Project overview

Sun City Phase I is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700025155. Sun City Phase I is located at Thane. This is a New Project being developed by Sunrise Developers.

Sun City Phase I has 1 BHK, 1.5 BHK & 2 BHK Apartments with carpet areas ranging from 404 to 537 Sq.ft. Carpet. The Project has total 275 of which 275 are currently available for sale.

Sun City Phase I is being developed on a total land area of 200910 Sq.ft. out of which 15285 Sq.ft. i.e 8% is reserved for recreational purposes. Sun City Phase I has 4 Wings / Towers Sun Divine D Wing,Sun Orbit C Wing,Sun Prime A Wing,Sun Shine B Wing

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Sun City Phase I
  • Location:
  • Thane
  • Const. Stage:
    New Project
  • Possession:
    15 Mar 2026
Developer Details

  • Developer:
    Sunrise Developers
  • Phone:
  • Address:
  • Survey No 160, Sun City, Behind Old Shiv Mandir, Ambernath East, Ambernath Gaon, 421501
Project RERA Details
MAHA REARA No: P51700025155
Project Type Residential
RERA Project Status New Project
Funding Bank ANDHRA BANK
Proposed Possession 15 Mar 2026
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 12 Mar 2020
Last Retrived 28 Jul 2025
Sun City Phase I QR Code
Sun City Phase I
MahaRERA - P51700025155
Apartment Details & Configuration
TypeArea
1 BHK34.26 Sq.mts. ( 369 Sq.ft. )
1 BHK34.27 Sq.mts. ( 369 Sq.ft. )
1 BHK37.95 Sq.mts. ( 408 Sq.ft. )
1 BHK37.97 Sq.mts. ( 409 Sq.ft. )
2 BHK44.86 Sq.mts. ( 483 Sq.ft. )
2 BHK45.85 Sq.mts. ( 494 Sq.ft. )
2 BHK48.48 Sq.mts. ( 522 Sq.ft. )
2 BHK49.78 Sq.mts. ( 536 Sq.ft. )
1.5 BHK39.14 Sq.mts. ( 421 Sq.ft. )
1.5 BHK42.72 Sq.mts. ( 460 Sq.ft. )
2 BHK48.49 Sq.mts. ( 522 Sq.ft. )
2 BHK49.89 Sq.mts. ( 537 Sq.ft. )
3 BHK68.39 Sq.mts. ( 736 Sq.ft. )
3 BHK72.91 Sq.mts. ( 785 Sq.ft. )
1 BHK31.88 Sq.mts. ( 343 Sq.ft. )
1 BHK32.29 Sq.mts. ( 348 Sq.ft. )
1 BHK32.82 Sq.mts. ( 353 Sq.ft. )
1 BHK34.2 Sq.mts. ( 368 Sq.ft. )
1 BHK34.83 Sq.mts. ( 375 Sq.ft. )
1 BHK36.5 Sq.mts. ( 393 Sq.ft. )
1 BHK36.51 Sq.mts. ( 393 Sq.ft. )
1 BHK37.52 Sq.mts. ( 404 Sq.ft. )
1 BHK39.47 Sq.mts. ( 425 Sq.ft. )
2 BHK48.46 Sq.mts. ( 522 Sq.ft. )
2 BHK49.88 Sq.mts. ( 537 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Sun City Phase Ilast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Before Completion
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
After Completion
Energy management
Na
Fire Protection And Fire Safety Requirements
Before Completion
Landscaping & Tree Planting
Before Completion
Open Parking
Before Completion
Sewerage (Chamber, Lines, Septic Tank , STP)
Before Completion
Solid Waste Management And Disposal
Na
Storm Water Drains
Before Completion
Street Lighting
Before Completion
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Before Completion
Water Supply
After Completion
Buildings / Wings in Sun City Phase I
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Sun City Phase I by Sunrise Developerslast updated on 28 Jul 2025 as per information obtained from MARA RERA.

200910 Sq. ft.

Project Area

15285 Sq. ft.

Recreational Open Space

Total 4

Wings / Towers in Project

Apartments Statistics

275 apartments in total
Total
275
Booked
0
Available
275

Saleable Area Statistics (Sq. ft.)

129927 Total
Total
129927
Booked
0
Available
129927
Total 275 apartments in project. 0 apartments booked. 0% apartments booked.
Total 129927 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.

Sun Divine D Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Sun Divine D WingMar 20251210102727
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK34.26 Sq.mts. ( 369 Sq.ft. )6
None Booked0% Booked
0% Booked
1 BHK34.27 Sq.mts. ( 369 Sq.ft. )6
None Booked0% Booked
0% Booked
1 BHK37.95 Sq.mts. ( 408 Sq.ft. )5
None Booked0% Booked
0% Booked
1 BHK37.97 Sq.mts. ( 409 Sq.ft. )4
None Booked0% Booked
0% Booked
2 BHK44.86 Sq.mts. ( 483 Sq.ft. )12
None Booked0% Booked
0% Booked
2 BHK45.85 Sq.mts. ( 494 Sq.ft. )10
None Booked0% Booked
0% Booked
2 BHK48.48 Sq.mts. ( 522 Sq.ft. )10
None Booked0% Booked
0% Booked
2 BHK49.78 Sq.mts. ( 536 Sq.ft. )12
None Booked0% Booked
0% Booked
65 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Sun Divine D WingCompletion
Excavation
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Sun Orbit C Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Sun Orbit C WingSep 20241310103031
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1.5 BHK39.14 Sq.mts. ( 421 Sq.ft. )12
None Booked0% Booked
0% Booked
1.5 BHK42.72 Sq.mts. ( 460 Sq.ft. )11
None Booked0% Booked
0% Booked
2 BHK48.49 Sq.mts. ( 522 Sq.ft. )18
None Booked0% Booked
0% Booked
2 BHK49.89 Sq.mts. ( 537 Sq.ft. )18
None Booked0% Booked
0% Booked
3 BHK68.39 Sq.mts. ( 736 Sq.ft. )6
None Booked0% Booked
0% Booked
3 BHK72.91 Sq.mts. ( 785 Sq.ft. )6
None Booked0% Booked
0% Booked
71 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Sun Orbit C WingCompletion
Excavation
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Sun Prime A Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Sun Prime A WingSep 2023810101424
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK31.88 Sq.mts. ( 343 Sq.ft. )6
None Booked0% Booked
0% Booked
1 BHK32.29 Sq.mts. ( 348 Sq.ft. )8
None Booked0% Booked
0% Booked
1 BHK32.82 Sq.mts. ( 353 Sq.ft. )6
None Booked0% Booked
0% Booked
1 BHK34.2 Sq.mts. ( 368 Sq.ft. )8
None Booked0% Booked
0% Booked
1 BHK34.83 Sq.mts. ( 375 Sq.ft. )16
None Booked0% Booked
0% Booked
1 BHK36.5 Sq.mts. ( 393 Sq.ft. )3
None Booked0% Booked
0% Booked
1 BHK36.51 Sq.mts. ( 393 Sq.ft. )9
None Booked0% Booked
0% Booked
56 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Sun Prime A WingCompletion
Excavation
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Sun Shine B Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Sun Shine B WingMar 20251310103535
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK37.52 Sq.mts. ( 404 Sq.ft. )6
None Booked0% Booked
0% Booked
1 BHK39.47 Sq.mts. ( 425 Sq.ft. )5
None Booked0% Booked
0% Booked
1.5 BHK42.72 Sq.mts. ( 460 Sq.ft. )12
None Booked0% Booked
0% Booked
1.5 BHK39.14 Sq.mts. ( 421 Sq.ft. )12
None Booked0% Booked
0% Booked
2 BHK48.46 Sq.mts. ( 522 Sq.ft. )24
None Booked0% Booked
0% Booked
2 BHK49.88 Sq.mts. ( 537 Sq.ft. )24
None Booked0% Booked
0% Booked
83 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Sun Shine B WingCompletion
Excavation
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Sunrise Developers
for Project
Sun City Phase I
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation