Project overview

Avenue Wing A is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800002030. Avenue Wing A is located at 3A/1Pt, Village Charkop, Cts No 467 Pt. This is a Ongoing being developed by Dharmesh Constructions Private Limited.

Avenue Wing A has 2 BHK Area 1, 2 BHK Area 2, 2 BHK Area 3, 2 BHK Area 4, 2 BHK Area 5 & 3 BHK Area 1 Apartments with carpet areas ranging from 640 to 1056 Sq.ft. Carpet. The Project has total 195 of which 5 are currently available for sale.

Avenue Wing A is being developed on a total land area of 7963 Sq.ft. Avenue Wing A has 1 Wings / Towers Wing A

ProjectDeveloperLocationPossession
Damodar TowerJaanvi DevelopersOld Survey No. 136 Hissa No. 4-Part / New Survey No. 98 Hissa No. 4C31-03-2026 00:00:00
Puja HeightsC G Housing Infra Pvt Ltd C G Housing Infra Pvt LtdMumbai Suburban31-03-2019 00:00:00
Zee SahyadriZee Infra Projects Private Limited643, Fp 21 Tps Andheri30-12-2023 00:00:00
Arpan Chs LtdParshvanath Superstructures Private Limited35531-12-2019 00:00:00
Kavya Shree LaxmiKavya Kcd DevelopersC.T.S. No. 1C/1/283, Plot No. 22330-06-2021 00:00:00
Shree Prafull ChslShree Shyam DevelopersCts No 894 And 89501-03-2021 00:00:00
Building On Portion Of Sub Plot D Cts No 625 A 4 625 B Pt 627 A Of Kandivali West Mumbai 67 East And West BuildersBuilding On Portion Of Sub Plot D Cts No 625 A 4 625 B Pt 627 A Of Kandivali West Mumbai 6730-12-2023 00:00:00
Modi HouseModi Enterprise337B, 337A31-12-2017 00:00:00
Neelyog AashiyanaNeelyog Construction Pvt Ltd1069Pt And 1028Bpt30-03-2023 00:00:00
Xpoint Redevelopment Of Prem Bhavna ChslRodium Properties Division Of Rodium Realty Ltd.379 A 379 A / 1 To 430-12-2021 00:00:00
Ruparel Palacio Ph IShree Siddhivinayak Infrastructure & Realty725 Pt30-12-2023 00:00:00
Redevelopment Of Existing Building No. 5 Known As Mahavir Nagar Tri-Star ChslBharat Realty Venture Private LimitedPlot No 32, Cts No 128/A/24/A/1 Pt.30-12-2023 00:00:00
Rashmi SheelaModis Navnirman Llp934, 93511-02-2021 00:00:00
Ruparel ElaraShree Siddhivinayak Infrastructure & Realty79531-12-2019 00:00:00
Shriji HeritageShriji Apartments Co-Operative Housing Society Limited2 And 3, 166, 166/130-11-2020 00:00:00
Swami DarshanGirish Rupshi Gada119530-12-2022 00:00:00
Medha ChslC H Patil And Sons LlpCts No 86531-03-2019 00:00:00
Gyan KutirSungreens Corp328A/I31-03-2018 00:00:00
Kandivali Geeta Sadan Chs LtdMs Prathmesh Landmark ConsultancyCts No258 258 1 To 4 Village Malad North30-06-2019 00:00:00
AmanKandur Corporation299/1 To 21, 29930-06-2018 00:00:00
Royal Samarpan Phase 1Shreeji Construction1110 Pt 1111 Pt30-06-2021 00:00:00
Rite DivineRite Developers Pvt. Ltd.Cts No 1164 1164-1 To 731-12-2017 00:00:00
LoginBombay Slum Redevelopment Corporation Pvt. Ltd.886 Pt30-09-2022 00:00:00
Rite BlissRite Developers Pvt. Ltd.40006730-12-2021 00:00:00
Kalpavruksh Garden IiiMahendra J Vora & OthersPortion Of Cts No 128/B/3 Of Village Kandivali30-06-2021 00:00:00
Charkop Jinprem Co Op Housing Society LtdCharkop Jinprem Co. Op. Housing Society LtdPlot No 224 Cts 1C-1/578 Kandivali R/C Rdp 530-12-2021 00:00:00
73 EastDimple Realtors Private Limited722, 710, 721, 711-B/711-C, 69430-12-2025 00:00:00
Amrut TaraShree Ram Buildeers98530-12-2023 00:00:00
Bhavya HeightsBhavya Infrastructures India Private Limited1305 A 216431-12-2019 00:00:00
Kamala Chs LtdPravesh Kirti KantherCts No 236 And 236 1 To 18 And 237 And 237 1 To 1631-12-2024 00:00:00
Solitaire IiTulsi Enterprise Joint Venture269/A-3, 267/A, 268/A31-12-2018 00:00:00
Gabadia HeightsGurdeep, Kuldeep, Nirmal, Jaswinder, Ranjeet221/1 To 4, Plot Bearing Cts No 22128-02-2021 00:00:00
Avenue Wing BDharmesh Constructions Private LimitedCts No 3A/1 Pt 467 Pt30-06-2021 00:00:00
Hum Sub ChslShraddharpan Developers304, 304 / 1 - 930-06-2018 00:00:00
Raviraj RoyalM/S Raviraj DevelopersA2, 256A115-05-2022 00:00:00
Avenue Wing ADharmesh Constructions Private Limited3A/1Pt, Village Charkop, Cts No 467 Pt31-12-2019 00:00:00
Sudha AvenueM/S. Chamunda Enterprises128031-12-2018 00:00:00
KalpvrukshIkira Build Tech Llp15430-06-2021 00:00:00
Sugra Heritage Chs LtdMs Developers1305 A 130-12-2021 00:00:00
Radhakrishna Chs LtdWestin Sankalp Developers1026 1026/1 To 630-12-2022 00:00:00
Gaurav PalaceRavi Foundation10031-12-2017 00:00:00
TandiceManish Mahesh Dholakia960/1 To 18, 96031-07-2019 00:00:00
Gabadia HomesGurdeep, Kuldeep, Nirmal, Jaswinder, Ranjeet221/1 To 4, Plot Bearing Cts No 22128-02-2021 00:00:00
Meridian Court 1Vijaykamal Properties Pvt Ltd471/A Pt30-12-2024 00:00:00
Ruparel WestskyShreeji Construction73230-06-2023 00:00:00
Building On Sub Plot A Cts No 283 D Pt 287 A Pt 287 B 1 And 616 A At Kandivali WestSkyline Construction Co.Building On Sub Plot A Cts No 283 D Pt 287 A Pt 287 B 1 And 616 A At Kandivali West31-12-2019 00:00:00
Shree Abhishek Co-Operative Housing Society LimitedDivya EnterpriseCts No. 1339/B/230-11-2020 00:00:00
Sarla AvenueSandeep Mahendra Kanakia303/A 303/B31-10-2018 00:00:00
J-25 Icon HeightsIcon DevelopersNext To Axis Bank31-12-2019 00:00:00
Modirealty WisteriaModirealty Developers Pvt LtdPlot No. 212/ Cts No.1/C/1/386 - 149 (Part)31-03-2026 00:00:00
Shreyaan ResidencyVidisha Real Estate Developers Pvt Ltd369 A/230-09-2027 00:00:00
Madhuban HeghtsHiral Real Estate Developers Llp1068/317-05-2025 00:00:00
Plot No 3 Charkop Sector 8Maharashtra Housing And Area Development Authority3/A/131-12-2018 00:00:00
Plot No.2Maharashtra Housing And Area Development AuthorityS No 41 Cts No 3A130-12-2018 00:00:00
Constn Of 219 Ts And 172 Mig Ts On Cts No 128 A 12 Pt At Mahaveer Nagar Kandivali W Mumbai Maharashtra Housing And Area Development Authority128 A1 2 P31-12-2019 00:00:00
ShantiniketanNamorealty And Infra LlpCts No -1301/ 16, Plot No -730-11-2022 00:00:00
Anant TaraAnant Chhaya Developers623, 622 Pt, 62130-06-2025 00:00:00
Kush EleganteKush Realcon LlpCts No 1C/1/701, Plot No 18830-06-2024 00:00:00
Raj ResidencyRajesh SurtiMumbai Suburban07-01-2009 00:00:00
Building On Sub Plot F Of Cts No 283 A And 238 B Of Kandivali WestEast And West BuildersBuilding On Sub Plot F Of Cts No 283 A And 283 B Of Village Kandivali West Mumbai-6731-07-2019 00:00:00
Rite CelestaRite Developers Pvt. Ltd.Cts No 91131-12-2017 00:00:00
Rudra HeightsSwayam DevelopersMumbai Suburban, 40006701-01-2021 00:00:00
Anshul Heights C WingChandrakosha Kontructions Private Limited1C11 Pt28-02-2021 00:00:00
CastaliaTriax Developers LlpCts No 72031-12-2025 00:00:00
Kandivali Basant BaharWestin Sankalp Developers988, 988/1.988/231-12-2023 00:00:00
Ajit Mulund ChsYug DevelopersMulund West31-03-2024 00:00:00
Shreenath EnclaveShreenathji Infracon Build Pvt. Ltd.142B30-11-2025 00:00:00
Rock HighlandRock EstatesProposed Building No 3 On Sub Plot C Of Land Bearing Cts No. 1A/1 Of Village Kandivali30-12-2026 00:00:00
Buildings On Portion Of Sub Plot A Cts No 671A 662A 610A Etc Of KandivaliAnubhav Anilkumar AggarwalBuilding On Portion Of Sub Plot A Cts No 671A 662A 610A 611A1 Pt 656A Pt 611B 612Apt Of Kandivali W30-04-2018 00:00:00
IbisBau Developers Private Limited128A 4 Pt Of Village Kandivali Taluka Borivali Mumbai Suburban31-12-2017 00:00:00
Kailash HeightsRanjana Construction Pvt Ltd170A31-12-2019 00:00:00
Kavya Kcd PrestineKavya Kcd Buildcon Llp100029-02-2020 00:00:00
Rashmi SadhnaModis Navnirman LlpCts No 929 Of Village Kandivali At Junction Of Datta Mandir Road And Ravi Mahajan Road11-08-2019 00:00:00
Hiral LegacyHiral Homes400067, Mumbai Suburban30-06-2018 00:00:00
Const Of 586 Ews 234 Mig Tenaments On Land Bearing Cts No 1 C 1 1 Borivali West Mumbai 67Maharashtra Housing And Area Development Authority1C 1 1 Pt31-12-2017 00:00:00
Kandivali Shiv Krupa ChslNeminath Construction363/1 To 6, 36331-10-2019 00:00:00
Dharti SraMilan Nemji GalaCts No 6A Part 5 Village Malvani Situated At Jankalyan Nagar And Cts No 3 A 1 Part Village Charkop31-12-2017 00:00:00
Siddha SeabrookM/S Brizeal Realtors & Developers Llp817/818/819A/819B/850B/855/85930-12-2022 00:00:00
Phase 1 Shree NikunjMamtora Enterprise433, 434/B-2 And 434/B, 433/1 To 1331-01-2018 00:00:00
AurumTrinity Consortium Development Private Limited400067, Mumbai Suburban31-12-2024 00:00:00
Anantraj Cooperative Housing Society LimitedAristocrat Realty Pvt Ltd13/99830-09-2018 00:00:00
Anant BhoomiM Construction Company & AssociatesCts No 128 A 4530-12-2020 00:00:00
Kanyakumari HeightsKanyakumari Enterprises648-65031-03-2018 00:00:00
Jeevan HeightsJ. P. Realtors628A And 629C30-12-2020 00:00:00
Sai DivineShreeji DevelopersCts No 1C/2/281, Rdp - 2, Plot No 1631-12-2026 00:00:00
Charkop 1 Abhilasha Co Operative Housing Society LimitedCharkop (1) Abhilasha Co Operative Housing Society Limited1C/2/249 Plot No 11631-12-2026 00:00:00
Shree Laxmi VandanPragati Land Developers160A And 160B30-06-2023 00:00:00
Adarsh Nagar Sra Chs Ltd.Bombay Slum Redevelopment Corporation Pvt. Ltd.886 Pt30-03-2023 00:00:00
Prathamesh EliteShree Sainath Developers85831-12-2026 00:00:00
Ruparel Skygreens IShree Siddhivinayak Infrastructure & Realty735, 744Pt, 750Pt, 752, 751Pt, 747Pt30-12-2022 00:00:00
Meridian Courts Tower 2Vijaykamal Properties Pvt LtdMumbai Suburban, 40006730-12-2024 00:00:00
Patel Associates A/C Jay SonalPatel Associates A/C Jay Sonal318 A B, 44B Cts No.318, 318B 1 To 2030-06-2021 00:00:00
ShreejiaikyamRushabh DevelopersCts 128A/2(Pt)31-12-2028 00:00:00
J-24 Mahavir Nagar Chs LtdKonark Rajendra Shah128A/53/1 (Pt)31-03-2025 00:00:00
ArthayaSri Artha Buildtech Private LimitedC.T.S. No.-67330-04-2028 00:00:00
Parekh RadianceParekh Buildprojects Private Limited116631-03-2026 00:00:00
Vaswani Vista OneVaswani Projects Private Limited1065, 106631-12-2026 00:00:00
Jaswanti JewelParadise Construction Company1327 A31-12-2027 00:00:00
Tanna HeightsTanna Housing9330-12-2021 00:00:00
Burhani BuildingMs Developers1194 C/1 A And 1194 C/1 B30-12-2020 00:00:00
Ambrose HeightsDadamiya Infrastructure Llp129831-03-2027 00:00:00
Project Details
  • Project:
    Avenue Wing A
  • Location:
  • 3A/1Pt, Village Charkop, Cts No 467 Pt
  • Const. Stage:
    Ongoing
  • Possession:
    31 Dec 2019
Developer Details

  • Developer:
    Dharmesh Constructions Private Limited
  • Phone:
  • Address:
  • Acme Ghar
Project RERA Details
MAHA REARA No: P51800002030
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Mr.Mukesh Bahadur Of Consultants Combined
Funding Bank HDFC BANK
Proposed Possession 31 Dec 2019
Revised Possession 31 Dec 2019
Extended Possession 30 Dec 2021
Litigations No Litigations
Last Modified 09 Sep 2021
Last Retrived 26 Jul 2025
Avenue Wing A QR Code
Avenue Wing A
MahaRERA - P51800002030
Apartment Details & Configuration
TypeArea
2 BHK Area 159.58 Sq.mts. ( 641 Sq.ft. )
2 BHK Area 259.49 Sq.mts. ( 640 Sq.ft. )
2 BHK Area 364.66 Sq.mts. ( 696 Sq.ft. )
2 BHK Area 465.33 Sq.mts. ( 703 Sq.ft. )
2 BHK Area 569.05 Sq.mts. ( 743 Sq.ft. )
3 BHK Area 198.1 Sq.mts. ( 1056 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Avenue Wing Alast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
2 Level podium100% completed
95% Complete
Common To All Users Of The Larger Layout
Aggregate area of recreational Open Space
Common To All Users Of The Larger Layout
Amenities
Common To All Users Of The Larger Layout
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station45% completed
45% Complete
Common To All Users Of The Larger Layout
Energy management
Common To All Users Of The Larger Layout
External Podium32% completed
32% Complete
Common To All Users Of The Larger Layout
Fire Protection And Fire Safety Requirements
Common To All Users Of The Larger Layout
Landscaping & Tree Planting
Common To All Users Of The Larger Layout
Open Parking
Common To All Users Of The Larger Layout
Sewerage (Chamber, Lines, Septic Tank , STP)
Common To All Users Of The Larger Layout
Solid Waste Management And Disposal80% completed
80% Complete
Common To All Users Of The Larger Layout
Stilt100% completed
95% Complete
Common To All Users Of The Larger Layout
Storm Water Drains20% completed
20% Complete
Common To All Users Of The Larger Layout
Street Lighting
Common To All Users Of The Larger Layout
Treatment And Disposal Of Sewage And Sullage Water80% completed
80% Complete
Common To All Users Of The Larger Layout
Water Conservation, Rain water Harvesting
Common To All Users Of The Larger Layout
Water Supply
Common To All Users Of The Larger Layout
Buildings / Wings in Avenue Wing A
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Avenue Wing A by Dharmesh Constructions Private Limitedlast updated on 26 Jul 2025 as per information obtained from MARA RERA.

7963 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

195 apartments in total
Total
195
Booked
190
Available
5

Saleable Area Statistics (Sq. ft.)

155418 Total
Total
155418
Booked
151219
Available
4200
Total 195 apartments in project. 190 apartments booked. 97% apartments booked.
Total 155418 Sq.ft. saleable area. 151219 saleable area booked.
97% area booked.

Wing A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing ASep 202131000000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK Area 159.58 Sq.mts. ( 641 Sq.ft. )25
24 Booked96% Booked
96% Booked
2 BHK Area 259.49 Sq.mts. ( 640 Sq.ft. )25
25 Booked100% Booked
100% Booked
2 BHK Area 364.66 Sq.mts. ( 696 Sq.ft. )29
29 Booked100% Booked
100% Booked
2 BHK Area 465.33 Sq.mts. ( 703 Sq.ft. )29
28 Booked96% Booked
96% Booked
2 BHK Area 569.05 Sq.mts. ( 743 Sq.ft. )29
28 Booked96% Booked
96% Booked
3 BHK Area 198.1 Sq.mts. ( 1056 Sq.ft. )58
56 Booked96% Booked
96% Booked
195 total apartments / 190 apartments booked. 97% apartments booked.
Work Description in Building Wing ACompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress64% done
64% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress26% done
26% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress97% done
97% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
work-in-progress35% done
35% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress65% done
65% Booked
Stilt Floor
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Dharmesh Constructions Private Limited
for Project
Avenue Wing A
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation