Project overview

Guru Dwarka is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800014414. Guru Dwarka is located at Mumbai Suburban. This is a New Project being developed by Bsrd Infrabuild Private Limited.

Guru Dwarka has 1 BHK & 2 BHK Apartments with carpet areas ranging from 377 to 591 Sq.ft. Carpet. The Project has total 203 of which 47 are currently available for sale.

Guru Dwarka is being developed on a total land area of 29147 Sq.ft. Guru Dwarka has 3 Wings / Towers Wing A,Wing B,Wing C

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Guru Dwarka
  • Location:
  • Mumbai Suburban
  • Const. Stage:
    New Project
  • Possession:
    30 Dec 2022
Developer Details

  • Developer:
    Bsrd Infrabuild Private Limited
  • Phone:
  • Address:
  • 77 - B Wing, Mittal Tower, Free Press General Marg, Mumbai, Nariman Point, 400021
Project RERA Details
MAHA REARA No: P51800014414
Project Type Residential
RERA Project Status New Project
Funding Bank HDFC BANK
Proposed Possession 30 Dec 2022
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 07 Dec 2023
Last Retrived 28 Jul 2025
Guru Dwarka QR Code
Guru Dwarka
MahaRERA - P51800014414
Apartment Details & Configuration
TypeArea
1 BHK39.2 Sq.mts. ( 422 Sq.ft. )
1 BHK44.04 Sq.mts. ( 474 Sq.ft. )
2 BHK54.91 Sq.mts. ( 591 Sq.ft. )
1 BHK39.39 Sq.mts. ( 424 Sq.ft. )
3 BHK84.36 Sq.mts. ( 908 Sq.ft. )
1 BHK35.02 Sq.mts. ( 377 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Guru Dwarkalast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Before Oc
Energy management
Na
Fire Protection And Fire Safety Requirements
Before Oc
Landscaping & Tree Planting
Na
Open Parking
Before Oc
Sewerage (Chamber, Lines, Septic Tank , STP)
Before Oc
Solid Waste Management And Disposal
Na
Storm Water Drains
Na
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Na
Water Supply
Before Oc
Buildings / Wings in Guru Dwarka
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Guru Dwarka by Bsrd Infrabuild Private Limitedlast updated on 28 Jul 2025 as per information obtained from MARA RERA.

29147 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 3

Wings / Towers in Project

Apartments Statistics

203 apartments in total
Total
203
Booked
156
Available
47

Saleable Area Statistics (Sq. ft.)

100173 Total
Total
100173
Booked
76712
Available
23461
Total 203 apartments in project. 156 apartments booked. 76% apartments booked.
Total 100173 Sq.ft. saleable area. 76712 saleable area booked.
77% area booked.

Wing A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing AJun 202223101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK39.2 Sq.mts. ( 422 Sq.ft. )23
18 Booked78% Booked
78% Booked
1 BHK44.04 Sq.mts. ( 474 Sq.ft. )15
12 Booked80% Booked
80% Booked
2 BHK54.91 Sq.mts. ( 591 Sq.ft. )45
34 Booked75% Booked
75% Booked
83 total apartments / 64 apartments booked. 77% apartments booked.
Work Description in Building Wing ACompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress55% done
55% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress20% done
20% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress25% done
25% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure

Wing B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing BJun 202223101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK39.39 Sq.mts. ( 424 Sq.ft. )46
36 Booked78% Booked
78% Booked
1 BHK44.04 Sq.mts. ( 474 Sq.ft. )32
23 Booked71% Booked
71% Booked
3 BHK84.36 Sq.mts. ( 908 Sq.ft. )1
None Booked0% Booked
0% Booked
79 total apartments / 59 apartments booked. 74% apartments booked.
Work Description in Building Wing BCompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress55% done
55% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress20% done
20% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress25% done
25% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure

Wing C

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing CJun 202223101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK35.02 Sq.mts. ( 377 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK39.39 Sq.mts. ( 424 Sq.ft. )17
14 Booked82% Booked
82% Booked
2 BHK54.91 Sq.mts. ( 591 Sq.ft. )23
19 Booked82% Booked
82% Booked
41 total apartments / 33 apartments booked. 80% apartments booked.
Work Description in Building Wing CCompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress55% done
55% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress20% done
20% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress25% done
25% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Bsrd Infrabuild Private Limited
for Project
Guru Dwarka
last updated on 28 Jul 2025 as per information obtained from MARA RERA.