Project overview

Sai Landmark is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700012014. Sai Landmark is located at Thane, 421601. This is a On-Going Project being developed by Sri Developer.

Sai Landmark has RESIDENTIAL Apartments with carpet areas ranging from 142728 to 142728 Sq.ft. Carpet. The Project has total 122 of which 120 are currently available for sale.

Sai Landmark is being developed on a total land area of 189016 Sq.ft. out of which 18902 Sq.ft. i.e 10% is reserved for recreational purposes. Sai Landmark has 3 Wings / Towers Lily,Sai Plaza,Tulsi

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Sai Landmark
  • Location:
  • Thane, 421601
  • Const. Stage:
    On-Going Project
  • Possession:
    31 Dec 2022
Developer Details

  • Developer:
    Sri Developer
  • Phone:
  • Address:
  • 0,, Near Kambare Power House,, Shahapur-Murbad Road,, Near Kambare Power House,, Shahapur, 421601
Project RERA Details
MAHA REARA No: P51700012014
Project Type Residential
RERA Project Status On-Going Project
Funding Bank IDBI BANK LTD
Proposed Possession 31 Dec 2022
Revised Possession 30 Dec 2024
Extended Possession
Litigations No Litigations
Last Modified 31 Jul 2017
Last Retrived 28 Jul 2025
Sai Landmark QR Code
Sai Landmark
MahaRERA - P51700012014
Apartment Details & Configuration
TypeArea
RESIDENTIAL13259.76 Sq.mts. ( 142728 Sq.ft. )
RESIDENTIAL.COMMERCI13348.84 Sq.mts. ( 143687 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Sai Landmarklast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Na
Energy management
Na
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting50% completed
50% Complete
Work In Progress
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)20% completed
20% Complete
Work In Progress
Solid Waste Management And Disposal
Na
Storm Water Drains50% completed
50% Complete
Work In Progress
Street Lighting30% completed
30% Complete
Work In Progress
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Na
Water Supply
Na
Buildings / Wings in Sai Landmark
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Sai Landmark by Sri Developerlast updated on 28 Jul 2025 as per information obtained from MARA RERA.

189016 Sq. ft.

Project Area

18902 Sq. ft.

Recreational Open Space

Total 3

Wings / Towers in Project

Apartments Statistics

122 apartments in total
Total
122
Booked
2
Available
120

Saleable Area Statistics (Sq. ft.)

17456930 Total
Total
17456930
Booked
285456
Available
17171474
Total 122 apartments in project. 2 apartments booked. 1% apartments booked.
Total 17456930 Sq.ft. saleable area. 285456 saleable area booked.
2% area booked.

Lily

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
LilyJan 19005102022
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL13259.76 Sq.mts. ( 142728 Sq.ft. )38
38 total apartments / 2 apartments booked. 5% apartments booked.
Work Description in Building LilyCompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress20% done
20% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure

Sai Plaza

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Sai PlazaJan 19005102022
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL.COMMERCI13348.84 Sq.mts. ( 143687 Sq.ft. )46
None Booked0% Booked
0% Booked
46 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Sai PlazaCompletion
Excavation
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Tulsi

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
TulsiJan 19005102022
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL13259.76 Sq.mts. ( 142728 Sq.ft. )38
None Booked0% Booked
0% Booked
38 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building TulsiCompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress32% done
32% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress20% done
20% Booked
Channel Partners
Channel Partners Registered by Developer
Sri Developer
for Project
Sai Landmark
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation