Project overview

ProjectDeveloperLocationPossession
Project Details
  • Project:
  • Location:
  • Const. Stage:
  • Possession:
Developer Details

  • Developer:
  • Phone:
  • Address:
Project RERA Details
MAHA REARA No:
Project Type
RERA Project Status
Architect
Funding Bank
Proposed Possession
Revised Possession
Extended Possession
Litigations
Last Modified
Last Retrived
Apartment Details & Configuration
TypeArea
1 BHK A29.15 Sq.mts. ( 314 Sq.ft. )
1 BHK B37.4 Sq.mts. ( 403 Sq.ft. )
1 BHK C30.77 Sq.mts. ( 331 Sq.ft. )
1 BHK D35.67 Sq.mts. ( 384 Sq.ft. )
2 BHK A48.34 Sq.mts. ( 520 Sq.ft. )
2 BHK B47.85 Sq.mts. ( 515 Sq.ft. )
SHOP A6.06 Sq.mts. ( 65 Sq.ft. )
SHOP C14.18 Sq.mts. ( 153 Sq.ft. )
SHOP D19.23 Sq.mts. ( 207 Sq.ft. )
SHOP E8.32 Sq.mts. ( 90 Sq.ft. )
SHOPB19 Sq.mts. ( 205 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of last updated on as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
-
Energy management
Na
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting
-
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Municipal Drain
Solid Waste Management And Disposal
Municipal Drainage System
Storm Water Drains
-
Street Lighting
-
Treatment And Disposal Of Sewage And Sullage Water
Municipal Drainage System
Water Conservation, Rain water Harvesting
-
Water Supply
Water Pipeline
Buildings / Wings in
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of by last updated on as per information obtained from MARA RERA.

Project Area

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

29 apartments in total
Total
29
Booked
7
Available
22

Saleable Area Statistics (Sq. ft.)

9418 Total
Total
9418
Booked
2745
Available
6672
Total 29 apartments in project. 7 apartments booked. 24% apartments booked.
Total 9418 Sq.ft. saleable area. 2745 saleable area booked.
29% area booked.

Parshuram Siddhi

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Parshuram SiddhiJan 19005100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK A29.15 Sq.mts. ( 314 Sq.ft. )4
1 Booked25% Booked
25% Booked
1 BHK B37.4 Sq.mts. ( 403 Sq.ft. )4
1 Booked25% Booked
25% Booked
1 BHK C30.77 Sq.mts. ( 331 Sq.ft. )4
3 Booked75% Booked
75% Booked
1 BHK D35.67 Sq.mts. ( 384 Sq.ft. )2
None Booked0% Booked
0% Booked
2 BHK A48.34 Sq.mts. ( 520 Sq.ft. )4
1 Booked25% Booked
25% Booked
2 BHK B47.85 Sq.mts. ( 515 Sq.ft. )2
1 Booked50% Booked
50% Booked
SHOP A6.06 Sq.mts. ( 65 Sq.ft. )2
None Booked0% Booked
0% Booked
SHOP C14.18 Sq.mts. ( 153 Sq.ft. )2
None Booked0% Booked
0% Booked
SHOP D19.23 Sq.mts. ( 207 Sq.ft. )2
None Booked0% Booked
0% Booked
SHOP E8.32 Sq.mts. ( 90 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOPB19 Sq.mts. ( 205 Sq.ft. )2
None Booked0% Booked
0% Booked
29 total apartments / 7 apartments booked. 24% apartments booked.
Work Description in Building Parshuram SiddhiCompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress38% done
38% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress40% done
40% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress40% done
40% Booked
Channel Partners
Channel Partners Registered by Developer
for Project
last updated on as per information obtained from MARA RERA.
Name Company Location Mobile Designation