X BKC Project at Bandra East by Radius Developers (P51800004889)
  • Rating: 5.0
  • (243)

X BKC - Bandra East

Radius Developers
Project Details, Configuration & Prices
2 BHK742 Sq.ft. Carpet ₹ 3.71 Cr
3 BHK980 Sq.ft. Carpet ₹ 4.90 Cr
3 BHK1092 Sq.ft. Carpet ₹ 5.46 Cr
3 BHK1104 Sq.ft. Carpet ₹ 5.52 Cr
3 BHK1175 Sq.ft. Carpet ₹ 5.87 Cr
3 BHK1209 Sq.ft. Carpet ₹ 6.04 Cr
3 BHK1262 Sq.ft. Carpet ₹ 6.31 Cr
4 BHK1668 Sq.ft. Carpet ₹ 8.34 Cr
Project overview

X BKC Project at Bandra East by Radius Developers (P51800004889) a Project where Sales are currently on Hold with 2/3/4 BHK apartments / Flats starting from 37100000 onwards.

X BKC is a 29 storeys Under Construction Project and the location is Near MIG Cricket Club, Bandra Kalanagar Complex, Kala Nagar, Bandra East and is developed by Radius Developers.

Ten BKC is a part of one of the most premium residential project in BKC that is built while keeping in mind the evolved lifestyle that you lead. From the resplendent lobby designed by the world-renowned firm Aedas, to the tiered landscape designed by award-winning POD (Tierra Design) Singapore, every inch of the magnificent edifice has been created to cater to your every need.

Discover perfection at TEN BKC - a perfect 10 address.

  • Western Express Highway - 0.5 km
  • Eastern Express Highway - 3.8 km
  • Eastern Freeway - 10.2 km
  • Santacruz-Chembur Link Road - 5.2 km
  • Domestic Airport - 5.6 km                              
  • International Airport - 8.7 km
  • Bandra-Worli Sea Link - 4.8 km
  • Bandra Railway Station (E) - 1.2 km

X BKC was launched in Oct 2015 and the possession of the same is likely to be in Dec 2020.

X BKC is RERA approved has the Registration Number bearing P51800004889.

Radius Developers also has other under construction and ready possession and sold out projects like Imperial Heights, X BKC , Avenue 54 , 64 Greens, Radius Residency, One Aquaria, Anantya, 7 Hughes, One Mahalaxmi.

Radius Developers currently has 1 Ready Possession, 8 Under Construction projects.

The property prices in Bandra East are in the range of 28000 to 31000 for Outright for ready and under construction projects.

X BKC has good reviews and the ratings of this project are approximately 5 out of 5.

You can download the brochure and see videos of X BKC and you can see the latest digital pictures, Floor Plans, Location Plans & Rate History on our website.

Rustomjee Seasons

₹ 7.99 Crs. onwards
Bandra East
3/4 BHK apartments
View Details

Naman Residency

₹ 14.94 Crs. onwards
Bandra East
3 BHK apartments
View Details

Kanakia Paris

₹ 3.92 Crs. onwards
Bandra East
2/3 BHK apartments
View Details

Signature Island

₹ 39 Crs. onwards
Bandra East
Duplex BHK apartments
View Details

Signia Pearl

₹ 21.04 Crs. onwards
Bandra East
4 BHK apartments
View Details

Signia Isles

₹ 23.7 Crs. onwards
Bandra East
4/5 BHK apartments
View Details

Serendipity

₹ 7.32 Crs. onwards
Bandra East
3/4 BHK apartments
View Details

Sethia Grandeur

₹ 2.33 Crs. onwards
Bandra East
2 BHK apartments
View Details
Project Details
Project details were last updated in May 2021
  • Project:
    X BKC
  • Location:
  • Bandra East, Near MIG Cricket Club, Bandra Kalanagar Complex, Kala Nagar
  • Const. Stage:
    Sales on Hold
  • Possession:
    Jun 2022
  • Parking:
  • Floor:
    29
Developer Details

Radius Developers

  • Developer:
    Radius Developers
  • Phone:
    +91 22 2653 5700
  • Website:
    www.radiusdevelopers.com
  • Address:
  • ONE BKC, Wing A, 14th Floor, BKC-Bandra (East), Mumbai 400 051, Maharashtra, India
Project Ratings
Project Brochures
Brochures of X BKC by Radius Developers
Project Brochures
  • 15443 10 BKC OP DOC.pdf15443 Radius X BKC Brochure.pdf
Project Amenities
Amenities offred in X BKC
LIFESTYLE AMENITIES
Swimming PoolGymnasiumHigh speed elevatorsLandscaped gardenKid's play areaAir Conditioned LobbyIndoor GamesPower BackupClub HouseVitrified flooringMarble flooringConcealed WiringConcealed PlumbingPOP finished wallsIntercom/CCTVGranite Platform
Project RERA Details
RERA Project Status On-Going Project
Proposed Possession 06 Jun 2020
Revised Possession 06 Dec 2022
Extended Possession
Litigations Yes
Project RERA Details
MAHA REARA No: P51800004889
RERA Project Name Ten Bkc
RERA Location Madhusudan Kalelkar Marg, Bandra East, Andheri, Andheri, Mumbai Suburban, 400051
RERA Developer Mig (Bandra) Realtors &Amp; Builders Private Limited
Architect Architect Hafeez Contractor Design Architect
Project RERA Details
Project Type Residential
Funding Bank HDFC Bank Limited
Last Modified 13 Oct 2020
Last Retrived 22 Oct 2020
Facilities & Amenities
Facilities, Amenities & Common areas details of X BKC last updated on 15/06/2020 as per information obtained from MARA RERA. Disclaimer
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Refer To Architects Certifcate
Clubhouse
Refer To Layout Approval
Community Building
Na
Community Buildings
Na
Convenience Centre
Na
Convenience Store
Refer To Architects Certifcate
Electrical Meter Room, Sub-Station, Receiving Station
Refer To Architects Certifcate
Energy management
Na
Fire Protection And Fire Safety Requirements
Refer To Architects Certifcate
Fitness Centre
Refer To Architects Certifcate
Game Simulator
Refer To Architects Certifcate
Kids Play Area
Na
Kids Play Area with play Equipment
Refer To Architects Certifcate
Kids Pool
Na
Landscaping & Tree Planting
Refer To Architects Certifcate
Multipurpose Hall
Refer To Architects Certifcate
Open Parking
Na
Reflexology Path
Refer To Architects Certifcate
Salon and Spa
Refer To Architects Certifcate
Senior Citizen Area
Refer To Architects Certifcate
Sewerage (Chamber, Lines, Septic Tank , STP)
Refer To Architects Certifcate
Solid Waste Management And Disposal
Refer To Architects Certifcate
Squash Court
Refer To Architects Certifcate
Storm Water Drains
Refer To Architects Certifcate
Street Lighting
Refer To Architects Certifcate
Swimming Pool
Na
Swimming Pool including Kids Pool
Refer To Architects Certifcate
Tiered Landscape Gardens
Na
Treatment And Disposal Of Sewage And Sullage Water
Refer To Architects Certifcate
Walking Path
Refer To Architects Certifcate
Water Conservation, Rain water Harvesting
Refer To Architects Certifcate
Water Supply
Refer To Architects Certifcate
Welfare Centre
Na
Buildings / Wings in X BKC
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of X BKC by Radius Developerslast updated on 15/06/2020 as per information obtained from MARA RERA. Disclaimer

216888 Sq. ft.

Project Area

45662 Sq. ft.

Recreational Open Space

Total 15

Wings / Towers in Project

Apartments Statistics

722 apartments in total
Total
722
Booked
348
Available
374

Saleable Area Statistics (Sq. ft.)

902204 Total
Total
902204
Booked
415209
Available
486995
Total 722 apartments in project. 348 apartments booked. 48% apartments booked.
Total 83816.81 saleable area. 38573.87 apartments booked.
46% area booked.

Wing 1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing 1Jun 2022241500055
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
W1 101 3BHK DD128.26 Sq.mts. ( 1381 Sq.ft. )1
None Booked0% Booked
0% Booked
W1 1401 4BHK B148.18 Sq.mts. ( 1595 Sq.ft. )1
None Booked0% Booked
0% Booked
W1 1402 6BHK DUP B306.56 Sq.mts. ( 3300 Sq.ft. )1
None Booked0% Booked
0% Booked
W1 201 3BHK DD128.26 Sq.mts. ( 1381 Sq.ft. )1
None Booked0% Booked
0% Booked
W1 2101 3BK CC127.34 Sq.mts. ( 1371 Sq.ft. )1
None Booked0% Booked
0% Booked
W1 301 3BHK DD128.26 Sq.mts. ( 1381 Sq.ft. )1
None Booked0% Booked
0% Booked
W1 701 4BHK A148.16 Sq.mts. ( 1595 Sq.ft. )1
1 Booked100% Booked
100% Booked
W1 702 6BHK DUPLEX C318.82 Sq.mts. ( 3432 Sq.ft. )1
None Booked0% Booked
0% Booked
W1 X01 3BHK EE128.46 Sq.mts. ( 1383 Sq.ft. )16
None Booked0% Booked
0% Booked
W1 X02 4BHK I195.52 Sq.mts. ( 2105 Sq.ft. )18
6 Booked33% Booked
33% Booked
42 total apartments / 7 apartments booked. 16% apartments booked.
Work Description in Building Wing 1Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress43% done
43% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure

Wing 10

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing 10Jun 2022241500037
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
W10 X01 2BHK B68.89 Sq.mts. ( 742 Sq.ft. )17
11 Booked64% Booked
64% Booked
W10 X02 3BHK A91.02 Sq.mts. ( 980 Sq.ft. )19
9 Booked47% Booked
47% Booked
36 total apartments / 20 apartments booked. 55% apartments booked.
Work Description in Building Wing 10Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress47% done
47% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress25% done
25% Booked

Wing 11

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing 11Jun 2022241500080
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
W11 702 3BHK S114.4 Sq.mts. ( 1231 Sq.ft. )1
1 Booked100% Booked
100% Booked
W11 X01 3BHK C94.98 Sq.mts. ( 1022 Sq.ft. )21
7 Booked33% Booked
33% Booked
W11 X02 3BHK B87.25 Sq.mts. ( 939 Sq.ft. )20
7 Booked35% Booked
35% Booked
W11 XO3 3BHK I104.07 Sq.mts. ( 1120 Sq.ft. )19
61 total apartments / 18 apartments booked. 29% apartments booked.
Work Description in Building Wing 11Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress44% done
44% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure

Wing 12

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing 12Jun 2022241500055
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
W12 1401 2BHK H88.44 Sq.mts. ( 952 Sq.ft. )1
None Booked0% Booked
0% Booked
W12 701 3BHK PP127.43 Sq.mts. ( 1372 Sq.ft. )1
None Booked0% Booked
0% Booked
W12 X01 3BHK E97.18 Sq.mts. ( 1046 Sq.ft. )20
9 Booked45% Booked
45% Booked
W12 X02 3BHK E97.15 Sq.mts. ( 1046 Sq.ft. )20
9 Booked45% Booked
45% Booked
42 total apartments / 18 apartments booked. 42% apartments booked.
Work Description in Building Wing 12Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress44% done
44% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure

Wing 13

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing 13Jun 2022241500055
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
W13 702 3BHK T116.06 Sq.mts. ( 1249 Sq.ft. )1
1 Booked100% Booked
100% Booked
W13 X01 3BHK D96.1 Sq.mts. ( 1034 Sq.ft. )20
14 Booked70% Booked
70% Booked
W13 X02 3BHK R112.38 Sq.mts. ( 1210 Sq.ft. )21
13 Booked61% Booked
61% Booked
42 total apartments / 28 apartments booked. 66% apartments booked.
Work Description in Building Wing 13Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress35% done
35% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress83% done
83% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing 14

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing 14Jun 2022241500055
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
W14 1302 4BHK DUP A155.64 Sq.mts. ( 1675 Sq.ft. )1
1 Booked100% Booked
100% Booked
W14 602 4BHK DUP C157.25 Sq.mts. ( 1693 Sq.ft. )1
None Booked0% Booked
0% Booked
W14 X01 3BHK M106.15 Sq.mts. ( 1143 Sq.ft. )22
16 Booked72% Booked
72% Booked
W14 X02 3BHK M106.13 Sq.mts. ( 1142 Sq.ft. )18
13 Booked72% Booked
72% Booked
42 total apartments / 30 apartments booked. 71% apartments booked.
Work Description in Building Wing 14Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress47% done
47% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure

Wing 15

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing 15Jun 2022241500055
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
W15 1402 3BHK FF126.56 Sq.mts. ( 1362 Sq.ft. )1
1 Booked100% Booked
100% Booked
W15 702 4BHK E155.41 Sq.mts. ( 1673 Sq.ft. )1
1 Booked100% Booked
100% Booked
W15 X01 3BHK L103.78 Sq.mts. ( 1117 Sq.ft. )20
7 Booked35% Booked
35% Booked
W15 X02 3BHK JJ128.73 Sq.mts. ( 1386 Sq.ft. )20
9 Booked45% Booked
45% Booked
42 total apartments / 18 apartments booked. 42% apartments booked.
Work Description in Building Wing 15Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress47% done
47% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure

Wing 2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing 2Jun 2022241500050
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
W2 1302 5BHK DUP A182.16 Sq.mts. ( 1961 Sq.ft. )1
None Booked0% Booked
0% Booked
W2 2101 3BHK DUP E416.79 Sq.mts. ( 4486 Sq.ft. )1
1 Booked100% Booked
100% Booked
W2 X01 3BHK N106.32 Sq.mts. ( 1144 Sq.ft. )18
4 Booked22% Booked
22% Booked
W2 X02 3BHK QQ106.11 Sq.mts. ( 1142 Sq.ft. )18
38 total apartments / 8 apartments booked. 21% apartments booked.
Work Description in Building Wing 2Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress43% done
43% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure

Wing 3

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing 3Jun 2022241500079
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
W3 1402 4BHK J203.39 Sq.mts. ( 2189 Sq.ft. )1
1 Booked100% Booked
100% Booked
W3 1502 6BHK DUP D323.57 Sq.mts. ( 3483 Sq.ft. )1
None Booked0% Booked
0% Booked
W3 1702 6BHK DUP E323.46 Sq.mts. ( 3482 Sq.ft. )1
1 Booked100% Booked
100% Booked
W3 1902 6BHK DUP E323.46 Sq.mts. ( 3482 Sq.ft. )1
1 Booked100% Booked
100% Booked
W3 2102 6BHK DUP A323.57 Sq.mts. ( 3483 Sq.ft. )1
None Booked0% Booked
0% Booked
W3 603 4BHK DUP B157.18 Sq.mts. ( 1692 Sq.ft. )1
None Booked0% Booked
0% Booked
W3 X01 3BHK K103.07 Sq.mts. ( 1109 Sq.ft. )22
None Booked0% Booked
0% Booked
W3 X02 4BHK F182.09 Sq.mts. ( 1960 Sq.ft. )13
3 Booked23% Booked
23% Booked
W3 X03 3BHK HH127.85 Sq.mts. ( 1376 Sq.ft. )19
None Booked0% Booked
0% Booked
60 total apartments / 6 apartments booked. 10% apartments booked.
Work Description in Building Wing 3Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress43% done
43% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure

Wing 4

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing 4Jun 2022241500055
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
W4 1402 3BHK NN133.89 Sq.mts. ( 1441 Sq.ft. )1
None Booked0% Booked
0% Booked
W4 702 4BHK D153.16 Sq.mts. ( 1649 Sq.ft. )1
None Booked0% Booked
0% Booked
W4 X01 3BHK BB126.24 Sq.mts. ( 1359 Sq.ft. )20
None Booked0% Booked
0% Booked
W4 X02 3BHK II128.51 Sq.mts. ( 1383 Sq.ft. )20
None Booked0% Booked
0% Booked
42 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Wing 4Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress65% done
65% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress71% done
71% Booked

Wing 5

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing 5Jun 2022311500030
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
W5 101 2BHK D76.71 Sq.mts. ( 826 Sq.ft. )1
1 Booked100% Booked
100% Booked
W5 201 2BHK D76.71 Sq.mts. ( 826 Sq.ft. )1
1 Booked100% Booked
100% Booked
W5 2401 TRIPLEX543.31 Sq.mts. ( 5848 Sq.ft. )1
None Booked0% Booked
0% Booked
W5 2601 4BHK H208.57 Sq.mts. ( 2245 Sq.ft. )1
1 Booked100% Booked
100% Booked
W5 2701 4BHK K199.94 Sq.mts. ( 2152 Sq.ft. )1
1 Booked100% Booked
100% Booked
W5 2901 4BHK DUP D355.12 Sq.mts. ( 3823 Sq.ft. )1
1 Booked100% Booked
100% Booked
W5 301 2BHK D76.71 Sq.mts. ( 826 Sq.ft. )1
1 Booked100% Booked
100% Booked
W5 X01 2BHK E83.45 Sq.mts. ( 898 Sq.ft. )16
16 Booked100% Booked
100% Booked
23 total apartments / 22 apartments booked. 95% apartments booked.
Work Description in Building Wing 5Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress58% done
58% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress65% done
65% Booked

Wing 6

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing 6Jun 2022311500030
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
W6 1402 3BHK OO103.12 Sq.mts. ( 1110 Sq.ft. )1
None Booked0% Booked
0% Booked
W6 2102 3BHK J103.25 Sq.mts. ( 1111 Sq.ft. )1
1 Booked100% Booked
100% Booked
W6 2802 3BHK Q109.34 Sq.mts. ( 1177 Sq.ft. )1
None Booked0% Booked
0% Booked
W6 702 3BHK H103.33 Sq.mts. ( 1112 Sq.ft. )1
1 Booked100% Booked
100% Booked
W6 X02 4BHK C149.33 Sq.mts. ( 1607 Sq.ft. )19
11 Booked57% Booked
57% Booked
23 total apartments / 13 apartments booked. 56% apartments booked.
Work Description in Building Wing 6Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress20% done
20% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress58% done
58% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress65% done
65% Booked

Wing 7

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing 7Jun 2022311500076
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
W7 1403 3BHK LL136.62 Sq.mts. ( 1471 Sq.ft. )1
None Booked0% Booked
0% Booked
W7 2103 3BHK MM136.7 Sq.mts. ( 1471 Sq.ft. )1
1 Booked100% Booked
100% Booked
W7 2802 4BHK DUP A191.82 Sq.mts. ( 2065 Sq.ft. )1
None Booked0% Booked
0% Booked
W7 703 3BHK X136.62 Sq.mts. ( 1471 Sq.ft. )1
1 Booked100% Booked
100% Booked
W7 X02 4BHK G196.2 Sq.mts. ( 2112 Sq.ft. )15
10 Booked66% Booked
66% Booked
W7 X03 3BHK Z124.71 Sq.mts. ( 1342 Sq.ft. )26
16 Booked61% Booked
61% Booked
W7 X04 3BHK GG133.66 Sq.mts. ( 1439 Sq.ft. )14
9 Booked64% Booked
64% Booked
59 total apartments / 37 apartments booked. 62% apartments booked.
Work Description in Building Wing 7Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress21% done
21% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress65% done
65% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress87% done
87% Booked

Wing 8

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing 8Jun 2022311500082
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
W8 1303 3BHK DUP D116.02 Sq.mts. ( 1249 Sq.ft. )1
1 Booked100% Booked
100% Booked
W8 2103 3BHK DUP B111.3 Sq.mts. ( 1198 Sq.ft. )1
1 Booked100% Booked
100% Booked
W8 2802 2BHK G90.21 Sq.mts. ( 971 Sq.ft. )1
None Booked0% Booked
0% Booked
W8 2903 1BHK G57.56 Sq.mts. ( 620 Sq.ft. )1
None Booked0% Booked
0% Booked
W8 703 3BHK DUP C115.82 Sq.mts. ( 1247 Sq.ft. )1
1 Booked100% Booked
100% Booked
W8 X01 3BHK O113.57 Sq.mts. ( 1222 Sq.ft. )2
2 Booked100% Booked
100% Booked
W8 X02 3BHK U123.24 Sq.mts. ( 1327 Sq.ft. )25
15 Booked60% Booked
60% Booked
W8 X03 3BHK DUP A110.91 Sq.mts. ( 1194 Sq.ft. )11
10 Booked90% Booked
90% Booked
W8 X04 3BHK P114.55 Sq.mts. ( 1233 Sq.ft. )20
17 Booked85% Booked
85% Booked
63 total apartments / 47 apartments booked. 74% apartments booked.
Work Description in Building Wing 8Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress21% done
21% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress65% done
65% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress87% done
87% Booked

Wing 9

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing 9Jun 20223115000121
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
W9 1404 3BHK KK131.46 Sq.mts. ( 1415 Sq.ft. )1
None Booked0% Booked
0% Booked
W9 2104 3BHK V114.66 Sq.mts. ( 1234 Sq.ft. )1
1 Booked100% Booked
100% Booked
W9 2204 3BHK V114.66 Sq.mts. ( 1234 Sq.ft. )1
None Booked0% Booked
0% Booked
W9 2304 3BHK W114.71 Sq.mts. ( 1235 Sq.ft. )1
None Booked0% Booked
0% Booked
W9 2404 5BHK DUP C243.17 Sq.mts. ( 2617 Sq.ft. )1
None Booked0% Booked
0% Booked
W9 2604 3BHK AA123.47 Sq.mts. ( 1329 Sq.ft. )1
None Booked0% Booked
0% Booked
W9 2704 5BHK DUP B214.72 Sq.mts. ( 2311 Sq.ft. )1
None Booked0% Booked
0% Booked
W9 2803 1BHK F52.97 Sq.mts. ( 570 Sq.ft. )1
None Booked0% Booked
0% Booked
W9 2904 3BHK Y114.82 Sq.mts. ( 1236 Sq.ft. )1
None Booked0% Booked
0% Booked
W9 704 3BHK Z123.6 Sq.mts. ( 1330 Sq.ft. )1
1 Booked100% Booked
100% Booked
W9 X01 2BHK A68.8 Sq.mts. ( 741 Sq.ft. )28
24 Booked85% Booked
85% Booked
W9 X02 3BHK F102.38 Sq.mts. ( 1102 Sq.ft. )25
20 Booked80% Booked
80% Booked
W9 X03 2BHK C71.78 Sq.mts. ( 773 Sq.ft. )27
24 Booked88% Booked
88% Booked
W9 X04 3BHK G99.57 Sq.mts. ( 1072 Sq.ft. )17
6 Booked35% Booked
35% Booked
107 total apartments / 76 apartments booked. 71% apartments booked.
Work Description in Building Wing 9Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress47% done
47% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress29% done
29% Booked
Project Consultants
Channel Partners Registered by Developer
Radius Developers
for Project
Ten Bkc
last updated on 15/06/2020 as per information obtained from MARA RERA. Disclaimer
Name Company Location Mobile Designation

About Radius Developers

Radius Developers Spearheaded by Sanjay Chhabria as its Managing Director, Radius is a modern take on Mumbai’s real estate. Team Radius is a blend of professional flair and entrepreneurial passion. Sanjay is a renowned and respected member of Mumbai’s real estate fraternity and Radius is his independent foray into real estate.Radius is an amalgamation of integrity, transparency and an ability to deliver challenging projects on time. Radius is an outcome of the succession plan at the Wadhwa Group where Sanjay led the business as a Managing Director for over a decade. With founding principles imbibed from the Wadhwa Group we endeavour to hoist this value-legacy even higher with exquisite designs, latest technology and earnest ambition. Above all, everything that we do will be built around all our stakeholders.Each development by Radius is an affirmation of its dedication. We bring to life unique concepts in urban real estate which remain faithful to the philosophy of ‘Built around you’.