Datta Ramanand Project at Vile Parle East by Disha Construction (P51800001236)
  • Rating: 3.7
  • (15)

Datta Ramanand - Vile Parle East

Disha Construction
Project Details, Configuration & Prices
2 BHK718 Sq.ft. Carpet ₹ 3.26 cr All Inclusive
2 BHK753 Sq.ft. Carpet ₹ 3.41 cr All Inclusive
3 BHK888 Sq.ft. Carpet ₹ 3.9 Cr + Stamp Duty + Registration
2 BHK800 Sq.ft. Carpet ₹ 3.62 cr All Inclusive
Project overview

Datta Ramanand Project at Vile Parle East by Disha Construction (P51800001236) is a Ready Possession Project with 2/3 BHK apartments / Flats starting from 32310000 onwards.

Strategically located at Vile Parle (East), Datta Ramanand CHS Ltd will combine the finest features and lifestyle amenities. Prospective home seeker will have the option of choosing from spacious 1, 2 & 3 BHKs apartments. Ready Possesion. OC received.

Sheela Smruti

₹ 2.4 Crs. onwards
Vile Parle East
2/3 BHK apartments
View Details
Vile Parle East
2/3 BHK apartments
View Details

Jai Vijay

₹ 2.62 Crs. onwards
Vile Parle East
2 BHK apartments
View Details

Crimson Bay

₹ 3.48 Crs. onwards
Vile Parle East
2/3 BHK apartments
View Details

East Eden

₹ 2.42 Crs. onwards
Vile Parle East
2 BHK apartments
View Details

Shamik Elegant

₹ 3.13 Crs. onwards
Vile Parle East
2/3 BHK apartments
View Details

Sayaji Crest

₹ 2 Crs. onwards
Vile Parle East
1/2/3/4 BHK apartments
View Details

Vijayraj Residency

₹ 1.52 Crs. onwards
Vile Parle East
1/1 RK/1½/2/3 BHK apartments
View Details
Project Details
Project details were last updated in Mar 2021
  • Project:
    Datta Ramanand
  • Location:
  • Vile Parle East, Near Hanuman Cross Road No.2. Nr, Shivaji Vidyalaya School
  • Const. Stage:
    Ready Possession
  • Possession:
  • Parking:
  • Floor:
    6
Developer Details

Disha Construction

  • Developer:
    Disha Construction
  • Phone:
    022 66996042
  • Website:
    www.disha-construction.com
  • Address:
  • 2nd Floor, Square One, Gulmohar Road, Vile Parle (west) - Mumbai.
Project Ratings
Project Amenities
Amenities offred in Datta Ramanand
LIFESTYLE AMENITIES
Grand entrance lobbyHigh speed elevatorsKid's play areaPower BackupVitrified flooringConcealed WiringImported Sanitary FittingsPOP finished wallsAluminium Sliding WindowsIntercom/CCTVConcealed PlumbingGranite Platform
Project RERA Details
RERA Project Status On-Going Project
Proposed Possession 08 Apr 2019
Revised Possession 31 Dec 2019
Extended Possession 30 Jun 2021
Litigations Yes
Project RERA Details
MAHA REARA No: P51800001236
RERA Project Name Datta Ramanand Chs Ltd
RERA Location Hanuman X Road No.2, Vile Parle (E), Andheri, Andheri, Mumbai Suburban, 400057
RERA Developer Disha Construction
Architect Premal Gogri
Project RERA Details
Project Type Residential
Funding Bank HDFC BANK
Last Modified 13 Oct 2020
Last Retrived 21 Oct 2020
Facilities & Amenities
Facilities, Amenities & Common areas details of Datta Ramanandlast updated on 15/06/2020 as per information obtained from MARA RERA. Disclaimer
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space100% completed
95% Complete
Completed
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Completed
Energy management
Na
Fire Protection And Fire Safety Requirements100% completed
95% Complete
Completed
Landscaping & Tree Planting100% completed
95% Complete
Completed
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Completed
Solid Waste Management And Disposal100% completed
95% Complete
Completed
Storm Water Drains100% completed
95% Complete
Completed
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting100% completed
95% Complete
Completed
Water Supply100% completed
95% Complete
Completed
Buildings / Wings in Datta Ramanand
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Datta Ramanandby Disha Constructionlast updated on 15/06/2020 as per information obtained from MARA RERA. Disclaimer

48158 Sq. ft.

Project Area

9623 Sq. ft.

Recreational Open Space

Total 9

Wings / Towers in Project

Apartments Statistics

61 apartments in total
Total
61
Booked
14
Available
47

Saleable Area Statistics (Sq. ft.)

37073 Total
Total
37073
Booked
9774
Available
27298
Total 61 apartments in project. 14 apartments booked. 22% apartments booked.
Total 3444.13 saleable area. 908.05 apartments booked.
26% area booked.

A Wing Phase 1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
A Wing Phase 1Jun 202161100025
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
00 Sq.mts. ( 0 Sq.ft. )0
None Booked0% Booked
0% Booked
1 BHK33.82 Sq.mts. ( 364 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK34.56 Sq.mts. ( 372 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK38 Sq.mts. ( 409 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK47.85 Sq.mts. ( 515 Sq.ft. )1
None Booked0% Booked
0% Booked
4 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building A Wing Phase 1Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress83% done
83% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress83% done
83% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Stilt Floor
work-in-progress60% done
60% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

B Wing Phase 1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
B Wing Phase 1Dec 201961100026
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK32.79 Sq.mts. ( 353 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK34.19 Sq.mts. ( 368 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK34.56 Sq.mts. ( 372 Sq.ft. )2
None Booked0% Booked
0% Booked
4 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building B Wing Phase 1Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress83% done
83% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress83% done
83% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Stilt Floor
work-in-progress60% done
60% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

C Wing Phase 1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
C Wing Phase 1Dec 201961100024
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK59.64 Sq.mts. ( 642 Sq.ft. )2
2 Booked100% Booked
100% Booked
2 total apartments / 2 apartments booked. 100% apartments booked.
Work Description in Building C Wing Phase 1Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress83% done
83% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress83% done
83% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Stilt Floor
work-in-progress60% done
60% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

D Wing Phase 1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
D Wing Phase 1Dec 201961100025
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK37.9 Sq.mts. ( 408 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK66.76 Sq.mts. ( 719 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK68.85 Sq.mts. ( 741 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 total apartments / 2 apartments booked. 66% apartments booked.
Work Description in Building D Wing Phase 1Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress83% done
83% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress83% done
83% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Stilt Floor
work-in-progress60% done
60% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

E Wing Phase 1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
E Wing Phase 1Dec 201961100019
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK34.56 Sq.mts. ( 372 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK38 Sq.mts. ( 409 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK38.83 Sq.mts. ( 418 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK66.63 Sq.mts. ( 717 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK66.75 Sq.mts. ( 718 Sq.ft. )1
None Booked0% Booked
0% Booked
5 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building E Wing Phase 1Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress83% done
83% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress83% done
83% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Stilt Floor
work-in-progress60% done
60% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

F Wing Phase 1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
F Wing Phase 1Dec 201961100019
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK34.56 Sq.mts. ( 372 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK36.42 Sq.mts. ( 392 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK43.76 Sq.mts. ( 471 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK47.85 Sq.mts. ( 515 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK66.26 Sq.mts. ( 713 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK66.75 Sq.mts. ( 718 Sq.ft. )1
None Booked0% Booked
0% Booked
6 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building F Wing Phase 1Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress83% done
83% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress83% done
83% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Stilt Floor
work-in-progress60% done
60% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

G Wing Phase 1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
G Wing Phase 1Dec 201961100019
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK35.86 Sq.mts. ( 386 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK41.77 Sq.mts. ( 450 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK41.81 Sq.mts. ( 450 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK47.66 Sq.mts. ( 513 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK47.75 Sq.mts. ( 514 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK63.57 Sq.mts. ( 684 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK67.51 Sq.mts. ( 727 Sq.ft. )1
1 Booked100% Booked
100% Booked
7 total apartments / 4 apartments booked. 57% apartments booked.
Work Description in Building G Wing Phase 1Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress83% done
83% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress83% done
83% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Stilt Floor
work-in-progress60% done
60% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

H Wing Phase 1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
H Wing Phase 1Dec 201961100025
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK34.1 Sq.mts. ( 367 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK37.07 Sq.mts. ( 399 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK47.75 Sq.mts. ( 514 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK66.84 Sq.mts. ( 719 Sq.ft. )2
2 Booked100% Booked
100% Booked
2 BHK74.3 Sq.mts. ( 800 Sq.ft. )5
None Booked0% Booked
0% Booked
10 total apartments / 2 apartments booked. 20% apartments booked.
Work Description in Building H Wing Phase 1Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress83% done
83% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress83% done
83% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Stilt Floor
work-in-progress60% done
60% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

I Wing Phase 1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
I Wing Phase 1Dec 201961100023
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK44.59 Sq.mts. ( 480 Sq.ft. )1
None Booked0% Booked
0% Booked
1RK26.94 Sq.mts. ( 290 Sq.ft. )1
None Booked0% Booked
0% Booked
1RK27.59 Sq.mts. ( 297 Sq.ft. )1
None Booked0% Booked
0% Booked
3 BHK69.92 Sq.mts. ( 753 Sq.ft. )12
3 BHK82.49 Sq.mts. ( 888 Sq.ft. )5
2 Booked40% Booked
40% Booked
20 total apartments / 4 apartments booked. 20% apartments booked.
Work Description in Building I Wing Phase 1Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress83% done
83% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress83% done
83% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Stilt Floor
work-in-progress60% done
60% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Project Consultants
Channel Partners Registered by Developer
Disha Construction
for Project
Datta Ramanand Chs Ltd
last updated on 15/06/2020 as per information obtained from MARA RERA. Disclaimer
Name Company Location Mobile Designation

About Disha Construction

Disha Construction DISHA the vision to build homes …. Homes where people enjoy their happiness, share their grief, celebrate their victories and achievements and mourn loss. Mr. M. J. Shah has been the visionary behind DISHA for the last 30 years. Since its inception the company has created several landmarks including residential, commercial premises assuring quality and time bound possession.