Project overview

Parekh Celeste is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800047291. Parekh Celeste is located at 903/2. This is a New being developed by Yash Akar Developers Llp.

Parekh Celeste has 1 BHK Apartments with carpet areas ranging from 317 to 432 Sq.ft. Carpet. The Project has total 37 of which 23 are currently available for sale.

Parekh Celeste is being developed on a total land area of 14494 Sq.ft. Parekh Celeste has 2 Wings / Towers Parekh Celeste A Wing,Parekh Celeste B Wing

ProjectDeveloperLocationPossession
UjvalParanjape Schemes (Construction) Ltd23 And Part Of 24, Cts No.63-A Or Originally Bearing Plot No 2231-12-2019 00:00:00
Hetali BlessingsHetali Enterprises257/A04-08-2019 00:00:00
Chaitanya ResidencyEthics Infra Development Pvt Ltd93, 93/1 And 2, Cts No. 38030-04-2018 00:00:00
Janardan ChslMahesh Laxman ThakkarPlot No 7631-03-2019 00:00:00
Global ResidencyGlobal Housing VenturesCts 44401-07-2023 00:00:00
Tower 28Shiv Shakti Builders And Developers19/1 To 6730-06-2022 00:00:00
Anmol Fortune - IiWadhwa Realty Pvt Ltd. Cts No-58 Part 1 To 7631-12-2019 00:00:00
Sheetal AniketD.G. Land Developers Private Limited400063, Mumbai Suburban31-12-2018 00:00:00
Anmol Fortune - IiiWadhwa Realty Pvt Ltd. Cts No 58 Part 1 To 7630-12-2022 00:00:00
Chandak StellaSaroj Landmark Realty LlpCts 914 Survey No 51 Hissa 2 Part And Surbey No 52 Hissa 1 Part30-03-2022 00:00:00
GharkulAjitkumar Chs LtdMumbai Suburban, 40006331-12-2019 00:00:00
Applaud-38I M Buildcon38A, 18 P30-12-2024 00:00:00
Aether Wing B2 - Phase 1A - Upto 20Th FloorRomell Properties Private Limited175/4, 175/530-12-2023 00:00:00
Svarna KojagiriSvarna Realties LlpCts No 302 Plot No 05 Survey No 9330-12-2021 00:00:00
Hansini EleganceKarsan Bachu SatraCts No 475 475/1-6 Pahadi Goregaon And 116 116/1 Pahadi Eksar31-12-2019 00:00:00
Redevelopment Of Niwara Co-Op Hsg Society LtdThe Niwara Co-Operative Housing Society LtdCts No. 155A30-06-2024 00:00:00
Sheetal KrupaD.G.Land Developers Private Limited224/B/13 To 17, 225, 224/B/631-12-2018 00:00:00
111 Hyde ParkMdm Realty111/96/C/130-06-2022 00:00:00
Empire TowersSahakar Ventures371, 367 B, 66 B, 368 2, 367 A 2, 65 1, 66 1, 372, 65 B, Cts 367 A 1, 66 A, 368, 65 A, 368 1, 605, 370 1, 37030-09-2024 00:00:00
63 Goldmedal AvenueRishabraj Estate Developers Pvt Ltd906 906/1 To 2930-05-2027 00:00:00
Ashish Building Of Emticibom Employees Chs LtdKarwa And Kewal Kiran Realtors8362, 8363, 836430-09-2024 00:00:00
Dgs HeightsD.G.Builders206/1 To 15, 20631-12-2018 00:00:00
Lodha FiorenzaMacrotech Developers Limited586/1, 257/G31-01-2018 00:00:00
Happy Home EnclaveJd & Fc Ventures Llp348 (Part)31-12-2026 00:00:00
Onyx Apartment - Redevelopment Of Kunfayakun Chsl BuildingRefab Construction (India) Pvt. Ltd.21A/331-01-2018 00:00:00
HorizonJaycee Homes Private Limited400063, Mumbai Suburban31-03-2018 00:00:00
Hiramani EnclaveDamji Hirji & Company28/1 To 8, Cts No. 28A01-06-2019 00:00:00
Redevelopment Of Lamplight ChslShree Mahavir EstatesSurvey No.287, Cts.21 Pt, Plot 5/631-12-2019 00:00:00
Express Zone MallCello Sonal ConstructionCts No. 1B/1/B/1, Village Dindoshi And 581/C/130-06-2024 00:00:00
Kush PrestigeKush Buildcon Llp569, 57031-12-2017 00:00:00
Navjeevan HeightsKonark Shakti Group Of CompaniesCts No 21B30-09-2018 00:00:00
Palai TowersN D Developers90230-06-2021 00:00:00
Romell Aether Wing B1Romell Properties Private Limited175/4 And 175/530-12-2021 00:00:00
Samruddhi HeightsSavita GajarePahadi Goregaon (West)30-12-2023 00:00:00
Redevelopment Of Navchandrakunj ChslPranav Constructions LimitedPlot No.42, Cts No.734/A, 734/1 To 630-03-2022 00:00:00
Redevelopment Of Abhiram ChslPranav Constructions LimitedCts No 1344/A01-06-2023 00:00:00
VijayagarSkyline Landmark Projects Private Limited31131-12-2022 00:00:00
Kabra DiamanteKabra And Associates73, 73 / 1 To 6531-12-2025 00:00:00
KrupaAasamanta Realty38831-03-2024 00:00:00
Luxury Chsl LtdLaxmidevi DevelopersBehind Filmistan30-06-2025 00:00:00
SmritiMahesh Balkrishna Sambhus11631-03-2026 00:00:00
Rekha ChslD S M Group13131-12-2026 00:00:00
VindhyagiriGio PropertiesC.T.S No.- 369C And 369C ( 17 To 21 ) And C.T.S No.- 70/4, Plot No. -525-02-2025 00:00:00
Paras ResidencyAureum Spaces Llp141/A30-09-2025 00:00:00
Asmi Business CentreAsmi CorporationSurvey No.3 Part Hissa No.6 Old Cts No.51 Part And New Cts No 51A/B31-12-2025 00:00:00
Accord ClassicSuyojana Impex Pvt. Ltd46, 46/1 To 2630-03-2022 00:00:00
Solaris BhagyashreeSolaris Developers Private LimitedMumbai Suburban, 40006331-12-2018 00:00:00
Asmi DreamzAjay Malshi Dedhia340 Pt, 33931-03-2018 00:00:00
KrishnaK Patel And Co Pvt Ltd383/1To6, 38330-06-2024 00:00:00
Rajan Dinakar Phatak And OthersWestin Sankalp Developers68/393, 393/1 To 230-06-2024 00:00:00
AstrumUpvan Developers97A/2C/4, 97A/2C/231-12-2024 00:00:00
Avant HillwayRaghvendra Construction Company Pvt LtdCts No 610 A/1B/130-12-2024 00:00:00
Avant HillwayRaghvendra Construction Company Pvt LtdCts No 610A/1B/230-12-2024 00:00:00
Kanchan ChslC H Patil And Sons LlpCts No 9731-03-2019 00:00:00
Kenorita Jewels Phase IiK R Shoppers Private Limited796, 793 /1 To 11, 796/ 1 To 25 & 819, 79431-12-2025 00:00:00
Bali DivineBali Estates Llp710 710/1 To 710/831-07-2025 00:00:00
Modirealty VatvrikshModirealty Developers Pvt LtdPlot No 28 Cts No 57 (Part) Of Village Goregaon Pahadi30-09-2026 00:00:00
Chandan HiraBali Shelters LlpCts No 703 Plot No 8130-09-2024 00:00:00
MotivillaAakar Shiv Infra Venture755/1 To 6, 75531-03-2024 00:00:00
Redevelopment Of Rushabh Mahal ChslPranav Constructions LimitedCity Survey No. 23/A/26230-06-2025 00:00:00
Samarth TanishNitin Dattaram Samant31830-12-2023 00:00:00
HimbinduM/S. Sahajanand Developers292/21 To 30, 292 Pt31-12-2018 00:00:00
Om HeightsKosmos &Amp; Apple RealtyMalad31-12-2020 00:00:00
Nirlon Employees Cooperative Housing Society Limited Building No 11, 12 ,13Shivam Parivar Developers Pvt Ltd355 Pt30-12-2024 00:00:00
New Bhagyashree Chs LtdK. Anand Construction Private LimitedPlot No 43 Cts No 175 1-431-12-2017 00:00:00
Conwood ParagonConsolidated Crop Protection Private LimitedMumbai Suburban, 40006301-07-2020 00:00:00
Saptaratna TowersRaja Constructions Company33/1231-12-2017 00:00:00
Eaze Zone In Laxmi Singh ComplexKeystone Realtors Pvt. Ltd.1214/130-06-2021 00:00:00
Om Sai Amrut ChsShree Sai Swami Developers335-1 To 2131-12-2018 00:00:00
Astoria Tower BConwood Realty Private Limited158D/1B31-12-2020 00:00:00
Romell Aether Wing B 2-Phase 2 34Th To 39Th FloorsRomell Properties Private Limited175/5, 175/430-12-2025 00:00:00
Un NamedSanjay Fakirchand Garg32628-02-2021 00:00:00
Axiom AvenAxiom Realty Pvt LtdMumbai Suburban31-12-2018 00:00:00
Jaywant Villa Co.Operative Housing Society LtdMahendra SawantMumbai Suburban, 40006330-06-2018 00:00:00
Sector R 3 MhadaGuruashish Construction Private LimitedPlot No R-03 C T S No 22-A 4 Pt31-12-2017 00:00:00
Ronit ResidencyRushi Builders And Developers400063, Mumbai Suburban31-12-2017 00:00:00
Mandlik Nagar Chs Ltd Phase Ii Rehab Wing E Pt And FTriumph Builders Llp29 Pt31-12-2018 00:00:00
Om Ganesh KrupaDharma Construction21A/530-06-2019 00:00:00
Om HeightsOm Shiv Construction CoMumbai Suburban, 40005813-10-2020 00:00:00
Premleela HeightsPrem Leela DevelopersMumbai Suburban31-12-2015 00:00:00
Jaliyan Heights GoregaonJaliyan Developer237/1 To 1930-12-2022 00:00:00
Shashikala Premises Co-Operative Society LimitedHeartland Habitats Llp90/714, 714-131-07-2019 00:00:00
Aether Wing B2 - Phase 1B - From 21St To 33Rd FloorRomell Properties Private Limited175/5, 175/430-12-2023 00:00:00
Deep Darshani ChsSarvoday Builders And Developers26, 26 1 To 1530-12-2021 00:00:00
Kabra Aurum Wing A B C And D Redevelopment Of Goregaon Unnat Nagar Ii Plot No 51 To 55 ChslKabra And AssociatesPlot No 51 To 55 Cts 307 Part31-12-2019 00:00:00
Poonam HeightsShah & Mehta AssociatesCts No 916 And 139331-12-2018 00:00:00
GulmoharUdyam Enterprises400063, Mumbai Suburban30-06-2022 00:00:00
VivantaKeyland Developers Private Limited181, 181/1 To 7131-12-2029 00:00:00
Avalon ResidencyAvalon Residency LlpCts No 928/A/01 Of Villlage Pahadi Goregaon West And Cts No 1390, 1390/A, 1390/1 To 11 Of Village Malad S31-05-2028 00:00:00
Sheetal KundD.G.Land Developers Pvt Ltd365 A 365A 1 To 3 365 B365 C 101-07-2023 00:00:00
Upper East 97Prima Terra Buildtech Pvt. Ltd.97A/2430-12-2022 00:00:00
Goregaon Matrusmruti ChslMadhu Associates171, 171/1 To 1031-12-2025 00:00:00
AshwinSkyline Landmark Projects Private Limited30330-09-2025 00:00:00
Ashwin HeightsWestinrely Developers Pvt Ltd29731-12-2026 00:00:00
Harshail Emerald ApartmentHarshmaan Spaces Llp97A/1131-01-2027 00:00:00
RadhakrishnaK.Pateland Co136 A31-12-2017 00:00:00
Atlanta Estate ExtensionAtul Raj Builders Pvt Ltd400063, Mumbai City30-06-2011 00:00:00
Project Details
  • Project:
    Parekh Celeste
  • Location:
  • 903/2
  • Const. Stage:
    New
  • Possession:
    30 Apr 2027
Developer Details

  • Developer:
    Yash Akar Developers Llp
  • Phone:
  • Address:
  • Dheeraj Heritage
Project RERA Details
MAHA REARA No: P51800047291
Project Type Residential / Group Housing
RERA Project Status New
Architect Ketan Vaidya Associates
Funding Bank ICICI BANK LIMITED
Proposed Possession 30 Apr 2027
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 17 Oct 2022
Last Retrived 26 Jul 2025
Parekh Celeste QR Code
Parekh Celeste
MahaRERA - P51800047291
Apartment Details & Configuration
TypeArea
1 BHK36.88 Sq.mts. ( 397 Sq.ft. )
2 BHK55.93 Sq.mts. ( 602 Sq.ft. )
1 BHK29.45 Sq.mts. ( 317 Sq.ft. )
1 BHK34.1 Sq.mts. ( 367 Sq.ft. )
1 BHK40.13 Sq.mts. ( 432 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Parekh Celestelast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Planned As Per Power Supply Company
Energy management
Planned
Fire Protection And Fire Safety Requirements
Planned As Per Cfo Noc
Landscaping & Tree Planting
Trees Will Be Planted Before O.C.C.
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Will Be Executed As Per The Remarks From Mcgm
Solid Waste Management And Disposal
Noc Received
Storm Water Drains
Will Be Executed As Per The Remarks From Mcgm
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Sewage And Sullage Water Pipe Connected To Mcgm
Water Conservation, Rain water Harvesting
Noc Received
Water Supply
Construction Connection Availed
Buildings / Wings in Parekh Celeste
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Parekh Celeste by Yash Akar Developers Llplast updated on 26 Jul 2025 as per information obtained from MARA RERA.

14494 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

37 apartments in total
Total
37
Booked
14
Available
23

Saleable Area Statistics (Sq. ft.)

17414 Total
Total
17414
Booked
6088
Available
11326
Total 37 apartments in project. 14 apartments booked. 37% apartments booked.
Total 17414 Sq.ft. saleable area. 6088 saleable area booked.
35% area booked.

Parekh Celeste A Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Parekh Celeste A WingApr 2027141000012
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK36.88 Sq.mts. ( 397 Sq.ft. )12
5 Booked41% Booked
41% Booked
2 BHK55.93 Sq.mts. ( 602 Sq.ft. )13
3 Booked23% Booked
23% Booked
25 total apartments / 8 apartments booked. 32% apartments booked.
Work Description in Building Parekh Celeste A WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress50% done
50% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress65% done
65% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress50% done
50% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Parekh Celeste B Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Parekh Celeste B WingApr 2027141000028
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK29.45 Sq.mts. ( 317 Sq.ft. )2
2 Booked100% Booked
100% Booked
1 BHK34.1 Sq.mts. ( 367 Sq.ft. )2
1 Booked50% Booked
50% Booked
1 BHK40.13 Sq.mts. ( 432 Sq.ft. )8
3 Booked37% Booked
37% Booked
12 total apartments / 6 apartments booked. 50% apartments booked.
Work Description in Building Parekh Celeste B WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress50% done
50% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress65% done
65% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress50% done
50% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Yash Akar Developers Llp
for Project
Parekh Celeste
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation