Project overview

Shivarchan is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000013953. Shivarchan is located at 375B 375D Malonde. This is a New being developed by Ojas Constructions.

Shivarchan has 1 BHK & 2 BHK Apartments with carpet areas ranging from 408 to 588 Sq.ft. Carpet. The Project has total 25 of which 25 are currently available for sale.

Shivarchan is being developed on a total land area of 15259 Sq.ft. out of which 1463 Sq.ft. i.e 10% is reserved for recreational purposes. Shivarchan has 1 Wings / Towers Shivarchan

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Shivarchan
  • Location:
  • 375B 375D Malonde
  • Const. Stage:
    New
  • Possession:
    30 Nov 2019
Developer Details

  • Developer:
    Ojas Constructions
  • Phone:
  • Address:
  • Shree Pant Nagari B Wing Chs
Project RERA Details
MAHA REARA No: P99000013953
Project Type Residential / Group Housing
RERA Project Status New
Architect Encon
Funding Bank BASSEIN CATHOLIC COOPERATIVE BANK LIMITED
Proposed Possession 30 Nov 2019
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 09 Sep 2021
Last Retrived 28 Jul 2025
Shivarchan QR Code
Shivarchan
MahaRERA - P99000013953
Apartment Details & Configuration
TypeArea
1 BHK37.89 Sq.mts. ( 408 Sq.ft. )
2 BHK54.62 Sq.mts. ( 588 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Shivarchanlast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Garden
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Meter Room
Energy management
Solar Water Heater
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting10% completed
10% Complete
Transplantation Of Displaced Trees
Open Parking
4
Sewerage (Chamber, Lines, Septic Tank , STP)
Septic Tank
Solid Waste Management And Disposal
Septic Tank
Storm Water Drains
Na
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Rain Water Harvesting
Water Supply
Municipal And Borewell
Buildings / Wings in Shivarchan
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Shivarchan by Ojas Constructionslast updated on 28 Jul 2025 as per information obtained from MARA RERA.

15259 Sq. ft.

Project Area

1463 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

25 apartments in total
Total
25
Booked
0
Available
25

Saleable Area Statistics (Sq. ft.)

13258 Total
Total
13258
Booked
0
Available
13258
Total 25 apartments in project. 0 apartments booked. 0% apartments booked.
Total 13258 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.

Shivarchan

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
ShivarchanJan 19005101031
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK37.89 Sq.mts. ( 408 Sq.ft. )8
None Booked0% Booked
0% Booked
2 BHK54.62 Sq.mts. ( 588 Sq.ft. )17
None Booked0% Booked
0% Booked
25 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building ShivarchanCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Ojas Constructions
for Project
Shivarchan
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation