Project overview

S R Scheme At Rahul Nagar, Sewree is a MahaRERA Registered Project bearing MahaRERA Registration Number P51900005130. S R Scheme At Rahul Nagar, Sewree is located at 73 Part Of Sewree Wadala Estate Scheme No 57. This is a Ongoing being developed by Shivshahi Punarvasan Prakalp Ltd.

S R Scheme At Rahul Nagar, Sewree has 1 BHK, SHOP TYPE 1, SHOP TYPE 2, SHOP TYPE 3, SHOP TYPE 4, SHOP TYPE 5 & SHOP TYPE 6 Apartments with carpet areas ranging from 110 to 97 Sq.ft. Carpet. The Project has total 132 of which 96 are currently available for sale.

S R Scheme At Rahul Nagar, Sewree is being developed on a total land area of 23831 Sq.ft. S R Scheme At Rahul Nagar, Sewree has 1 Wings / Towers Sale Building No 2

ProjectDeveloperLocationPossession
Project Details
  • Project:
    S R Scheme At Rahul Nagar, Sewree
  • Location:
  • 73 Part Of Sewree Wadala Estate Scheme No 57
  • Const. Stage:
    Ongoing
  • Possession:
    30 Dec 2023
Developer Details

  • Developer:
    Shivshahi Punarvasan Prakalp Ltd
  • Phone:
  • Address:
  • Griha Nirman Bhavan
Project RERA Details
MAHA REARA No: P51900005130
Project Type Others
RERA Project Status Ongoing
Architect Chandrashekhar
Funding Bank BANK OF MAHARASHTRA
Proposed Possession 30 Dec 2023
Revised Possession 30 Dec 2023
Extended Possession
Litigations No Litigations
Last Modified 09 Aug 2017
Last Retrived 26 Jul 2025
S R Scheme At Rahul Nagar, Sewree QR Code
S R Scheme At Rahul Nagar, Sewree
MahaRERA - P51900005130
Apartment Details & Configuration
TypeArea
1 BHK39.16 Sq.mts. ( 422 Sq.ft. )
SHOP TYPE 111.71 Sq.mts. ( 126 Sq.ft. )
SHOP TYPE 28.98 Sq.mts. ( 97 Sq.ft. )
SHOP TYPE 313.91 Sq.mts. ( 150 Sq.ft. )
SHOP TYPE 410.2 Sq.mts. ( 110 Sq.ft. )
SHOP TYPE 513.18 Sq.mts. ( 142 Sq.ft. )
SHOP TYPE 614.5 Sq.mts. ( 156 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of S R Scheme At Rahul Nagar, Sewreelast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Elect Meter Room
Energy management
Na
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting
Na
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Ssewer Line
Solid Waste Management And Disposal
Na
Storm Water Drains100% completed
95% Complete
Mcgm
Street Lighting100% completed
95% Complete
Building Corner Light Provided
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Na
Water Supply100% completed
95% Complete
Mcgm Water
Buildings / Wings in S R Scheme At Rahul Nagar, Sewree
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of S R Scheme At Rahul Nagar, Sewree by Shivshahi Punarvasan Prakalp Ltdlast updated on 26 Jul 2025 as per information obtained from MARA RERA.

23831 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

132 apartments in total
Total
132
Booked
36
Available
96

Saleable Area Statistics (Sq. ft.)

48744 Total
Total
48744
Booked
15175
Available
33570
Total 132 apartments in project. 36 apartments booked. 27% apartments booked.
Total 48744 Sq.ft. saleable area. 15175 saleable area booked.
31% area booked.

Sale Building No 2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Sale Building No 2Jan 190081010019
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK39.16 Sq.mts. ( 422 Sq.ft. )108
36 Booked33% Booked
33% Booked
SHOP TYPE 111.71 Sq.mts. ( 126 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP TYPE 28.98 Sq.mts. ( 97 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP TYPE 313.91 Sq.mts. ( 150 Sq.ft. )2
None Booked0% Booked
0% Booked
SHOP TYPE 410.2 Sq.mts. ( 110 Sq.ft. )7
None Booked0% Booked
0% Booked
SHOP TYPE 513.18 Sq.mts. ( 142 Sq.ft. )7
None Booked0% Booked
0% Booked
SHOP TYPE 614.5 Sq.mts. ( 156 Sq.ft. )6
None Booked0% Booked
0% Booked
132 total apartments / 36 apartments booked. 27% apartments booked.
Work Description in Building Sale Building No 2Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Shivshahi Punarvasan Prakalp Ltd
for Project
S R Scheme At Rahul Nagar, Sewree
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation