Project overview

Palava Milano A,B,C,H,I,J is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700015016. Palava Milano A,B,C,H,I,J is located at 29/5Pt, 29/6Pt. This is a New being developed by Palava Dwellers Private Limited.

Palava Milano A,B,C,H,I,J has 1 BHK, 2 BHK ULTIMA, 2 BHK Ultima & 3 BHK OPTIMA Apartments with carpet areas ranging from 398 to 642 Sq.ft. Carpet. The Project has total 560 of which 133 are currently available for sale.

Palava Milano A,B,C,H,I,J is being developed on a total land area of 53333 Sq.ft. out of which 30747 Sq.ft. i.e 58% is reserved for recreational purposes. Palava Milano A,B,C,H,I,J has 6 Wings / Towers Milano A,Milano B,Milano C,Milano H,Milano I,Milano J

ProjectDeveloperLocationPossession
Palava Aurelia - C, H, IPalava Dwellers Private Limited144/8, 42/130-06-2023 00:00:00
Palava Marvella B,C,D,E,F,GPalava Dwellers Private Limited32/2 Pt , 32/7 Pt ,32/8 Pt30-06-2023 00:00:00
Fontana A ,B, I And JPalava Dwellers Private Limited37/1A Pt 37/1B Pt 37/2B Pt 37/3 Pt30-12-2022 00:00:00
Palava Fontana C - HPalava Dwellers Private Limited37/1B Pt 37/2A Pt 143/3 Pt 38/2P Pt 37/4 Pt 37/3 Pt 37/2B Pt30-12-2020 00:00:00
Palava Milano A,B,C,H,I,JPalava Dwellers Private Limited29/5Pt, 29/6Pt30-10-2023 00:00:00
Palava Aurora A,DPalava Dwellers Private Limited37/11Pt ,32/1Pt ,32/10Pt30-10-2023 00:00:00
Project Details
  • Project:
    Palava Milano A,B,C,H,I,J
  • Location:
  • 29/5Pt, 29/6Pt
  • Const. Stage:
    New
  • Possession:
    30 Oct 2023
Developer Details

  • Developer:
    Palava Dwellers Private Limited
  • Phone:
  • Address:
  • Vardhaman Chambber
Project RERA Details
MAHA REARA No: P51700015016
Project Type Residential / Group Housing
RERA Project Status New
Funding Bank YES BANK
Proposed Possession 30 Oct 2023
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 28 Sep 2018
Last Retrived 26 Jul 2025
Palava Milano A,B,C,H,I,J QR Code
Palava Milano A,B,C,H,I,J
MahaRERA - P51700015016
Apartment Details & Configuration
TypeArea
1 BHK37 Sq.mts. ( 398 Sq.ft. )
1 BHK37.07 Sq.mts. ( 399 Sq.ft. )
1 BHK39.68 Sq.mts. ( 427 Sq.ft. )
1 BHK39.76 Sq.mts. ( 428 Sq.ft. )
1 BHK47.19 Sq.mts. ( 508 Sq.ft. )
2 BHK52.86 Sq.mts. ( 569 Sq.ft. )
2 BHK ULTIMA50.14 Sq.mts. ( 540 Sq.ft. )
2 BHK Ultima50.17 Sq.mts. ( 540 Sq.ft. )
2 BHK ULTIMA52.82 Sq.mts. ( 569 Sq.ft. )
3 BHK OPTIMA59.64 Sq.mts. ( 642 Sq.ft. )
1 BHK39.48 Sq.mts. ( 425 Sq.ft. )
2 BHK Ultima49.05 Sq.mts. ( 528 Sq.ft. )
3 BHK OPTIMA59.74 Sq.mts. ( 643 Sq.ft. )
2 BHK ULTIMA48.96 Sq.mts. ( 527 Sq.ft. )
2 BHK Ultima55.18 Sq.mts. ( 594 Sq.ft. )
3 BHK OPTIMA59.66 Sq.mts. ( 642 Sq.ft. )
3 BHK OPTIMA59.72 Sq.mts. ( 643 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Palava Milano A,B,C,H,I,Jlast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space100% completed
95% Complete
Na
Closing Parking100% completed
95% Complete
Na
Clubhouse
Shared Across Multiple Phases Of Projects
Community Buildings100% completed
95% Complete
Shared Across Multiple Phases Of Projects
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Na
Energy management100% completed
95% Complete
Na
Fire Protection And Fire Safety Requirements100% completed
95% Complete
Na
Landscaping & Tree Planting100% completed
95% Complete
Na
Open Parking100% completed
95% Complete
Na
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Na
Solid Waste Management And Disposal100% completed
95% Complete
Na
Sports Complex
Shared Across Multiple Phases Of Projects
Storm Water Drains100% completed
95% Complete
Na
Street Lighting100% completed
95% Complete
Na
Temple
Shared Across Multiple Phases Of Projects
Treatment And Disposal Of Sewage And Sullage Water100% completed
95% Complete
Na
Water Conservation, Rain water Harvesting100% completed
95% Complete
Na
Water Supply100% completed
95% Complete
Na
Buildings / Wings in Palava Milano A,B,C,H,I,J
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Palava Milano A,B,C,H,I,J by Palava Dwellers Private Limitedlast updated on 26 Jul 2025 as per information obtained from MARA RERA.

53333 Sq. ft.

Project Area

30747 Sq. ft.

Recreational Open Space

Total 6

Wings / Towers in Project

Apartments Statistics

560 apartments in total
Total
560
Booked
427
Available
133

Saleable Area Statistics (Sq. ft.)

271815 Total
Total
271815
Booked
198354
Available
73461
Total 560 apartments in project. 427 apartments booked. 76% apartments booked.
Total 271815 Sq.ft. saleable area. 198354 saleable area booked.
73% area booked.

Milano A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Milano AOct 2023191000996
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK37 Sq.mts. ( 398 Sq.ft. )6
6 Booked100% Booked
100% Booked
1 BHK37.07 Sq.mts. ( 399 Sq.ft. )58
56 Booked96% Booked
96% Booked
1 BHK39.68 Sq.mts. ( 427 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK39.76 Sq.mts. ( 428 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK47.19 Sq.mts. ( 508 Sq.ft. )2
None Booked0% Booked
0% Booked
2 BHK52.86 Sq.mts. ( 569 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK ULTIMA50.14 Sq.mts. ( 540 Sq.ft. )2
2 Booked100% Booked
100% Booked
2 BHK Ultima50.17 Sq.mts. ( 540 Sq.ft. )32
21 Booked65% Booked
65% Booked
2 BHK ULTIMA52.82 Sq.mts. ( 569 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK OPTIMA59.64 Sq.mts. ( 642 Sq.ft. )1
1 Booked100% Booked
100% Booked
105 total apartments / 90 apartments booked. 85% apartments booked.
Work Description in Building Milano ACompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress80% done
80% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Milano B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Milano BOct 2023191000961
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK39.48 Sq.mts. ( 425 Sq.ft. )2
None Booked0% Booked
0% Booked
2 BHK Ultima49.05 Sq.mts. ( 528 Sq.ft. )32
17 Booked53% Booked
53% Booked
2 BHK Ultima50.17 Sq.mts. ( 540 Sq.ft. )1
None Booked0% Booked
0% Booked
3 BHK OPTIMA59.74 Sq.mts. ( 643 Sq.ft. )35
13 Booked37% Booked
37% Booked
70 total apartments / 30 apartments booked. 42% apartments booked.
Work Description in Building Milano BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress80% done
80% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Milano C

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Milano COct 2023191000996
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK37.07 Sq.mts. ( 399 Sq.ft. )64
62 Booked96% Booked
96% Booked
1 BHK39.76 Sq.mts. ( 428 Sq.ft. )2
2 Booked100% Booked
100% Booked
1 BHK47.19 Sq.mts. ( 508 Sq.ft. )2
None Booked0% Booked
0% Booked
2 BHK ULTIMA50.17 Sq.mts. ( 540 Sq.ft. )34
18 Booked52% Booked
52% Booked
2 BHK ULTIMA52.82 Sq.mts. ( 569 Sq.ft. )2
1 Booked50% Booked
50% Booked
3 BHK OPTIMA59.64 Sq.mts. ( 642 Sq.ft. )1
1 Booked100% Booked
100% Booked
105 total apartments / 84 apartments booked. 80% apartments booked.
Work Description in Building Milano CCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress80% done
80% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Milano H

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Milano HOct 2023191000996
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK37.07 Sq.mts. ( 399 Sq.ft. )64
63 Booked98% Booked
98% Booked
1 BHK39.76 Sq.mts. ( 428 Sq.ft. )2
2 Booked100% Booked
100% Booked
1 BHK47.19 Sq.mts. ( 508 Sq.ft. )2
None Booked0% Booked
0% Booked
2 BHK ULTIMA50.17 Sq.mts. ( 540 Sq.ft. )34
11 Booked32% Booked
32% Booked
2 BHK ULTIMA52.86 Sq.mts. ( 569 Sq.ft. )2
None Booked0% Booked
0% Booked
3 BHK OPTIMA59.64 Sq.mts. ( 642 Sq.ft. )1
1 Booked100% Booked
100% Booked
105 total apartments / 77 apartments booked. 73% apartments booked.
Work Description in Building Milano HCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress80% done
80% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Milano I

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Milano IOct 2023191000961
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK39.48 Sq.mts. ( 425 Sq.ft. )2
2 Booked100% Booked
100% Booked
2 BHK ULTIMA48.96 Sq.mts. ( 527 Sq.ft. )7
7 Booked100% Booked
100% Booked
2 BHK ultima49.05 Sq.mts. ( 528 Sq.ft. )25
18 Booked72% Booked
72% Booked
2 BHK Ultima55.18 Sq.mts. ( 594 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK ULTIMA59.74 Sq.mts. ( 643 Sq.ft. )33
25 Booked75% Booked
75% Booked
3 BHK OPTIMA59.66 Sq.mts. ( 642 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK OPTIMA59.72 Sq.mts. ( 643 Sq.ft. )1
1 Booked100% Booked
100% Booked
70 total apartments / 55 apartments booked. 78% apartments booked.
Work Description in Building Milano ICompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress80% done
80% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Milano J

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Milano JOct 2023191000996
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK37 Sq.mts. ( 398 Sq.ft. )8
8 Booked100% Booked
100% Booked
1 BHK37.07 Sq.mts. ( 399 Sq.ft. )56
55 Booked98% Booked
98% Booked
1 BHK39.68 Sq.mts. ( 427 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK39.76 Sq.mts. ( 428 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK47.19 Sq.mts. ( 508 Sq.ft. )2
None Booked0% Booked
0% Booked
2 BHK ULTIMA50.14 Sq.mts. ( 540 Sq.ft. )3
3 Booked100% Booked
100% Booked
2 BHK Ultima50.17 Sq.mts. ( 540 Sq.ft. )31
22 Booked70% Booked
70% Booked
2 BHK ULTIMA52.86 Sq.mts. ( 569 Sq.ft. )2
None Booked0% Booked
0% Booked
3 BHK OPTIMA59.64 Sq.mts. ( 642 Sq.ft. )1
1 Booked100% Booked
100% Booked
105 total apartments / 91 apartments booked. 86% apartments booked.
Work Description in Building Milano JCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress80% done
80% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Palava Dwellers Private Limited
for Project
Palava Milano A,B,C,H,I,J
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation