Project overview

Industrial Building No 1 is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000011126. Industrial Building No 1 is located at Palghar, 401208. This is a On-Going Project being developed by Shree Narayan Industrial Developers.

Industrial Building No 1 has COMMERCIAL Apartments with carpet areas ranging from 26066 to 26066 Sq.ft. Carpet. The Project has total 32 of which 0 are currently available for sale.

Industrial Building No 1 is being developed on a total land area of 28455 Sq.ft. Industrial Building No 1 has 1 Wings / Towers Building No 1

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Industrial Building No 1
  • Location:
  • Palghar, 401208
  • Const. Stage:
    On-Going Project
  • Possession:
    30 Dec 2019
Developer Details

  • Developer:
    Shree Narayan Industrial Developers
  • Phone:
  • Address:
  • 0, Shree Narayan Industry, Bilalpada, Chinchpada Bus Stop, Vasai East, 401208
Project RERA Details
MAHA REARA No: P99000011126
Project Type Commercial
RERA Project Status On-Going Project
Funding Bank BCCB
Proposed Possession 30 Dec 2019
Revised Possession 30 Dec 2021
Extended Possession 30 Dec 2023
Litigations No Litigations
Last Modified 01 Jun 2023
Last Retrived 28 Jul 2025
Industrial Building No 1 QR Code
Industrial Building No 1
MahaRERA - P99000011126
Apartment Details & Configuration
TypeArea
COMMERCIAL2421.55 Sq.mts. ( 26066 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Industrial Building No 1last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station50% completed
50% Complete
Wip
Energy management
Na
Fire Protection And Fire Safety Requirements
Wip
Landscaping & Tree Planting
Facility Available In A Larger Layout
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)20% completed
20% Complete
Facility Available In A Larger Layour
Solid Waste Management And Disposal
Wip
Storm Water Drains
Facility Available In A Larger Layout
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Wip
Water Supply
Facility Will Start Once Vvmv Water Supply Commenc
Buildings / Wings in Industrial Building No 1
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Industrial Building No 1 by Shree Narayan Industrial Developerslast updated on 28 Jul 2025 as per information obtained from MARA RERA.

28455 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

32 apartments in total
Total
32
Booked
32
Available
0

Saleable Area Statistics (Sq. ft.)

834098 Total
Total
834098
Booked
834098
Available
0
Total 32 apartments in project. 32 apartments booked. 100% apartments booked.
Total 834098 Sq.ft. saleable area. 834098 saleable area booked.
100% area booked.

Building No 1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 1Dec 20212100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
COMMERCIAL2421.55 Sq.mts. ( 26066 Sq.ft. )32
32 Booked100% Booked
100% Booked
32 total apartments / 32 apartments booked. 100% apartments booked.
Work Description in Building Building No 1Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress26% done
26% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Shree Narayan Industrial Developers
for Project
Industrial Building No 1
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation