Project overview

Sahyadri Residency Phase I is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700013099. Sahyadri Residency Phase I is located at Survey No 76/5/1. This is a New being developed by M/S Nirman Developers.

Sahyadri Residency Phase I has 1 BHK & 2 BHK Apartments with carpet areas ranging from 316 to 497 Sq.ft. Carpet. The Project has total 82 of which 70 are currently available for sale.

Sahyadri Residency Phase I is being developed on a total land area of 38063 Sq.ft. out of which 5134 Sq.ft. i.e 13% is reserved for recreational purposes. Sahyadri Residency Phase I has 2 Wings / Towers Building 4,Building 7/A

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Sahyadri Residency Phase I
  • Location:
  • Survey No 76/5/1
  • Const. Stage:
    New
  • Possession:
    30 Dec 2022
Developer Details

  • Developer:
    M/S Nirman Developers
  • Phone:
  • Address:
  • Behind Kunbi Samaj Hall
Project RERA Details
MAHA REARA No: P51700013099
Project Type Residential / Group Housing
RERA Project Status New
Architect Geo Associates
Funding Bank AXIS BANK
Proposed Possession 30 Dec 2022
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 28 Apr 2023
Last Retrived 26 Jul 2025
Sahyadri Residency Phase I QR Code
Sahyadri Residency Phase I
MahaRERA - P51700013099
Apartment Details & Configuration
TypeArea
1RK21.89 Sq.mts. ( 236 Sq.ft. )
1RK26.36 Sq.mts. ( 284 Sq.ft. )
1RK26.74 Sq.mts. ( 288 Sq.ft. )
1RK27.07 Sq.mts. ( 291 Sq.ft. )
1 BHK29.38 Sq.mts. ( 316 Sq.ft. )
1 BHK30.69 Sq.mts. ( 330 Sq.ft. )
1 BHK31.1 Sq.mts. ( 335 Sq.ft. )
1 BHK31.39 Sq.mts. ( 338 Sq.ft. )
1 BHK32.23 Sq.mts. ( 347 Sq.ft. )
2 BHK46.18 Sq.mts. ( 497 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Sahyadri Residency Phase Ilast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Na
Energy management
Na
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting
Na
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Na
Solid Waste Management And Disposal
Na
Storm Water Drains
Na
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Na
Water Supply
Na
Buildings / Wings in Sahyadri Residency Phase I
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Sahyadri Residency Phase I by M/S Nirman Developerslast updated on 26 Jul 2025 as per information obtained from MARA RERA.

38063 Sq. ft.

Project Area

5134 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

82 apartments in total
Total
82
Booked
12
Available
70

Saleable Area Statistics (Sq. ft.)

26262 Total
Total
26262
Booked
3463
Available
22799
Total 82 apartments in project. 12 apartments booked. 14% apartments booked.
Total 26262 Sq.ft. saleable area. 3463 saleable area booked.
13% area booked.

Building 4

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building 4Dec 20215101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1RK21.89 Sq.mts. ( 236 Sq.ft. )8
None Booked0% Booked
0% Booked
1RK26.36 Sq.mts. ( 284 Sq.ft. )8
3 Booked37% Booked
37% Booked
1RK26.74 Sq.mts. ( 288 Sq.ft. )8
3 Booked37% Booked
37% Booked
1RK27.07 Sq.mts. ( 291 Sq.ft. )16
6 Booked37% Booked
37% Booked
40 total apartments / 12 apartments booked. 30% apartments booked.
Work Description in Building Building 4Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress50% done
50% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress50% done
50% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress98% done
98% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress98% done
98% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress90% done
90% Booked
Sanitary Fittings within the flats / premises
work-in-progress90% done
90% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Building 7/A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building 7/ADec 20218101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK29.38 Sq.mts. ( 316 Sq.ft. )7
None Booked0% Booked
0% Booked
1 BHK30.69 Sq.mts. ( 330 Sq.ft. )7
None Booked0% Booked
0% Booked
1 BHK31.1 Sq.mts. ( 335 Sq.ft. )7
None Booked0% Booked
0% Booked
1 BHK31.39 Sq.mts. ( 338 Sq.ft. )7
None Booked0% Booked
0% Booked
1 BHK32.23 Sq.mts. ( 347 Sq.ft. )7
None Booked0% Booked
0% Booked
2 BHK46.18 Sq.mts. ( 497 Sq.ft. )7
None Booked0% Booked
0% Booked
42 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Building 7/ACompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
M/S Nirman Developers
for Project
Sahyadri Residency Phase I
last updated on 26 Jul 2025 as per information obtained from MARA RERA.