Project overview

Shivsai Hights is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700010671. Shivsai Hights is located at 46H No.1/2. This is a Ongoing being developed by Shivsai Enterprises.

Shivsai Hights has RESIDENTIAL Apartments with carpet areas ranging from 25910 to 25910 Sq.ft. Carpet. The Project has total 76 of which 58 are currently available for sale.

Shivsai Hights is being developed on a total land area of 21528 Sq.ft. Shivsai Hights has 2 Wings / Towers Shisai Heights,Shivsai Hights

ProjectDeveloperLocationPossession
Rai ParadiseRai Residency Private LimitedSurvey No 3 Hissa No 1 2 3 2 531-12-2018 00:00:00
Bhanumati Plot - BSai Shakti Developers421306, Thane31-12-2018 00:00:00
Jamunabai TowerNageshwar Construction4330-12-2025 00:00:00
Dasarath PlazaPrabhat Builders & Developers37/5, 35/1-A30-03-2021 00:00:00
Ritesh EmpireSapphire DevelopersS No 39 H No 130-12-2023 00:00:00
Vasant VastuSai Sadguru Builders &Amp; Developers421306, Thane30-06-2021 00:00:00
Rai S Heritage D WingRai Residency Private LimitedSurvey No 5 Hissa No2, Survey No 6 Hissa No 231-12-2018 00:00:00
Avighna Karan Wing AAvighna Karan119/2/131-03-2019 00:00:00
Chandra BhagaVitthal Mauli Construction Company36/10 1 2 324-06-2021 00:00:00
Tisai HeightsTisai ConstructionS No-123 H No-231-12-2023 00:00:00
Avighna Karan Wing CAvighna Karan119/21,2/231-12-2024 00:00:00
Sai Heights Building No.1 B WingSai Siddhi DevelopersSr No.37, Hiss No.231-12-2025 00:00:00
Imperial HeightsGp InfraSurvey No- 29, Hissa No- 17E, Cts No- 765531-12-2026 00:00:00
Dattu EnclaveYash Enterprises54/2/1, 54/2/231-12-2028 00:00:00
Raj Empires Building No.2Raj Pritam ChaturvediSurvey No 209 Hissa No.3/131-03-2027 00:00:00
Saket IrisAnil Shilpayatan Private Limited127/4/1, Plot A19-04-2019 00:00:00
Tai-Nana SadanShree Samarth DevelopersSurvey No-57A,Hissa No-10A/131-12-2018 00:00:00
NakshatraAbhishek Consttruction Co3012 And 3013/ 73 Part 139 H No 631-01-2021 00:00:00
Shreeram ComplexG K DevelopersSurvey No 28, Hissa No 2 And 330-06-2018 00:00:00
Sai Anandi HeightsSaish ConstructionKalyan30-03-2022 00:00:00
Vitthu Paradise Building No. 3Aradhna Construction121,5/7,5/8,5/928-08-2021 00:00:00
Lakeview Co Operative Housing LimitedGp InfraSurvey No. 42, Hissa No. 2/A12-01-2026 00:00:00
Sai Vikrant HeightsVikrant ConstructionS No.51/A/12/21 And S No.51/A/12/1831-12-2026 00:00:00
Krishna EmpireTirumala DevelopersS No 70 H No 231-12-2025 00:00:00
Shivsai HightsShivsai Enterprises46H No.1/230-06-2021 00:00:00
Rai Valley A B C WingRai Residency Private LimitedSurvey No 22 Hissa No 431-12-2017 00:00:00
Trimurti ParkTrimurti ConstructionS No 19 Hissa No 730-12-2022 00:00:00
Dinkar PlazaDream Home InfraThane, 42130631-12-2021 00:00:00
Mangeshi SanskarMangesh Dashrath Gaikar4030-06-2018 00:00:00
Shubham Paradise Abcdef WingGaurivinayak Builders And Developers Pvt Ltd421306, Thane31-03-2020 00:00:00
Project Details
  • Project:
    Shivsai Hights
  • Location:
  • 46H No.1/2
  • Const. Stage:
    Ongoing
  • Possession:
    30 Jun 2021
Developer Details

  • Developer:
    Shivsai Enterprises
  • Phone:
  • Address:
  • Girish Apartment
Project RERA Details
MAHA REARA No: P51700010671
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Aniruddha S Dastane
Funding Bank YES BANK
Proposed Possession 30 Jun 2021
Revised Possession 30 Jun 2021
Extended Possession 29 Dec 2022
Litigations No Litigations
Last Modified 09 Sep 2021
Last Retrived 26 Jul 2025
Shivsai Hights QR Code
Shivsai Hights
MahaRERA - P51700010671
Apartment Details & Configuration
TypeArea
RESIDENTIAL1009.19 Sq.mts. ( 10863 Sq.ft. )
RESIDENTIAL2407.07 Sq.mts. ( 25910 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Shivsai Hightslast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station40% completed
40% Complete
40
Energy management
Na
Fire Protection And Fire Safety Requirements
00
Landscaping & Tree Planting
Na
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
00
Solid Waste Management And Disposal
Na
Storm Water Drains
Na
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Na
Water Supply
00
Buildings / Wings in Shivsai Hights
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Shivsai Hights by Shivsai Enterpriseslast updated on 26 Jul 2025 as per information obtained from MARA RERA.

21528 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

76 apartments in total
Total
76
Booked
18
Available
58

Saleable Area Statistics (Sq. ft.)

1623061 Total
Total
1623061
Booked
466375
Available
1156687
Total 76 apartments in project. 18 apartments booked. 23% apartments booked.
Total 1623061 Sq.ft. saleable area. 466375 saleable area booked.
29% area booked.

Shisai Heights

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Shisai HeightsJan 19008101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL1009.19 Sq.mts. ( 10863 Sq.ft. )23
None Booked0% Booked
0% Booked
23 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Shisai HeightsCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress50% done
50% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress50% done
50% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress40% done
40% Booked
Sanitary Fittings within the flats / premises
work-in-progress40% done
40% Booked
Slabs of Super Structure
work-in-progress68% done
68% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress50% done
50% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress50% done
50% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress68% done
68% Booked

Shivsai Hights

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Shivsai HightsJan 19008102002
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL2407.07 Sq.mts. ( 25910 Sq.ft. )53
18 Booked33% Booked
33% Booked
53 total apartments / 18 apartments booked. 33% apartments booked.
Work Description in Building Shivsai HightsCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Shivsai Enterprises
for Project
Shivsai Hights
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation