Arkade Pearl Project at Vile Parle East by Arkade Developers (P51800054195)
  • Rating:
  • ()

Arkade Pearl - Vile Parle East

Project Details, Configuration & Prices
2 BHK721 Sq.ft. Carpet ₹ 3.47 Cr All In
2 BHK725 Sq.ft. Carpet ₹ 3.49 Cr All In
2 BHK815 Sq.ft. Carpet ₹ 3.92 Cr All In
2 BHK839 Sq.ft. Carpet ₹ 4.16 Cr All In
3 BHK1126 Sq.ft. Carpet ₹ 5.48 Cr All In
3 BHK1200 Sq.ft. Carpet ₹ 5.82 Cr All In
Project overview
Arkade Pearl Project at Vile Parle East by Arkade Developers (P51800054195) is a RERA approved Under Construction Project with RERA ID P51800054195 slated to be ready for possession by Dec 2026 with 2/3 BHK apartments / Flats starting from N/A onwards

Experience refined living with Arkade Group’s latest residential project in Vile Parle East, thoughtfully designed to offer the perfect blend of luxury, comfort, and community living. Spread across a 1-acre land parcel, this exclusive development features Ground + 8 floor residences across 6 wings, ensuring an intimate yet vibrant lifestyle. The project offers spacious flats with premium deck apartments, allowing residents to enjoy openness and natural light. With a host of world-class amenities including a gymnasium, banquet hall, kids’ play area, hobby zone, and open lawn spaces, Arkade’s Vile Parle East project is crafted to elevate everyday living. As a 100% residential project, it ensures peace, privacy, and a strong sense of belonging, making it the perfect address for families aspiring for modern urban living in one of Mumbai’s most prestigious locations.
Arkade Pearl QR Code
Arkade Pearl
MahaRERA - P51800054195

Zee Corporate Park

₹ 1.15 Crs. onwards
Vile Parle East
Office BHK apartments
View Details

Atharv Casa

₹ 2.82 Crs. onwards
Vile Parle East
2/2½/3 BHK apartments
View Details

Vireshwar Mahal

₹ 2.35 Crs. onwards
Vile Parle East
1/2 BHK apartments
View Details

Vidyalankar

₹ 4.37 Crs. onwards
Vile Parle East
3 BHK apartments
View Details

Dhanlaxmi CHS

₹ 3.1 Crs. onwards
Vile Parle East
2/3 BHK apartments
View Details

Zodiac Anjaneshwar

₹ 2.85 Crs. onwards
Vile Parle East
2 BHK apartments
View Details
Vile Parle East
1/2 BHK apartments
View Details

Sheela Smruti

₹ 2.39 Crs. onwards
Vile Parle East
2/3/4/6 BHK apartments
View Details
Project Details
Project details were last updated in Dec 2025
  • Project:
    Arkade Pearl
  • Location:
  • Vile Parle East, Navpada
  • Const. Stage:
    Under Construction
  • Possession:
    Dec 2026
  • Parking:
    Podium;
  • Floors:
    8
Developer Details

  • Developer:
    Arkade Developers
  • Phone:
    022 28874742
  • Website:
    www.arkade.in
  • Address:
  • Bhoomi Arcade, A - 103,Opp. Children Academy School, Atmaram Sawant Road, Ashok Nagar, Kandivali (East), Mumbai 400 101.
Project Ratings
Project Amenities
Amenities offred in Arkade Pearl
Project RERA Details
RERA Project Status New
Proposed Possession 31 Dec 2026
Revised Possession 01 Jan 1900
Extended Possession
Litigations No Litigations
Project RERA Details
MAHA RERA No: P51800054195
RERA Project Name Arkade Pearl 1
RERA Location 418/D
RERA Developer Arkade Developers Limited
Architect A R Design Studio
Project RERA Details
Project Type Residential / Group Housing
Funding Bank ICICI BANK LIMITED
Last Modified 03 Jan 2024
Last Retrived 26 Jul 2025

Most active Channel Partners, Real Estate Agents in Vile Parle East

Facilities & Amenities
Facilities, Amenities & Common areas details of Arkade Pearllast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Car Parking System
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Na
Energy management
Na
Fire Protection And Fire Safety Requirements
Na
Fitness Centre Society Office
Na
Landscaping & Tree Planting
Na
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)25% completed
25% Complete
Na
Solid Waste Management And Disposal70% completed
70% Complete
Na
Storm Water Drains25% completed
25% Complete
Na
Street Lighting
Na
Swimming Pool
Na
Treatment And Disposal Of Sewage And Sullage Water
Only Disposal
Water Conservation, Rain water Harvesting
Na
Water Supply
Na
Buildings / Wings in Arkade Pearl
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Arkade Pearlby Arkade Developerslast updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer

44703 Sq. ft.

Project Area

10906 Sq. ft.

Recreational Open Space

Total 3

Wings / Towers in Project

Apartments Statistics

88 apartments in total
Total
88
Booked
51
Available
37

Saleable Area Statistics (Sq. ft.)

71406 Total
Total
71406
Booked
40557
Available
30849
Total 88 apartments in project. 51 apartments booked. 57% apartments booked.
Total 6633.77 saleable area. 3767.83 apartments booked.
57% area booked.

B Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
B WingDec 20268100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK64.9 Sq.mts. ( 699 Sq.ft. )8
8 Booked100% Booked
100% Booked
2 BHK64.96 Sq.mts. ( 699 Sq.ft. )2
2 Booked100% Booked
100% Booked
2 BHK64.97 Sq.mts. ( 699 Sq.ft. )8
8 Booked100% Booked
100% Booked
2 BHK65.72 Sq.mts. ( 707 Sq.ft. )4
4 Booked100% Booked
100% Booked
2 BHK71.57 Sq.mts. ( 770 Sq.ft. )2
2 Booked100% Booked
100% Booked
24 total apartments / 24 apartments booked. 100% apartments booked.
Work Description in Building B WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress35% done
35% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress44% done
44% Booked

C Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
C WingDec 20268100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK64.14 Sq.mts. ( 690 Sq.ft. )8
None Booked0% Booked
0% Booked
2 BHK71.66 Sq.mts. ( 771 Sq.ft. )8
None Booked0% Booked
0% Booked
3 BHK78.95 Sq.mts. ( 850 Sq.ft. )6
6 Booked100% Booked
100% Booked
3 BHK78.98 Sq.mts. ( 850 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK83.58 Sq.mts. ( 900 Sq.ft. )2
2 Booked100% Booked
100% Booked
3 BHK90.13 Sq.mts. ( 970 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK90.33 Sq.mts. ( 972 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK99.41 Sq.mts. ( 1070 Sq.ft. )3
3 Booked100% Booked
100% Booked
3 BHK102.19 Sq.mts. ( 1100 Sq.ft. )2
2 Booked100% Booked
100% Booked
32 total apartments / 16 apartments booked. 50% apartments booked.
Work Description in Building C WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress21% done
21% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress56% done
56% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure

D Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
D WingDec 20268100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK66.71 Sq.mts. ( 718 Sq.ft. )2
2 Booked100% Booked
100% Booked
2 BHK68.3 Sq.mts. ( 735 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK69.7 Sq.mts. ( 750 Sq.ft. )7
2 Booked28% Booked
28% Booked
2 BHK71.65 Sq.mts. ( 771 Sq.ft. )8
None Booked0% Booked
0% Booked
2 BHK74.35 Sq.mts. ( 800 Sq.ft. )5
5 Booked100% Booked
100% Booked
2 BHK77.15 Sq.mts. ( 830 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK107.23 Sq.mts. ( 1154 Sq.ft. )8
None Booked0% Booked
0% Booked
32 total apartments / 11 apartments booked. 34% apartments booked.
Work Description in Building D WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress21% done
21% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress56% done
56% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Project Consultants
Channel Partners Registered by Developer
Arkade Developers
for Project
Arkade Pearl 1
last updated on 26 Jul 2025 as per information obtained from MARA RERA. Disclaimer
Name Company Location Mobile Designation

About Arkade Developers

Arkade Group has metamorphosed into a leading real estate developer in Mumbai. Spearheaded by Amit Jain, the group has scaled the heights of Mumbai realty through sheer determination and dedication. As an entity that believes in moving ahead with the times, we ensure a constant upkeep of technological advances in the industry. With a flexible approach, we're better equipped to meet changing demands of the realty sector.