Project overview

127 Raj Homes D Wing is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700050415. 127 Raj Homes D Wing is located at 49(127)1,2,3,5,6,8,10,11,12. This is a New being developed by Raj Homes.

127 Raj Homes D Wing has 1 BHK & 2 BHK Apartments with carpet areas ranging from 433 to 618 Sq.ft. Carpet. The Project has total 118 of which 87 are currently available for sale.

127 Raj Homes D Wing is being developed on a total land area of 6273 Sq.ft. out of which 12102 Sq.ft. i.e 193% is reserved for recreational purposes. 127 Raj Homes D Wing has 1 Wings / Towers 127 Raj Homes D Wing

ProjectDeveloperLocationPossession
127 Raj Homes A WingRaj HomesSurvey No./ Hissa No. 49(127)/10,11,1230-09-2025 00:00:00
S3 SkyriseS3 Smart Spaces Private LimitedS No 102/26 And 88/13 Of Village Mire And S No 11/1 And 11/2 Of Village Mahajanwadi Taluka And District Thane31-12-2027 00:00:00
Magic Meera HeightsMagic Star DevelopersS.No 141/2(Old)12/2(New)30-12-2025 00:00:00
127 Raj Homes B And C WingRaj HomesSurvey No./Hissa No.49(127)/10,11,1231-12-2026 00:00:00
127 Raj Homes D WingRaj Homes49(127)1,2,3,5,6,8,10,11,1231-12-2026 00:00:00
Aaradhya Highpark - Project 1 Of Phase IMan Vastucon LlpS. No. 92 - Corresponding New S. No. 13-130-03-2025 00:00:00
Aaradhya Highpark - Project 2 Of Phase IMan Vastucon LlpS. No 92 Corresponding New S. No. 13/130-03-2025 00:00:00
Imperial Heights Phase Ii - C WingAkshar Shanti Realtors Private Limited12/130-12-2026 00:00:00
A H SapphireA.H. Constructions4273,4274,427530-06-2024 00:00:00
Avighna Complex Phase IAvighnaa Infra Buildcon LlpNew Survey No 16 Hissa No 1,3,430-06-2026 00:00:00
Poonam Estate Cl 2 Blg No 1 2 3Ravi DevelopmentsOld Survey No 226 227 228 229 230 Penkarpada 150 151 Mira31-03-2018 00:00:00
Shrushti Nirman IiJay Bharati Realty401106, Thane31-12-2018 00:00:00
Aaradhya Parkwood 1Man Vastucon LlpOld Survey No 260 Part/New Survey No 12 Hissa No 231-12-2028 00:00:00
S3 SkygreensS3 Smart Spaces Private LimitedS No 102/26 And 88/13 Of Village Mire And S No 11/1 Of Village Mahajanwadi Taluka And District Thane30-06-2028 00:00:00
Aaradhya Highpark Project Iii Of Phase 1Man Vastucon LlpS.No. 92 Corresponding New S.No. 13-131-12-2025 00:00:00
Sector 2A - Wing CEversmile Properties Private LimitedOld S No.233 (New S No. 66 Pt) Of Village Penkarpada30-06-2027 00:00:00
Imperial GardenS. K. Heights Builders & Developers LlpCts No. 4276, 4277, 4299, 4300, 4301, 4321 To 4327, 4328, 4329, 4376, 4378 To 4381, 4384, 4385, 4420, 4421, 4422, 4472, 4474, 447531-03-2031 00:00:00
Surya Heritage AArun Construction CoOld Sno 272 New Sno 84 Hno 331-12-2026 00:00:00
Project Details
  • Project:
    127 Raj Homes D Wing
  • Location:
  • 49(127)1,2,3,5,6,8,10,11,12
  • Const. Stage:
    New
  • Possession:
    31 Dec 2026
Developer Details

  • Developer:
    Raj Homes
  • Phone:
  • Address:
  • Dreamland Chs Ltd
Project RERA Details
MAHA REARA No: P51700050415
Project Type Residential / Group Housing
RERA Project Status New
Architect Mr Dinanath Deshpande
Funding Bank AXIS BANK
Proposed Possession 31 Dec 2026
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 30 Jan 2024
Last Retrived 26 Jul 2025
127 Raj Homes D Wing QR Code
127 Raj Homes D Wing
MahaRERA - P51700050415
Apartment Details & Configuration
TypeArea
1 BHK40.19 Sq.mts. ( 433 Sq.ft. )
1 BHK42.37 Sq.mts. ( 456 Sq.ft. )
2 BHK57.45 Sq.mts. ( 618 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of 127 Raj Homes D Winglast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Rg Common For All Phases
Community Buildings
Club House Common For All Phases
Electrical Meter Room, Sub-Station, Receiving Station
No Receiving Station
Energy management
Solar System To Be Provided
Fire Protection And Fire Safety Requirements30% completed
30% Complete
To Be Done Before Oc
Landscaping & Tree Planting
Trees Will Be Planted
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)40% completed
40% Complete
As Per Consultant Drawing
Solid Waste Management And Disposal
As Per Consultant Drawing
Storm Water Drains
As Per Consultant Drawing
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water40% completed
40% Complete
Stp Will Be Provided (Common For All Phases)
Water Conservation, Rain water Harvesting40% completed
40% Complete
To Be Done Before Oc
Water Supply
Water Connection Will Be Given By Mbmc After Oc
Buildings / Wings in 127 Raj Homes D Wing
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of 127 Raj Homes D Wing by Raj Homeslast updated on 26 Jul 2025 as per information obtained from MARA RERA.

6273 Sq. ft.

Project Area

12102 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

118 apartments in total
Total
118
Booked
31
Available
87

Saleable Area Statistics (Sq. ft.)

53468 Total
Total
53468
Booked
14457
Available
39011
Total 118 apartments in project. 31 apartments booked. 26% apartments booked.
Total 53468 Sq.ft. saleable area. 14457 saleable area booked.
27% area booked.

127 Raj Homes D Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
127 Raj Homes D WingDec 20262011101061
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK40.19 Sq.mts. ( 433 Sq.ft. )84
21 Booked25% Booked
25% Booked
1 BHK42.37 Sq.mts. ( 456 Sq.ft. )24
5 Booked20% Booked
20% Booked
2 BHK57.45 Sq.mts. ( 618 Sq.ft. )10
5 Booked50% Booked
50% Booked
118 total apartments / 31 apartments booked. 26% apartments booked.
Work Description in Building 127 Raj Homes D WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress25% done
25% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress76% done
76% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress25% done
25% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress28% done
28% Booked
Channel Partners
Channel Partners Registered by Developer
Raj Homes
for Project
127 Raj Homes D Wing
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation