Project overview
Shree Parshwanath Sra Chs Ltd is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800009968. Shree Parshwanath Sra Chs Ltd is located at 400078. This is a New Project being developed by Chintamani Realtors.
Shree Parshwanath Sra Chs Ltd has 1 BHK, 2 BHK & Shop Apartments with carpet areas ranging from 212 to 658 Sq.ft. Carpet. The Project has total 86 of which 14 are currently available for sale.
Shree Parshwanath Sra Chs Ltd is being developed on a total land area of 22884 Sq.ft. out of which 1659 Sq.ft. i.e 7% is reserved for recreational purposes. Shree Parshwanath Sra Chs Ltd has 3 Wings / Towers Rehab Wing B,Rehab Wing C,Sale Wing A
| Project | Developer | Location | Possession |
-
Developer:
Chintamani Realtors
-
Phone:
-
Address:
-
101, Shree Harihar Residency, Lake Road, Shiva Industrial Estate, Bhandup(West), 400078
| MAHA REARA No: |
P51800009968 |
| Project Type |
Residential |
| RERA Project Status |
New Project |
| Funding Bank |
DNS BANK |
| Proposed Possession |
30 Dec 2021 |
| Revised Possession |
|
| Extended Possession |
|
| Litigations |
No Litigations |
| Last Modified |
22 Mar 2023 |
| Last Retrived |
28 Jul 2025 |
Shree Parshwanath Sra Chs Ltd QR Code
Shree Parshwanath Sra Chs Ltd
MahaRERA - P51800009968
| Type | Area |
| 1 BHK | 33.46 Sq.mts. ( 360 Sq.ft. ) |
| Shop | 4.65 Sq.mts. ( 50 Sq.ft. ) |
| Shop | 5.95 Sq.mts. ( 64 Sq.ft. ) |
| Shop | 9.29 Sq.mts. ( 100 Sq.ft. ) |
| 1 BHK | 31.6 Sq.mts. ( 340 Sq.ft. ) |
| 1 BHK | 39.22 Sq.mts. ( 422 Sq.ft. ) |
| 1 BHK | 39.41 Sq.mts. ( 424 Sq.ft. ) |
| 2 BHK | 58.36 Sq.mts. ( 628 Sq.ft. ) |
| 2 BHK | 61.15 Sq.mts. ( 658 Sq.ft. ) |
| Shop | 19.7 Sq.mts. ( 212 Sq.ft. ) |
Facilities & Amenities
Facilities, Amenities & Common areas details of Shree Parshwanath Sra Chs Ltdlast updated on 28 Jul 2025 as per information obtained from MARA RERA.
| Project Facilities & Amenities |
Available |
Details |
Aggregate area of recreational Open Space
|
|
Will Be Completed Before Occ |
|
|
|
Na |
Electrical Meter Room, Sub-Station, Receiving Station100% completed
|
|
Completed |
|
|
|
Na |
Fire Protection And Fire Safety
Requirements98% completed
|
|
Within A Short Period It Will Be Completed |
Landscaping & Tree Planting90% completed
|
|
Will Be Completed Before Occ |
|
|
|
Na |
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
|
|
Completed |
Solid Waste Management And Disposal
|
|
Na |
Storm Water Drains100% completed
|
|
Completed |
|
|
|
Na |
Treatment And Disposal Of Sewage And Sullage Water
|
|
Na |
Water Conservation, Rain water Harvesting
|
|
Completed |
Water Supply100% completed
|
|
Completed |
Buildings / Wings in Shree Parshwanath Sra Chs Ltd
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Shree Parshwanath Sra Chs Ltd by Chintamani Realtorslast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Apartments Statistics
86
apartments in total
Saleable Area Statistics (Sq. ft.)
42270
Total
Total 86 apartments in project. 72 apartments booked. 83% apartments booked.
Total 42270 Sq.ft. saleable area. 33847 saleable area booked.
80% area booked.
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| Rehab Wing B | Dec 2020 | 18 | 1 | 0 | 1 | 0 | 0 | 0 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 1 BHK | 33.46 Sq.mts. ( 360 Sq.ft. ) | 11 | |
11 total apartments / 11 apartments booked. 100% apartments booked. |
| Work Description in Building Rehab Wing B | Completion |
| Excavation | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| Rehab Wing C | May 2019 | 7 | 1 | 0 | 1 | 0 | 0 | 0 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| Shop | 4.65 Sq.mts. ( 50 Sq.ft. ) | 1 | |
| Shop | 5.95 Sq.mts. ( 64 Sq.ft. ) | 1 | |
| Shop | 9.29 Sq.mts. ( 100 Sq.ft. ) | 1 | |
3 total apartments / 3 apartments booked. 100% apartments booked. |
| Work Description in Building Rehab Wing C | Completion |
| Excavation | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| Sale Wing A | Mar 2020 | 21 | 1 | 0 | 1 | 3 | 0 | 1 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 1 BHK | 31.6 Sq.mts. ( 340 Sq.ft. ) | 1 | |
| 1 BHK | 39.22 Sq.mts. ( 422 Sq.ft. ) | 18 | |
| 1 BHK | 39.41 Sq.mts. ( 424 Sq.ft. ) | 16 | |
| 2 BHK | 58.36 Sq.mts. ( 628 Sq.ft. ) | 18 | |
| 2 BHK | 61.15 Sq.mts. ( 658 Sq.ft. ) | 18 | |
| Shop | 19.7 Sq.mts. ( 212 Sq.ft. ) | 1 | |
72 total apartments / 58 apartments booked. 80% apartments booked. |
| Work Description in Building Sale Wing A | Completion |
| Excavation | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
Channel Partners Registered by Developer
Chintamani Realtors
for Project
Shree Parshwanath Sra Chs Ltd
last updated on
28 Jul 2025 as per information obtained from MARA RERA.
| Name |
Company |
Location |
Mobile |
Designation |