Project overview

Gulraj Paradise is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800004371. Gulraj Paradise is located at C S No 25 Pt 55Pt 62Pt 67Pt To 72. This is a Ongoing being developed by M/S Reliable Construction.

Gulraj Paradise has 1 BHK Apartments with carpet areas ranging from 269 to 269 Sq.ft. Carpet. The Project has total 377 of which 48 are currently available for sale.

Gulraj Paradise is being developed on a total land area of 61280 Sq.ft. out of which 4490 Sq.ft. i.e 7% is reserved for recreational purposes. Gulraj Paradise has 2 Wings / Towers Gulraj Paradise Wing A B C D - Sale,Ratnamal Tower

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Gulraj Paradise
  • Location:
  • C S No 25 Pt 55Pt 62Pt 67Pt To 72
  • Const. Stage:
    Ongoing
  • Possession:
    30 Jun 2021
Developer Details

  • Developer:
    M/S Reliable Construction
  • Phone:
  • Address:
  • Dheeraj Heritage
Project RERA Details
MAHA REARA No: P51800004371
Project Type Others
RERA Project Status Ongoing
Architect Atharva Consultants
Funding Bank BANK OF BARODA
Proposed Possession 30 Jun 2021
Revised Possession 30 Jun 2021
Extended Possession 30 Sep 2024
Litigations No Litigations
Last Modified 19 Jan 2024
Last Retrived 26 Jul 2025
Gulraj Paradise QR Code
Gulraj Paradise
MahaRERA - P51800004371
Apartment Details & Configuration
TypeArea
1 BHK31.45 Sq.mts. ( 339 Sq.ft. )
1 BHK31.69 Sq.mts. ( 341 Sq.ft. )
1 BHK32.53 Sq.mts. ( 350 Sq.ft. )
1 BHK33.2 Sq.mts. ( 357 Sq.ft. )
1 BHK33.42 Sq.mts. ( 360 Sq.ft. )
1 BHK25 Sq.mts. ( 269 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Gulraj Paradiselast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
0
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
0
Energy management
Reciving Station Not Applicable
Fire Protection And Fire Safety Requirements
0
Landscaping & Tree Planting
0
Open Parking
0
Sewerage (Chamber, Lines, Septic Tank , STP)
Septic Tank Not Available
Solid Waste Management And Disposal
0
Storm Water Drains
0
Street Lighting
0
Treatment And Disposal Of Sewage And Sullage Water
0
Water Conservation, Rain water Harvesting
0
Water Supply
0
Buildings / Wings in Gulraj Paradise
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Gulraj Paradise by M/S Reliable Constructionlast updated on 26 Jul 2025 as per information obtained from MARA RERA.

61280 Sq. ft.

Project Area

4490 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

377 apartments in total
Total
377
Booked
329
Available
48

Saleable Area Statistics (Sq. ft.)

130035 Total
Total
130035
Booked
114658
Available
15377
Total 377 apartments in project. 329 apartments booked. 87% apartments booked.
Total 130035 Sq.ft. saleable area. 114658 saleable area booked.
88% area booked.

Gulraj Paradise Wing A B C D - Sale

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Gulraj Paradise Wing A B C D - SaleDec 2020241010151
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK31.45 Sq.mts. ( 339 Sq.ft. )84
79 Booked94% Booked
94% Booked
1 BHK31.69 Sq.mts. ( 341 Sq.ft. )92
82 Booked89% Booked
89% Booked
1 BHK32.53 Sq.mts. ( 350 Sq.ft. )46
42 Booked91% Booked
91% Booked
1 BHK33.2 Sq.mts. ( 357 Sq.ft. )46
38 Booked82% Booked
82% Booked
1 BHK33.42 Sq.mts. ( 360 Sq.ft. )92
88 Booked95% Booked
95% Booked
360 total apartments / 329 apartments booked. 91% apartments booked.
Work Description in Building Gulraj Paradise Wing A B C D - SaleCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress73% done
73% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
work-in-progress39% done
39% Booked
Slabs of Super Structure
work-in-progress87% done
87% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress87% done
87% Booked
Stilt Floor

Ratnamal Tower

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Ratnamal TowerDec 2020010170017
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK25 Sq.mts. ( 269 Sq.ft. )17
None Booked0% Booked
0% Booked
17 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Ratnamal TowerCompletion
Basement (if any)
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress44% done
44% Booked
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
work-in-progress37% done
37% Booked
Slabs of Super Structure
work-in-progress75% done
75% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
M/S Reliable Construction
for Project
Gulraj Paradise
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation