Project overview

Rajendra Jhaveri Residence is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800005957. Rajendra Jhaveri Residence is located at 629 1 To 11. This is a Ongoing being developed by Usha Developers.

Rajendra Jhaveri Residence has 1 BHK, 1 Bhk & 2 BHK Apartments with carpet areas ranging from 373 to 698 Sq.ft. Carpet. The Project has total 23 of which 23 are currently available for sale.

Rajendra Jhaveri Residence is being developed on a total land area of 8678 Sq.ft. Rajendra Jhaveri Residence has 1 Wings / Towers Rajendra Jhaveri Residence

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Rajendra Jhaveri Residence
  • Location:
  • 629 1 To 11
  • Const. Stage:
    Ongoing
  • Possession:
    31 Dec 2018
Developer Details

  • Developer:
    Usha Developers
  • Phone:
  • Address:
  • Mitul Building
Project RERA Details
MAHA REARA No: P51800005957
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Rashik P Hongoo
Funding Bank CANARA BANK
Proposed Possession 31 Dec 2018
Revised Possession 31 Dec 2018
Extended Possession
Litigations No Litigations
Last Modified 14 Aug 2017
Last Retrived 26 Jul 2025
Rajendra Jhaveri Residence QR Code
Rajendra Jhaveri Residence
MahaRERA - P51800005957
Apartment Details & Configuration
TypeArea
1 BHK34.67 Sq.mts. ( 373 Sq.ft. )
1 BHK37.18 Sq.mts. ( 400 Sq.ft. )
1 Bhk37.34 Sq.mts. ( 402 Sq.ft. )
2 BHK47.88 Sq.mts. ( 515 Sq.ft. )
2 BHK53.87 Sq.mts. ( 580 Sq.ft. )
2 BHK60.37 Sq.mts. ( 650 Sq.ft. )
2 BHK64.83 Sq.mts. ( 698 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Rajendra Jhaveri Residencelast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Work In Progress
Energy management
Na
Fire Protection And Fire Safety Requirements
Work In Progress
Landscaping & Tree Planting
Work In Progress
Open Parking2% completed
2% Complete
Work In Progress
Sewerage (Chamber, Lines, Septic Tank , STP)
Work In Progress
Solid Waste Management And Disposal80% completed
80% Complete
Work In Progress
Storm Water Drains
Work In Progress
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Work In Progress
Water Supply
Work In Progress
Buildings / Wings in Rajendra Jhaveri Residence
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Rajendra Jhaveri Residence by Usha Developerslast updated on 26 Jul 2025 as per information obtained from MARA RERA.

8678 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

23 apartments in total
Total
23
Booked
0
Available
23

Saleable Area Statistics (Sq. ft.)

11785 Total
Total
11785
Booked
0
Available
11785
Total 23 apartments in project. 0 apartments booked. 0% apartments booked.
Total 11785 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.

Rajendra Jhaveri Residence

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Rajendra Jhaveri ResidenceJan 1900131030114
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK34.67 Sq.mts. ( 373 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK37.18 Sq.mts. ( 400 Sq.ft. )6
None Booked0% Booked
0% Booked
1 Bhk37.34 Sq.mts. ( 402 Sq.ft. )5
None Booked0% Booked
0% Booked
2 BHK47.88 Sq.mts. ( 515 Sq.ft. )2
None Booked0% Booked
0% Booked
2 BHK53.87 Sq.mts. ( 580 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK60.37 Sq.mts. ( 650 Sq.ft. )4
None Booked0% Booked
0% Booked
2 BHK64.83 Sq.mts. ( 698 Sq.ft. )4
None Booked0% Booked
0% Booked
23 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Rajendra Jhaveri ResidenceCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress45% done
45% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress35% done
35% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress35% done
35% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress75% done
75% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress40% done
40% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress40% done
40% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress45% done
45% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress75% done
75% Booked
Channel Partners
Channel Partners Registered by Developer
Usha Developers
for Project
Rajendra Jhaveri Residence
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation