Project overview

Shelter Star is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700021997. Shelter Star is located at Opp Kdmc Ground. This is a New Project being developed by Mussadique Majeed.

Shelter Star has 2 BHK Apartments with carpet areas ranging from 591 to 610 Sq.ft. Carpet. The Project has total 25 of which 25 are currently available for sale.

Shelter Star is being developed on a total land area of 24297 Sq.ft. Shelter Star has 3 Wings / Towers Building B,Building C,Building D

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Shelter Star
  • Location:
  • Opp Kdmc Ground
  • Const. Stage:
    New Project
  • Possession:
    30 Dec 2021
Developer Details

  • Developer:
    Mussadique Majeed
  • Phone:
  • Address:
  • 42/08, Majid Bunglow, Abid Saheb Rohe Marg, Near Mehman Masjid, Govandi Mohalla, 421301
Project RERA Details
MAHA REARA No: P51700021997
Project Type Residential
RERA Project Status New Project
Funding Bank IDBI BANK
Proposed Possession 30 Dec 2021
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 09 Aug 2019
Last Retrived 28 Jul 2025
Shelter Star QR Code
Shelter Star
MahaRERA - P51700021997
Apartment Details & Configuration
TypeArea
1 BHK26.28 Sq.mts. ( 283 Sq.ft. )
1 BHK26.84 Sq.mts. ( 289 Sq.ft. )
1 BHK39.75 Sq.mts. ( 428 Sq.ft. )
1 BHK39.01 Sq.mts. ( 420 Sq.ft. )
1 BHK41.62 Sq.mts. ( 448 Sq.ft. )
1 BHK42.57 Sq.mts. ( 458 Sq.ft. )
1 BHK44.61 Sq.mts. ( 480 Sq.ft. )
2 BHK59.69 Sq.mts. ( 643 Sq.ft. )
2 BHK66.05 Sq.mts. ( 711 Sq.ft. )
2 BHK71.92 Sq.mts. ( 774 Sq.ft. )
4 BHK132.1 Sq.mts. ( 1422 Sq.ft. )
2 BHK54.92 Sq.mts. ( 591 Sq.ft. )
2 BHK56.64 Sq.mts. ( 610 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Shelter Starlast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Work In Progress
Energy management
Na
Fire Protection And Fire Safety Requirements
Work In Progress
Landscaping & Tree Planting
Na
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Work In Progress
Solid Waste Management And Disposal
Na
Storm Water Drains
Na
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Work In Progress
Water Supply
Work In Rpogress
Buildings / Wings in Shelter Star
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Shelter Star by Mussadique Majeedlast updated on 28 Jul 2025 as per information obtained from MARA RERA.

24297 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 3

Wings / Towers in Project

Apartments Statistics

25 apartments in total
Total
25
Booked
0
Available
25

Saleable Area Statistics (Sq. ft.)

14460 Total
Total
14460
Booked
0
Available
14460
Total 25 apartments in project. 0 apartments booked. 0% apartments booked.
Total 14460 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.

Building B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building BJun 20218001001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK26.28 Sq.mts. ( 283 Sq.ft. )2
None Booked0% Booked
0% Booked
1 BHK26.84 Sq.mts. ( 289 Sq.ft. )2
None Booked0% Booked
0% Booked
1 BHK39.75 Sq.mts. ( 428 Sq.ft. )2
None Booked0% Booked
0% Booked
6 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Building BCompletion
Excavation
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Building C

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building CJun 20218101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK39.01 Sq.mts. ( 420 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK41.62 Sq.mts. ( 448 Sq.ft. )2
None Booked0% Booked
0% Booked
1 BHK42.57 Sq.mts. ( 458 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK44.61 Sq.mts. ( 480 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK59.69 Sq.mts. ( 643 Sq.ft. )3
None Booked0% Booked
0% Booked
2 BHK66.05 Sq.mts. ( 711 Sq.ft. )3
None Booked0% Booked
0% Booked
2 BHK71.92 Sq.mts. ( 774 Sq.ft. )3
None Booked0% Booked
0% Booked
4 BHK132.1 Sq.mts. ( 1422 Sq.ft. )1
None Booked0% Booked
0% Booked
15 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Building CCompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress20% done
20% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress33% done
33% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Building D

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building DJun 20216101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK54.92 Sq.mts. ( 591 Sq.ft. )2
None Booked0% Booked
0% Booked
2 BHK56.64 Sq.mts. ( 610 Sq.ft. )2
None Booked0% Booked
0% Booked
4 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Building DCompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress35% done
35% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress60% done
60% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress60% done
60% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress60% done
60% Booked
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Mussadique Majeed
for Project
Shelter Star
last updated on 28 Jul 2025 as per information obtained from MARA RERA.