Project overview

Avenue 54 Project at Santacruz West by Radius Developers (P51800007149) a Project where Sales are currently on Hold with 3/4/5/5½ BHK apartments / Flats starting from 82600000 onwards.

Avenue 54 - THE ULTIMATE BENCHMARK IN LUXURY LIVING, is a 18 storey Under Construction Project and the location is Next to St.Teresa's convent high school, S.V.Road, Santacruz West and is developed by Radius Developers. Avenue 54 was launched in Feb 2016 and the possession of the same is likely to be in Dec 2020.

Avenue 54 is RERA approved has the Registration Number bearing P51800007149.

Well designed Amenities like Power Backup Outdoor Games Club House Swimming Pool High speed elevators Gymnasium Jogging Track Video Door Phones Air Conditioners Aluminium Sliding Windows POP finished walls Imported Sanitary Fittings Concealed Plumbing Concealed Wiring Marble flooring Vitrified flooring Piped Gas Kitchen Cabinets Modular Kitchen Granite Platform Reception Desk Multi Purpose Hall are planned to be provided in Avenue 54 .

Radius Avenue 54 Highlights:

  • Spread over an expanse of 6.45 acres in Santacruz West.
  • Bespoke 2,3,4,5 Bedrooms well designed
  • 1.2 lac sqft of independent 10 storeys Club House having world class amenities.
  • Glorious Panaromic view of Arabian Sea and City Skyline
  • 70% Open Spaces with 30% ground coverage
  • Exclusive elevators for 5BHK and 6BHK opening directly to the apartments
  • Spacious well ventilated homes with abundant sunlight.
  • A gated community consisting of luxurious towers spread over 6.5 acres of proposed sprawling life.
  • Designed by Aedas: Master Planner & Principal Design Consultant AEDAS Pte. Ltd. Singapore
  • Access Architects: Design Consultant Access Design Studio
  • Luxurious & Capacious Residences with state-of-the-art amenities.
  • Kids Zone: Children’s Play Area, Crèche, Games Room, Pool Tables, Carom, Chess, Air Hockey, Foosball, Video Arcade Games, Kids pool, Mini Climbing wall.
  • Sports Zone: Squash Courts, Table Tennis, Cricket  Simulator, Snooker/ Billiards, Two lane Bowling alley, Multipurpose Court, Trampoline Park.
  • Social Spaces: Restaurant & Café, Multipurpose hall, Mini Theatre, Party Lawn, Library, Olympic Size Swimming Pool,  Restaurant, Café, Party Lawn, Florist.
  • Luxurious Fitness Centre: SPA, Salon, Yoga Lawns,  Gym, Health presence, Elderly Social Space, Adult Fitness, Game Tables.

Radius Developers also has other under construction and ready possession and sold out projects like Imperial Heights, X BKC , Avenue 54 , 64 Greens, Radius Residency, One Aquaria, Anantya, 7 Hughes.
Radius Developers currently has 2 Ready Possession, 5 Under Construction projects.

The property prices in Santacruz West are in the range of 29500 to 38000 for Outright for ready and under construction projects.

Avenue 54 has good reviews and the ratings of this project are approximately 5 out of 5.

You can download the brochure and see video of Avenue 54 and you can see the latest digital pictures, Floor Plans, Location Plans & Rate History on our website.
The Bookings for the Under Construction project Avenue 54 are open and we can set up a Site Visit any time at your Convenience.
Avenue 54 is approved by most of the Banks and for more details on the approved bank list, please connect with us.

Kalpataru Imperia

₹ 6.25 Crs. onwards
Santacruz West
3 BHK apartments
View Details

Ekta Trinity

₹ 4.66 Crs. onwards
Santacruz West
2/3/4/5/6 BHK apartments
View Details

Oberoi Priviera

₹ 17 Crs. onwards
Santacruz West
3/4 BHK apartments
View Details

Shamik Elite

₹ 4.6 Crs. onwards
Santacruz West
3 BHK apartments
View Details

Kabra Ajanta

₹ 2.7 Crs. onwards
Santacruz West
2/3 BHK apartments
View Details

Sanjeevani

₹ 5.9 Crs. onwards
Santacruz West
3/5 BHK apartments
View Details

Lilium

₹ 7.42 Crs. onwards
Santacruz West
4 BHK apartments
View Details

Shiv Hem

₹ 5.75 Crs. onwards
Santacruz West
3/4 BHK apartments
View Details
Project Details
Project details were last updated in May 2021
  • Project:
    Avenue 54
  • Location:
  • Santacruz West, Next to St.Teresa's convent high school, S.V.Road
  • Const. Stage:
    Sales on Hold
  • Possession:
    Dec 2023
  • Parking:
  • Floor:
    18
Developer Details

Radius Developers

  • Developer:
    Radius Developers
  • Phone:
    +91 22 2653 5700
  • Website:
    www.radiusdevelopers.com
  • Address:
  • ONE BKC, Wing A, 14th Floor, BKC-Bandra (East), Mumbai 400 051, Maharashtra, India
Project Ratings
Project Brochures
Brochures of Avenue 54 by Radius Developers
Project Brochures
  • 15802 radius avenue 54 74.pdf
  • 15802 Avenue 54 Brochure (1).pdf
Project Amenities
Amenities offred in Avenue 54
LIFESTYLE AMENITIES
Power BackupOutdoor GamesClub HouseSwimming PoolHigh speed elevatorsGymnasiumJogging TrackVideo Door PhonesAir ConditionersAluminium Sliding WindowsPOP finished wallsImported Sanitary FittingsConcealed PlumbingConcealed WiringMarble flooringVitrified flooringPiped GasKitchen CabinetsModular KitchenGranite PlatformReception DeskMulti Purpose Hall
Project RERA Details
RERA Project Status On-Going Project
Proposed Possession 31 Dec 2022
Revised Possession 30 Jun 2024
Extended Possession
Litigations Yes
Project RERA Details
MAHA REARA No: P51800007149
RERA Project Name Avenue 54
RERA Location Swami Vivekanand Road, Santacruz West, Andheri, Andheri, Mumbai Suburban, 400054
RERA Developer Sumer Radius Realty Pvt Ltd
Architect Girish Chaudhari
Project RERA Details
Project Type Others
Funding Bank Yes Bank ltd
Last Modified 19 Oct 2020
Last Retrived 22 Oct 2020
Facilities & Amenities
Facilities, Amenities & Common areas details of Avenue 54 last updated on 15/06/2020 as per information obtained from MARA RERA. Disclaimer
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Common For Phase 1 &Amp; 2
AMPHI THEATRE TIERED SEATING
Common For Phase 1 &Amp; 2
CLIMBING WALL
Common For Phase 1 &Amp; 2
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
No Receiving Station
Energy management
Na
Fire Protection And Fire Safety Requirements
Common For Phase 1 &Amp; 2
FOUNTAIN PLAY
Common For Phase 1 &Amp; 2
Landscaping & Tree Planting
Common For Phase 1 &Amp; 2
MULTIPURPOSE LAWN
Common For Phase 1 &Amp; 2
MULTIPURPOSE PATH
Common For Phase 1 &Amp; 2
Open Parking
Na
OUTDOOR KIDS PLAY AREA WITH PLAY EQUIPMENTS
Common For Phase 1 &Amp; 2
REFLEXOLOGY PATH
Common For Phase 1 &Amp; 2
SCULPTURE
Common For Phase 1 &Amp; 2
SENIOR CITIZEN AREA
Common For Phase 1 &Amp; 2
Sewerage (Chamber, Lines, Septic Tank , STP)
Common For Phase 1 &Amp; 2
Solid Waste Management And Disposal
Common For Phase 1 &Amp; 2
Storm Water Drains
Common For Phase 1 &Amp; 2
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Common For Phase 1 &Amp; 2
Water Conservation, Rain water Harvesting
Rwh Tanks
Water Supply
Common For Phase 1 &Amp; 2
Buildings / Wings in Avenue 54
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Avenue 54 by Radius Developerslast updated on 15/06/2020 as per information obtained from MARA RERA. Disclaimer

208168 Sq. ft.

Project Area

21265 Sq. ft.

Recreational Open Space

Total 6

Wings / Towers in Project

Apartments Statistics

303 apartments in total
Total
303
Booked
139
Available
164

Saleable Area Statistics (Sq. ft.)

652201 Total
Total
652201
Booked
289285
Available
362916
Total 303 apartments in project. 139 apartments booked. 45% apartments booked.
Total 60590.92 saleable area. 26875.23 apartments booked.
44% area booked.

Tower 1A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Tower 1ADec 2023130000063
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
6 BHK344.87 Sq.mts. ( 3712 Sq.ft. )12
None Booked0% Booked
0% Booked
12 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Tower 1ACompletion
Excavation
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Tower 1B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Tower 1BDec 20232314000263
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
4 BHK A194.14 Sq.mts. ( 2090 Sq.ft. )1
None Booked0% Booked
0% Booked
4 BHK B194.02 Sq.mts. ( 2088 Sq.ft. )1
None Booked0% Booked
0% Booked
4 BHK C194.08 Sq.mts. ( 2089 Sq.ft. )34
4 BHK D193.83 Sq.mts. ( 2086 Sq.ft. )33
69 total apartments / 3 apartments booked. 4% apartments booked.
Work Description in Building Tower 1BCompletion
Excavation
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Tower 1C

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Tower 1CDec 20232314000197
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
4 BHK M196.8 Sq.mts. ( 2118 Sq.ft. )1
None Booked0% Booked
0% Booked
4.5 BHK225.95 Sq.mts. ( 2432 Sq.ft. )1
None Booked0% Booked
0% Booked
5.5 BHK A265.21 Sq.mts. ( 2855 Sq.ft. )18
11 Booked61% Booked
61% Booked
20 total apartments / 11 apartments booked. 55% apartments booked.
Work Description in Building Tower 1CCompletion
Excavation
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Tower 2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Tower 2Dec 20232214100372
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
3 BHK A131.57 Sq.mts. ( 1416 Sq.ft. )29
21 Booked72% Booked
72% Booked
3 BHK B131.57 Sq.mts. ( 1416 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK C131.57 Sq.mts. ( 1416 Sq.ft. )1
1 Booked100% Booked
100% Booked
4 BHK E203.93 Sq.mts. ( 2195 Sq.ft. )2
None Booked0% Booked
0% Booked
4 BHK F207.58 Sq.mts. ( 2234 Sq.ft. )1
None Booked0% Booked
0% Booked
4 BHK G195.21 Sq.mts. ( 2101 Sq.ft. )29
16 Booked55% Booked
55% Booked
4 BHK H195.21 Sq.mts. ( 2101 Sq.ft. )1
1 Booked100% Booked
100% Booked
4 BHK I195.21 Sq.mts. ( 2101 Sq.ft. )1
1 Booked100% Booked
100% Booked
5 BHK227.52 Sq.mts. ( 2449 Sq.ft. )36
26 Booked72% Booked
72% Booked
101 total apartments / 67 apartments booked. 66% apartments booked.
Work Description in Building Tower 2Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress38% done
38% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress47% done
47% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress32% done
32% Booked

Tower 3

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Tower 3Dec 20232214100372
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
3 BHK A131.57 Sq.mts. ( 1416 Sq.ft. )29
19 Booked65% Booked
65% Booked
3 BHK B131.57 Sq.mts. ( 1416 Sq.ft. )1
None Booked0% Booked
0% Booked
3 BHK C131.57 Sq.mts. ( 1416 Sq.ft. )1
None Booked0% Booked
0% Booked
4 BHK E203.93 Sq.mts. ( 2195 Sq.ft. )2
None Booked0% Booked
0% Booked
4 BHK F207.58 Sq.mts. ( 2234 Sq.ft. )1
None Booked0% Booked
0% Booked
4 BHK G195.21 Sq.mts. ( 2101 Sq.ft. )29
13 Booked44% Booked
44% Booked
4 BHK H195.21 Sq.mts. ( 2101 Sq.ft. )1
None Booked0% Booked
0% Booked
4 BHK I195.21 Sq.mts. ( 2101 Sq.ft. )1
1 Booked100% Booked
100% Booked
5 BHK227.52 Sq.mts. ( 2449 Sq.ft. )36
25 Booked69% Booked
69% Booked
101 total apartments / 58 apartments booked. 57% apartments booked.
Work Description in Building Tower 3Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
work-in-progress75% done
75% Booked
X number of Podiums
X number of Slabs of Super Structure

Tower 4

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Tower 4Dec 20232214000200
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Work Description in Building Tower 4Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Project Consultants
Channel Partners Registered by Developer
Radius Developers
for Project
Avenue 54
last updated on 15/06/2020 as per information obtained from MARA RERA. Disclaimer
Name Company Location Mobile Designation

About Radius Developers

Radius Developers Spearheaded by Sanjay Chhabria as its Managing Director, Radius is a modern take on Mumbai’s real estate. Team Radius is a blend of professional flair and entrepreneurial passion. Sanjay is a renowned and respected member of Mumbai’s real estate fraternity and Radius is his independent foray into real estate.Radius is an amalgamation of integrity, transparency and an ability to deliver challenging projects on time. Radius is an outcome of the succession plan at the Wadhwa Group where Sanjay led the business as a Managing Director for over a decade. With founding principles imbibed from the Wadhwa Group we endeavour to hoist this value-legacy even higher with exquisite designs, latest technology and earnest ambition. Above all, everything that we do will be built around all our stakeholders.Each development by Radius is an affirmation of its dedication. We bring to life unique concepts in urban real estate which remain faithful to the philosophy of ‘Built around you’.