900025184
| Type | Area |
| 4 BHK | 401.39 Sq.mts. ( 4321 Sq.ft. ) |
| 5 BHK & more | 683.63 Sq.mts. ( 7359 Sq.ft. ) |
Facilities & Amenities
Facilities, Amenities & Common areas details of 25 South - Central Towerlast updated on 26 Jul 2025 as per information obtained from MARA RERA.
| Project Facilities & Amenities |
Available |
Details |
Aggregate area of recreational Open Space
|
|
Layout |
|
|
|
Na |
Electrical Meter Room, Sub-Station, Receiving Station
|
|
Substation/Transform |
|
|
|
Mseb Transformer |
Fire Protection And Fire Safety
Requirements
|
|
As Per Cfo Noc |
Landscaping & Tree Planting
|
|
On Ground &Amp; Podium |
|
|
|
Layout |
Sewerage (Chamber, Lines, Septic Tank , STP)
|
|
Septic Tank |
Solid Waste Management And Disposal
|
|
Na |
|
|
|
As Per Swd Remarks |
|
|
|
Layout |
Treatment And Disposal Of Sewage And Sullage Water
|
|
Na |
Water Conservation, Rain water Harvesting
|
|
Rain Water Harvesting |
|
|
|
Connection After Oc |
Buildings / Wings in 25 South - Central Tower
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of 25 South - Central Tower by Twenty Five South Realty Limitedlast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Apartments Statistics
28
apartments in total
Saleable Area Statistics (Sq. ft.)
136166
Total
Total 28 apartments in project. 0 apartments booked. 0% apartments booked.
Total 136166 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| 25 South - Central Tower | Dec 2027 | 56 | 1 | 0 | 1 | 1 | 0 | 177 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 4 BHK | 401.39 Sq.mts. ( 4321 Sq.ft. ) | 23 | |
| 5 BHK & more | 683.63 Sq.mts. ( 7359 Sq.ft. ) | 5 | |
28 total apartments / 0 apartments booked. 0% apartments booked. |
| Work Description in Building 25 South - Central Tower | Completion |
| Basement (if any) | |
| Excavation | |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Plinth | |
| Podiums (if any) | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Sanitary Fittings within the flats / premises | |
| Slabs of Super Structure | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
Channel Partners Registered by Developer
Twenty Five South Realty Limited
for Project
25 South - Central Tower
last updated on
26 Jul 2025 as per information obtained from MARA RERA.
| Name |
Company |
Location |
Mobile |
Designation |