Project overview
Industrial Building No 1 is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000011126. Industrial Building No 1 is located at Palghar, 401208. This is a On-Going Project being developed by Shree Narayan Industrial Developers.
Industrial Building No 1 has COMMERCIAL Apartments with carpet areas ranging from 26066 to 26066 Sq.ft. Carpet. The Project has total 32 of which 0 are currently available for sale.
Industrial Building No 1 is being developed on a total land area of 28455 Sq.ft. Industrial Building No 1 has 1 Wings / Towers Building No 1
| Project | Developer | Location | Possession |
-
Project:
Industrial Building No 1
-
Location:
-
Palghar, 401208
-
Const. Stage:
On-Going Project
-
Possession:
30 Dec 2019
-
Developer:
Shree Narayan Industrial Developers
-
Phone:
-
Address:
-
0, Shree Narayan Industry, Bilalpada, Chinchpada Bus Stop, Vasai East, 401208
| MAHA REARA No: |
P99000011126 |
| Project Type |
Commercial |
| RERA Project Status |
On-Going Project |
| Funding Bank |
BCCB |
| Proposed Possession |
30 Dec 2019 |
| Revised Possession |
30 Dec 2021 |
| Extended Possession |
30 Dec 2023 |
| Litigations |
No Litigations |
| Last Modified |
01 Jun 2023 |
| Last Retrived |
28 Jul 2025 |
Industrial Building No 1 QR Code
Industrial Building No 1
MahaRERA - P99000011126
| Type | Area |
| COMMERCIAL | 2421.55 Sq.mts. ( 26066 Sq.ft. ) |
Facilities & Amenities
Facilities, Amenities & Common areas details of Industrial Building No 1last updated on 28 Jul 2025 as per information obtained from MARA RERA.
| Project Facilities & Amenities |
Available |
Details |
Aggregate area of recreational Open Space
|
|
Na |
|
|
|
Na |
Electrical Meter Room, Sub-Station, Receiving Station50% completed
|
|
Wip |
|
|
|
Na |
Fire Protection And Fire Safety
Requirements
|
|
Wip |
Landscaping & Tree Planting
|
|
Facility Available In A Larger Layout |
|
|
|
Na |
Sewerage (Chamber, Lines, Septic Tank , STP)20% completed
|
|
Facility Available In A Larger Layour |
Solid Waste Management And Disposal
|
|
Wip |
|
|
|
Facility Available In A Larger Layout |
|
|
|
Na |
Treatment And Disposal Of Sewage And Sullage Water
|
|
Na |
Water Conservation, Rain water Harvesting
|
|
Wip |
|
|
|
Facility Will Start Once Vvmv Water Supply Commenc |
Buildings / Wings in Industrial Building No 1
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Industrial Building No 1 by Shree Narayan Industrial Developerslast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Apartments Statistics
32
apartments in total
Saleable Area Statistics (Sq. ft.)
834098
Total
Total 32 apartments in project. 32 apartments booked. 100% apartments booked.
Total 834098 Sq.ft. saleable area. 834098 saleable area booked.
100% area booked.
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| Building No 1 | Dec 2021 | 2 | 1 | 0 | 0 | 0 | 0 | 0 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| COMMERCIAL | 2421.55 Sq.mts. ( 26066 Sq.ft. ) | 32 | |
32 total apartments / 32 apartments booked. 100% apartments booked. |
| Work Description in Building Building No 1 | Completion |
| Excavation | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
Channel Partners Registered by Developer
Shree Narayan Industrial Developers
for Project
Industrial Building No 1
last updated on
28 Jul 2025 as per information obtained from MARA RERA.
| Name |
Company |
Location |
Mobile |
Designation |