Project overview

Khaliliya Complex is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800008484. Khaliliya Complex is located at 921 Part, 922 Part. This is a Ongoing being developed by Dani Builders And Developers.

Khaliliya Complex has 1 BHK Apartments with carpet areas ranging from 280 to 280 Sq.ft. Carpet. The Project has total 83 of which 7 are currently available for sale.

Khaliliya Complex is being developed on a total land area of 31033 Sq.ft. out of which 6458 Sq.ft. i.e 21% is reserved for recreational purposes. Khaliliya Complex has 7 Wings / Towers Wing A,Wing B,Wing C,Wing D - Sra Building,Wing E - Sra Building,Wing F - Sra Building,Wing G - Sra Building

ProjectDeveloperLocationPossession
Code Name-EnchantedRunwal Construction Private Limited20/5A,B Part, 20/6 Part30-06-2028 00:00:00
Minnat ApartmentHindustan Builder400070, Mumbai Suburban31-12-2020 00:00:00
Fatima Arch And DevelopersFatima Arch & Developers6297/629831-12-2018 00:00:00
Godrej CentralGodrej Landmark Redevelopers Private LimitedCts 49/Pt, 5630-03-2021 00:00:00
Peninsula Technopark Building DSwan Energy Limited81A Part30-09-2018 00:00:00
Rajal - Om Jaishriram Chs LtdNisar Properties Pvt. Ltd.Cts No 977-A31-12-2017 00:00:00
Kurla Kadam Scoiety Phase 1Pramod PisalMumbai Suburban, 40002430-06-2021 00:00:00
Muktanand Co-Op Housing SocietyKuldeep S Pednekar828 Part 1/919-05-2018 00:00:00
Buddha Vihar Chs LtdM/S Regal Builders And Developers462 Part 463 Part 464 Part30-12-2026 00:00:00
East Point.A A Property DevelopersCts No 6P And 7 P Kurla E Mumbai Suburban30-12-2027 00:00:00
Nandadeep ResidencyVinayaka Realtors And Developers49228-11-2022 00:00:00
Mantri Business PlazaMantri BrothersPlot No 239 And 239 1 To 3530-12-2021 00:00:00
Shree Siddhi Bldg No 69Hiranimanthan Builders And Developers12 Pt31-03-2020 00:00:00
Venus TowersVenus EnterprisesMumbai Suburban31-12-2020 00:00:00
Swanand Bldg No 33Hiranimanthan Builders And Developers11 Pt31-12-2019 00:00:00
Ruparel LiviaShree Siddhivinayak Classic Construction Private LimitedCts No 11, Nehru Nagar30-06-2024 00:00:00
Raghav One45Raghav Raj Builders & Developers Llp228-02-2023 00:00:00
Jaswanti BlissAshray Estates78 78/1 To 25 77B 77B/1 To3230-09-2024 00:00:00
Puneet KalpavrikshaPuneet Prateeksha SpacesS No 229 S No 267 Cts 11 Pt30-06-2025 00:00:00
Dadamiyas Deluxe ApartmentDadamiya Infrastructure & Deluxe Infra905, 9051 To 905931-03-2023 00:00:00
Raghav NovaVaidehi Construction & Developers2 Part And 64031-07-2023 00:00:00
Manraj HeightsRaje Shivraj Developers125, 12630-10-2018 00:00:00
Sai ChamundaSai Corporation77A, 77A2, 77A 130-12-2020 00:00:00
Khaliliya ComplexDani Builders And Developers921 Part, 922 Part30-12-2023 00:00:00
Orchid MetropolisBharat Mahan Developers & Builders9A And 10/1A31-07-2018 00:00:00
Royale Residences B And C WingM/S Rani Creators , Consultant And Service Providers9831-12-2019 00:00:00
Onyx ResidencyOnyxbuildersMumbai Suburban, 40007031-12-2018 00:00:00
Project Details
  • Project:
    Khaliliya Complex
  • Location:
  • 921 Part, 922 Part
  • Const. Stage:
    Ongoing
  • Possession:
    30 Dec 2023
Developer Details

  • Developer:
    Dani Builders And Developers
  • Phone:
  • Address:
  • Rassiwala Flats, Ground Floor
Project RERA Details
MAHA REARA No: P51800008484
Project Type Others
RERA Project Status Ongoing
Funding Bank ICICI BANK LIMITED
Proposed Possession 30 Dec 2023
Revised Possession 30 Dec 2023
Extended Possession 31 Dec 2026
Litigations No Litigations
Last Modified 17 Oct 2024
Last Retrived 26 Jul 2025
Khaliliya Complex QR Code
Khaliliya Complex
MahaRERA - P51800008484
Apartment Details & Configuration
TypeArea
2 BHK57.62 Sq.mts. ( 620 Sq.ft. )
2 BHK68.12 Sq.mts. ( 733 Sq.ft. )
3 BHK84.04 Sq.mts. ( 905 Sq.ft. )
3 BHK85.04 Sq.mts. ( 915 Sq.ft. )
NURSING HOME 166.49 Sq.mts. ( 716 Sq.ft. )
NURSING HOME 269.54 Sq.mts. ( 749 Sq.ft. )
NURSING HOME 3104.47 Sq.mts. ( 1125 Sq.ft. )
NURSING HOME 475.03 Sq.mts. ( 808 Sq.ft. )
1 BHK42.29 Sq.mts. ( 455 Sq.ft. )
1RK38.1 Sq.mts. ( 410 Sq.ft. )
1 BHK42.47 Sq.mts. ( 457 Sq.ft. )
1 BHK42.49 Sq.mts. ( 457 Sq.ft. )
1 BHK43.49 Sq.mts. ( 468 Sq.ft. )
3 BHK70.17 Sq.mts. ( 755 Sq.ft. )
3 BHK70.35 Sq.mts. ( 757 Sq.ft. )
1 BHK30.3 Sq.mts. ( 326 Sq.ft. )
1 BHK31.51 Sq.mts. ( 339 Sq.ft. )
1 BHK30.58 Sq.mts. ( 329 Sq.ft. )
Balwadi20.9 Sq.mts. ( 225 Sq.ft. )
1 BHK26.04 Sq.mts. ( 280 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Khaliliya Complexlast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Shall Be Provide Till Oc
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station50% completed
50% Complete
Substation &Amp; Receiving Station Na
Energy management
Na
Fire Protection And Fire Safety Requirements
Shall Be Provide Till Oc
Landscaping & Tree Planting50% completed
50% Complete
Shall Be Provide Till Oc
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)50% completed
50% Complete
Stp &Amp; Septic Tank Na
Solid Waste Management And Disposal
Na
Storm Water Drains50% completed
50% Complete
Shall Be Provide Till Oc
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Na
Water Supply50% completed
50% Complete
Shall Be Provide Till Oc
Buildings / Wings in Khaliliya Complex
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Khaliliya Complex by Dani Builders And Developerslast updated on 26 Jul 2025 as per information obtained from MARA RERA.

31033 Sq. ft.

Project Area

6458 Sq. ft.

Recreational Open Space

Total 7

Wings / Towers in Project

Apartments Statistics

83 apartments in total
Total
83
Booked
76
Available
7

Saleable Area Statistics (Sq. ft.)

49300 Total
Total
49300
Booked
45463
Available
3836
Total 83 apartments in project. 76 apartments booked. 91% apartments booked.
Total 49300 Sq.ft. saleable area. 45463 saleable area booked.
92% area booked.

Wing A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing ADec 20236101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK57.62 Sq.mts. ( 620 Sq.ft. )6
6 Booked100% Booked
100% Booked
2 BHK68.12 Sq.mts. ( 733 Sq.ft. )6
5 Booked83% Booked
83% Booked
3 BHK84.04 Sq.mts. ( 905 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK85.04 Sq.mts. ( 915 Sq.ft. )5
5 Booked100% Booked
100% Booked
NURSING HOME 166.49 Sq.mts. ( 716 Sq.ft. )1
1 Booked100% Booked
100% Booked
NURSING HOME 269.54 Sq.mts. ( 749 Sq.ft. )1
1 Booked100% Booked
100% Booked
NURSING HOME 3104.47 Sq.mts. ( 1125 Sq.ft. )1
1 Booked100% Booked
100% Booked
NURSING HOME 475.03 Sq.mts. ( 808 Sq.ft. )1
1 Booked100% Booked
100% Booked
22 total apartments / 21 apartments booked. 95% apartments booked.
Work Description in Building Wing ACompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress44% done
44% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress44% done
44% Booked

Wing B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing BDec 20236101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK42.29 Sq.mts. ( 455 Sq.ft. )14
11 Booked78% Booked
78% Booked
1RK38.1 Sq.mts. ( 410 Sq.ft. )2
2 Booked100% Booked
100% Booked
2 BHK68.12 Sq.mts. ( 733 Sq.ft. )6
6 Booked100% Booked
100% Booked
22 total apartments / 19 apartments booked. 86% apartments booked.
Work Description in Building Wing BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress44% done
44% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
work-in-progress70% done
70% Booked
X number of Podiums
X number of Slabs of Super Structure

Wing C

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing CDec 20236101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK42.47 Sq.mts. ( 457 Sq.ft. )7
7 Booked100% Booked
100% Booked
1 BHK42.49 Sq.mts. ( 457 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK43.49 Sq.mts. ( 468 Sq.ft. )5
5 Booked100% Booked
100% Booked
2 BHK68.12 Sq.mts. ( 733 Sq.ft. )7
7 Booked100% Booked
100% Booked
3 BHK70.17 Sq.mts. ( 755 Sq.ft. )1
None Booked0% Booked
0% Booked
3 BHK70.35 Sq.mts. ( 757 Sq.ft. )7
6 Booked85% Booked
85% Booked
28 total apartments / 26 apartments booked. 92% apartments booked.
Work Description in Building Wing CCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress44% done
44% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress44% done
44% Booked

Wing D - Sra Building

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing D - Sra BuildingDec 20238100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK30.3 Sq.mts. ( 326 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK31.51 Sq.mts. ( 339 Sq.ft. )4
4 Booked100% Booked
100% Booked
5 total apartments / 5 apartments booked. 100% apartments booked.
Work Description in Building Wing D - Sra BuildingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress90% done
90% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress70% done
70% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress70% done
70% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress95% done
95% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress95% done
95% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress70% done
70% Booked
Sanitary Fittings within the flats / premises
work-in-progress70% done
70% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress90% done
90% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress90% done
90% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress90% done
90% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing E - Sra Building

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing E - Sra BuildingDec 20238100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK30.3 Sq.mts. ( 326 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK30.58 Sq.mts. ( 329 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK31.51 Sq.mts. ( 339 Sq.ft. )2
2 Booked100% Booked
100% Booked
4 total apartments / 4 apartments booked. 100% apartments booked.
Work Description in Building Wing E - Sra BuildingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress90% done
90% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress70% done
70% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress70% done
70% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress95% done
95% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress95% done
95% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress70% done
70% Booked
Sanitary Fittings within the flats / premises
work-in-progress70% done
70% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress90% done
90% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress90% done
90% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress90% done
90% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing F - Sra Building

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing F - Sra BuildingDec 20238100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Balwadi20.9 Sq.mts. ( 225 Sq.ft. )1
None Booked0% Booked
0% Booked
1 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Wing F - Sra BuildingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress90% done
90% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress70% done
70% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress70% done
70% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress95% done
95% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress95% done
95% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress70% done
70% Booked
Sanitary Fittings within the flats / premises
work-in-progress70% done
70% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress90% done
90% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress90% done
90% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress90% done
90% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing G - Sra Building

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing G - Sra BuildingDec 20238100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK26.04 Sq.mts. ( 280 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 total apartments / 1 apartments booked. 100% apartments booked.
Work Description in Building Wing G - Sra BuildingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress90% done
90% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress70% done
70% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress70% done
70% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress95% done
95% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress95% done
95% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress70% done
70% Booked
Sanitary Fittings within the flats / premises
work-in-progress70% done
70% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress90% done
90% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress90% done
90% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress90% done
90% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Dani Builders And Developers
for Project
Khaliliya Complex
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation