Project overview

Labdhi Gardens Phase 3 is a MahaRERA Registered Project bearing MahaRERA Registration Number P51900006804. Labdhi Gardens Phase 3 is located at 3, 81/1, 2. This is a Ongoing being developed by Labdhi Lifestyle Limited.

Labdhi Gardens Phase 3 has LUXURIA & SUPERIA Apartments with carpet areas ranging from 217 to 334 Sq.ft. Carpet. The Project has total 96 of which 26 are currently available for sale.

Labdhi Gardens Phase 3 is being developed on a total land area of 26953 Sq.ft. out of which 23035 Sq.ft. i.e 85% is reserved for recreational purposes. Labdhi Gardens Phase 3 has 4 Wings / Towers Daisy,Edelweiss,Fern,Geranium

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Labdhi Gardens Phase 3
  • Location:
  • 3, 81/1, 2
  • Const. Stage:
    Ongoing
  • Possession:
    31 May 2019
Developer Details

  • Developer:
    Labdhi Lifestyle Limited
  • Phone:
  • Address:
  • Amrit Niwas
Project RERA Details
MAHA REARA No: P51900006804
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Premnath & Associates
Funding Bank ICICI BANK LIMITED
Proposed Possession 31 May 2019
Revised Possession 31 May 2019
Extended Possession
Litigations No Litigations
Last Modified 16 Aug 2017
Last Retrived 26 Jul 2025
Labdhi Gardens Phase 3 QR Code
Labdhi Gardens Phase 3
MahaRERA - P51900006804
Apartment Details & Configuration
TypeArea
LUXURIA31.01 Sq.mts. ( 334 Sq.ft. )
PALACIO25.9 Sq.mts. ( 279 Sq.ft. )
ULTIMO38.07 Sq.mts. ( 410 Sq.ft. )
EFFICIO17.16 Sq.mts. ( 185 Sq.ft. )
GRANDE26.94 Sq.mts. ( 290 Sq.ft. )
SUPERIA20.14 Sq.mts. ( 217 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Labdhi Gardens Phase 3last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space100% completed
95% Complete
Minor Landscaping
Community Buildings100% completed
95% Complete
Clubhouse And Swimming Pool
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Substation &Amp; Transformer
Energy management
Na
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting100% completed
95% Complete
As Per Landscape
Open Parking100% completed
95% Complete
By The Road Side
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Septic Tank
Solid Waste Management And Disposal100% completed
95% Complete
As Facilitated By Local Governing Body
Storm Water Drains100% completed
95% Complete
Concrete Drains
Street Lighting100% completed
95% Complete
Designer Led Street Lamp
Treatment And Disposal Of Sewage And Sullage Water100% completed
95% Complete
Proposed Stp/Septic Tank
Water Conservation, Rain water Harvesting
Na
Water Supply100% completed
95% Complete
Treated Drinking Water Supply
Buildings / Wings in Labdhi Gardens Phase 3
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Labdhi Gardens Phase 3 by Labdhi Lifestyle Limitedlast updated on 26 Jul 2025 as per information obtained from MARA RERA.

26953 Sq. ft.

Project Area

23035 Sq. ft.

Recreational Open Space

Total 4

Wings / Towers in Project

Apartments Statistics

96 apartments in total
Total
96
Booked
70
Available
26

Saleable Area Statistics (Sq. ft.)

31306 Total
Total
31306
Booked
22998
Available
8308
Total 96 apartments in project. 70 apartments booked. 72% apartments booked.
Total 31306 Sq.ft. saleable area. 22998 saleable area booked.
73% area booked.

Daisy

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
DaisyMay 20195100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
LUXURIA31.01 Sq.mts. ( 334 Sq.ft. )10
8 Booked80% Booked
80% Booked
PALACIO25.9 Sq.mts. ( 279 Sq.ft. )1
1 Booked100% Booked
100% Booked
ULTIMO38.07 Sq.mts. ( 410 Sq.ft. )9
8 Booked88% Booked
88% Booked
20 total apartments / 17 apartments booked. 85% apartments booked.
Work Description in Building DaisyCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Edelweiss

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
EdelweissMay 20195100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
LUXURIA31.01 Sq.mts. ( 334 Sq.ft. )8
6 Booked75% Booked
75% Booked
ULTIMO38.07 Sq.mts. ( 410 Sq.ft. )8
5 Booked62% Booked
62% Booked
16 total apartments / 11 apartments booked. 68% apartments booked.
Work Description in Building EdelweissCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Fern

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
FernMay 20195100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
EFFICIO17.16 Sq.mts. ( 185 Sq.ft. )1
None Booked0% Booked
0% Booked
GRANDE26.94 Sq.mts. ( 290 Sq.ft. )39
27 Booked69% Booked
69% Booked
40 total apartments / 27 apartments booked. 67% apartments booked.
Work Description in Building FernCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Geranium

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
GeraniumMay 20195100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
LUXURIA31.01 Sq.mts. ( 334 Sq.ft. )19
14 Booked73% Booked
73% Booked
SUPERIA20.14 Sq.mts. ( 217 Sq.ft. )1
1 Booked100% Booked
100% Booked
20 total apartments / 15 apartments booked. 75% apartments booked.
Work Description in Building GeraniumCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Labdhi Lifestyle Limited
for Project
Labdhi Gardens Phase 3
last updated on 26 Jul 2025 as per information obtained from MARA RERA.