Project overview

Neptune Triveni Sangam is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700010701. Neptune Triveni Sangam is located at Thane, 421102. This is a On-Going Project being developed by Neptune Developers Limited.

Neptune Triveni Sangam has 1 BHK S, 1 BHKB, 1 BHKB1, 1 BHKS1, 2 BHKB, 2 BHKB1, 2 BHKS & 2 BHKS1 Apartments with carpet areas ranging from 358 to 557 Sq.ft. Carpet. The Project has total 399 of which 370 are currently available for sale.

Neptune Triveni Sangam is being developed on a total land area of 217433 Sq.ft. out of which 13934 Sq.ft. i.e 6% is reserved for recreational purposes. Neptune Triveni Sangam has 3 Wings / Towers Brahmi,Neem,Tulsi

ProjectDeveloperLocationPossession
Neptune Swarajya Sector 1- A15Neptune Developers LimitedS No 13 No 2330-06-2018 00:00:00
Neptune Swarajya Sector 2 - B9Neptune Developers LtdS No 1/3 S No 2/331-12-2018 00:00:00
Neptune Swarajya Sector 2 - B6Neptune Developers LtdS No 1/3 S No 2/331-12-2018 00:00:00
Neptune Swarajya 4BNeptune Developers LimitedS Nos 873, 430-12-2027 00:00:00
Neptune Swarajya Sector 2 - B3Neptune Developers LtdS No 1/3 S No 2/331-12-2018 00:00:00
Neptune Swarajya Sector 2 - B8Neptune Developers LtdS No 1/3 S No 2/331-12-2018 00:00:00
Neptune Swarajya Sector 1-A4Neptune Developers LimitedS No 13, 2330-06-2018 00:00:00
Neptune Swarajya Sector 1- A14Neptune Developers LimitedS No 13 No 2330-06-2018 00:00:00
Neptune Swarajya Sector 2 - B 19Neptune Developers LtdS No 1/3 S No 2/331-12-2018 00:00:00
Neptune Swarajya Sector 2 - B10Neptune Developers LtdS No 1/3 S No 2/3, 431-12-2018 00:00:00
Neptune Swarajya Sector 2 - 2BNeptune Developers LtdS No 1/3, 2/3, 431-12-2018 00:00:00
Neptune Swarajya Sector 1-A5Neptune Developers LimitedS No 13, No 2330-06-2018 00:00:00
Neptune Swarajya Sector 2 - B11Neptune Developers LtdS No 1/3 S No 2/331-12-2018 00:00:00
Neptune Swarajya Sector 2 - B4Neptune Developers LtdS No 1/3 S No 2/331-12-2018 00:00:00
Neptune Swarajya Sector 2 - B15 And B17Neptune Developers LtdS N 1/3 S No 2/3, 431-12-2018 00:00:00
Neptune Triveni SangamNeptune Developers LimitedThane, 42110231-07-2026 00:00:00
Neptune Swarajya Sector 1-A13Neptune Developers LimitedS No 13, No 2330-06-2018 00:00:00
Neptune Swarajya Sector 1- A17Neptune Developers LimitedS No 13 No 2330-06-2018 00:00:00
Neptune Swarjaya Sector 1- A18Neptune Developers LimitedS No 13 No 2330-06-2018 00:00:00
Neptune Swarajya Sector 1-A2Neptune Developers LimitedS No 13 No 2330-06-2018 00:00:00
Neptune Swarajya Sector 2 - B16Neptune Developers LtdS No 1/3 S No 2/331-12-2018 00:00:00
Project Details
  • Project:
    Neptune Triveni Sangam
  • Location:
  • Thane, 421102
  • Const. Stage:
    On-Going Project
  • Possession:
    31 Jul 2026
Developer Details

  • Developer:
    Neptune Developers Limited
  • Phone:
  • Address:
  • 4Th Floor, Eastern Business District, Lbs Road, Near Mangatram Petrol Pump, Bahndup West, 400078
Project RERA Details
MAHA REARA No: P51700010701
Project Type Residential
RERA Project Status On-Going Project
Funding Bank HDFC BANK LTD
Proposed Possession 31 Jul 2026
Revised Possession 31 Jul 2027
Extended Possession
Litigations No Litigations
Last Modified 31 Jul 2017
Last Retrived 28 Jul 2025
Neptune Triveni Sangam QR Code
Neptune Triveni Sangam
MahaRERA - P51700010701
Apartment Details & Configuration
TypeArea
1 BHKB36.84 Sq.mts. ( 397 Sq.ft. )
1 BHKB137.23 Sq.mts. ( 401 Sq.ft. )
1 BHKS33.24 Sq.mts. ( 358 Sq.ft. )
1 BHKS133.28 Sq.mts. ( 358 Sq.ft. )
2 BHKB51.32 Sq.mts. ( 552 Sq.ft. )
2 BHKB151.74 Sq.mts. ( 557 Sq.ft. )
2 BHKS44 Sq.mts. ( 474 Sq.ft. )
2 BHKS144.03 Sq.mts. ( 474 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Neptune Triveni Sangamlast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Work To Be Done
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Work To Be Done
Energy management
Na
Fire Protection And Fire Safety Requirements
Work To Be Done
Landscaping & Tree Planting
Work To Be Done
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Work To Be Done
Solid Waste Management And Disposal
Na
Storm Water Drains
Work To Be Done
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Work To Be Done
Water Conservation, Rain water Harvesting
Work To Be Done
Water Supply
Work To Be Done
Buildings / Wings in Neptune Triveni Sangam
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Neptune Triveni Sangam by Neptune Developers Limitedlast updated on 28 Jul 2025 as per information obtained from MARA RERA.

217433 Sq. ft.

Project Area

13934 Sq. ft.

Recreational Open Space

Total 3

Wings / Towers in Project

Apartments Statistics

399 apartments in total
Total
399
Booked
29
Available
370

Saleable Area Statistics (Sq. ft.)

178884 Total
Total
178884
Booked
12455
Available
166429
Total 399 apartments in project. 29 apartments booked. 7% apartments booked.
Total 178884 Sq.ft. saleable area. 12455 saleable area booked.
7% area booked.

Brahmi

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
BrahmiJan 190018101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHKB36.84 Sq.mts. ( 397 Sq.ft. )16
4 Booked25% Booked
25% Booked
1 BHKB137.23 Sq.mts. ( 401 Sq.ft. )18
1 BHKS33.24 Sq.mts. ( 358 Sq.ft. )15
None Booked0% Booked
0% Booked
1 BHKS133.28 Sq.mts. ( 358 Sq.ft. )16
None Booked0% Booked
0% Booked
2 BHKB51.32 Sq.mts. ( 552 Sq.ft. )16
None Booked0% Booked
0% Booked
2 BHKB151.74 Sq.mts. ( 557 Sq.ft. )18
2 BHKS44 Sq.mts. ( 474 Sq.ft. )18
2 BHKS144.03 Sq.mts. ( 474 Sq.ft. )16
None Booked0% Booked
0% Booked
133 total apartments / 10 apartments booked. 7% apartments booked.
Work Description in Building BrahmiCompletion
Excavation
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Neem

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
NeemJan 190018101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK S33.24 Sq.mts. ( 358 Sq.ft. )15
1 BHKB36.84 Sq.mts. ( 397 Sq.ft. )16
1 BHKB137.23 Sq.mts. ( 401 Sq.ft. )18
4 Booked22% Booked
22% Booked
1 BHKS133.28 Sq.mts. ( 358 Sq.ft. )16
2 BHKB51.32 Sq.mts. ( 552 Sq.ft. )16
None Booked0% Booked
0% Booked
2 BHKB151.74 Sq.mts. ( 557 Sq.ft. )18
None Booked0% Booked
0% Booked
2 BHKS44 Sq.mts. ( 474 Sq.ft. )18
None Booked0% Booked
0% Booked
2 BHKS144.03 Sq.mts. ( 474 Sq.ft. )16
None Booked0% Booked
0% Booked
133 total apartments / 8 apartments booked. 6% apartments booked.
Work Description in Building NeemCompletion
Excavation
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Tulsi

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
TulsiJan 190018101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK S33.24 Sq.mts. ( 358 Sq.ft. )15
None Booked0% Booked
0% Booked
1 BHKB36.84 Sq.mts. ( 397 Sq.ft. )16
1 BHKB137.23 Sq.mts. ( 401 Sq.ft. )18
4 Booked22% Booked
22% Booked
1 BHKS133.28 Sq.mts. ( 358 Sq.ft. )16
2 BHKB51.32 Sq.mts. ( 552 Sq.ft. )16
2 BHKB151.74 Sq.mts. ( 557 Sq.ft. )18
2 BHKS44 Sq.mts. ( 474 Sq.ft. )18
2 BHKS144.03 Sq.mts. ( 474 Sq.ft. )16
None Booked0% Booked
0% Booked
133 total apartments / 11 apartments booked. 8% apartments booked.
Work Description in Building TulsiCompletion
Excavation
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Neptune Developers Limited
for Project
Neptune Triveni Sangam
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation